1

Supervisory wide-area control for multi-machine power system

Yang, Xue Jiao January 2012 (has links)
With the increasing demand for electrical power and the growing need for the restructuring of the power industry, electric power systems have become highly complex with inherent complicated dynamics. Therefore, the study of power system stability has continued to receive significant attention from both academic researchers and industrial practitioners. This thesis focuses on supervisory wide-area control for rotor angle stability of multi-machine power systems using Linear Quadratic Gaussian/Loop Transfer Recovery (LQG/LTR) control theory with guaranteed robustness. The supervisory controllers are developed in both continuous-time and discrete-time framework and their performances and robustness are assessed using both frequency-domain tools, and time-domain simulation results. The impact of the communication time-delays that commonly exist in wide-area power system control on the performance and robustness of the closed-loop system is investigated. In particular, different methods of incorporating such time-delays into the design of the supervisory LQG controller are considered. This thesis proposes a modified supervisory LQG controller that utilizes the Extended Kalman Filter to estimate the unknown/varying time-delays. Simulation results obtained using numerical examples involving non-linear power system models demonstrate the benefits of the proposed scheme for both time-invariant and time-varying delays. The resulting supervisory control scheme is well suited for maintaining power system stability in the presence of communication time-delays.
2

Wide Area Measurement Applications for Improvement of Power System Protection

Tania, Mutmainna 21 January 2013 (has links)
The increasing demand for electricity over the last few decades has not been followed by adequate growth in electric infrastructure. As a result, the reliability and safety of the electric grids are facing tremendously growing pressure. Large blackouts in the recent past indicate that sustaining system reliability and integrity turns out to be more and more difficult due to reduced transmission capacity margins and increased stress on the system. Due to the heavy loading conditions that occur when the system is under stress, the protection systems are susceptible to mis-operation. It is under such severe situations that the network cannot afford to lose its critical elements like the main generation units and transmission corridors. In addition to the slow but steady variations in the network structure over a long term, the grid also experiences drastic changes during the occurrence of a disturbance. One of the main reasons why protection relays mis-operate is due to the inability of the relays to adjust to the evolving network scenario. Such failures greatly compound the severity of the disturbance, while diminishing network integrity leading to catastrophic system-wide outages. With the advancement of Wide Area Measurement Systems (WAMS), it is now possible to redesign network protection schemes to make them more adaptive and thus improve the security of the system. Often flagged for exacerbating the events leading to a blackout, the back-up distance protection relay scheme for transmission line protection and the loss-of-field relay scheme for generator unit protection can be greatly improved from an adaptability-oriented redesign. Protection schemes in general would benefit from a power re-distribution technique that helps predict generator outputs immediately after the occurrence of a contingency. / Ph. D.
3

Study of Global Power System Frequency Behavior Based on Simulations and FNET Measurements

Tsai, Shu-Jen Steven 22 July 2005 (has links)
A global view of power system's frequency opens up a new window to the "world" of large system's dynamics. With the aid of global positioning system (GPS), measurements from different locations can be time-synchronized; therefore, a system-wide observation and analysis would be possible. As part of the U.S. nation-wide power frequency monitoring network project (FNET), the first part of the study focuses on utilizing system simulation as a tool to assess the frequency measurement accuracy needed to observe frequency oscillations from events such as remote generation drops in three U.S. power systems. Electromechanical wave propagation phenomena during system disturbances, such as generation trip, load rejection and line opening, have been observed and discussed. Further uniform system models are developed to investigate the detailed behaviors of wave propagation. Visualization tool is developed to help to view frequency behavior simulations. Frequency replay from simulation data provides some insights of how these frequency electromechanical waves propagate when major events occur. The speeds of electromechanical wave propagation in different areas of the U.S. systems, as well as the uniform models were estimated and their characteristics were discussed. Theoretical derivation between the generator's mechanical powers and bus frequencies is provided and the delayed frequency response is illustrated. Field-measured frequency data from FNET are also examined. Outlier removal and wavelet-based denoising signal processing techniques are applied to filter out spikes and noises from measured frequency data. System's frequency statistics of three major U.S. power grids are investigated. Comparison between the data from phasor measurement unit (PMU) at a high voltage substation and from FNET taken from 110 V outlets at distribution level illustrates the close tracking between the two. Several generator trip events in the Eastern Interconnection System and the Western Electricity Coordinating Council system are recorded and the frequency patterns are analyzed. Our trigger program can detect noticeable frequency drop or rise and sample results are shown in a 13 month period. In addition to transient states' observation, the quasi-steady-state, such as oscillations, can also be observed by FNET. Several potential applications of FNET in the areas of monitoring & analysis, system control, model validation, and others are discussed. Some applications of FNET are still beyond our imagination. / Ph. D.
4

WAMS-based Intelligent Load Shedding Scheme for Preventing Cascading Blackouts

Veda, Santosh Sambamoorthy 07 January 2013 (has links)
Severe disturbances in a large electrical interconnection cause a large mismatch in generation and load in the network, leading to frequency instability. If the mismatch is not rectified quickly, the system may disintegrate into multiple islands. Though the Automatic Generation Controls (AGC) perform well in correcting frequency deviation over a period of minutes, they are ineffective during a rolling blackout. While traditional Under Frequency Load Shedding Schemes (UFLS) perform quick control actions to arrest frequency decline in an islanded network, they are not designed to prevent unplanned islanding. The proposed Intelligent Load Shedding algorithm combines the effectiveness of AGC Scheme by observing tie line flows and the speed of operation of the UFLS Scheme by shedding loads intelligently, to preserve system integrity in the event of an evolving cascading failure. The proposed scheme detects and estimates the size of an event by monitoring the tie lines of a control area using Wide Area Measurement Systems (WAMS) and initiates load shedding by removing loads whose locations are optimally determined by a sensitivity analysis. The amount and location of the load shedding depends on the location and size of the initiating event, making the proposed algorithm adaptive and selective. Case Studies have been presented to show that control actions of the proposed scheme can directly mitigate a cascading blackout. / Ph. D.
5

Communication Infrastructure for the Smart Grid: A Co-Simulation Based Study on Techniques to Improve the Power Transmission System Functions with Efficient Data Networks

Lin, Hua 24 October 2012 (has links)
The vision of the smart grid is predicated upon pervasive use of modern digital communication techniques in today's power system. As wide area measurements and control techniques are being developed and deployed for a more resilient power system, the role of communication networks is becoming prominent. Advanced communication infrastructure provides much wider system observability and enables globally optimal control schemes. Wide area measurement and monitoring with Phasor Measurement Units (PMUs) or Intelligent Electronic Devices (IED) is a growing trend in this context. However, the large amount of data collected by PMUs or IEDs needs to be transferred over the data network to control centers where real-time state estimation, protection, and control decisions are made. The volume and frequency of such data transfers, and real-time delivery requirements mandate that sufficient bandwidth and proper delay characteristics must be ensured for the correct operations. Power system dynamics get influenced by the underlying communication infrastructure. Therefore, extensive integration of power system and communication infrastructure mandates that the two systems be studied as a single distributed cyber-physical system. This dissertation proposes a global event-driven co-simulation framework, which is termed as GECO, for interconnected power system and communication network. GECO can be used as a design pattern for hybrid system simulation with continuous/discrete sub-components. An implementation of GECO is achieved by integrating two software packages: PSLF and NS2 into the framework. Besides, this dissertation proposes and studies a set of power system applications which can be only properly evaluated on a co-simulation framework like GECO, namely communication-based distance relay protection, all-PMU state estimation and PMU-based out-of-step protection. All of them take advantage of interplays between the power grid and the communication infrastructure. The GECO experiments described in this dissertation not only show the efficacy of the GECO framework, but also provide experience on how to go about using GECO in smart grid planning activities. / Ph. D.
6

Power Systems Frequency Dynamic Monitoring System Design and Applications

Zhong, Zhian 25 August 2005 (has links)
Recent large-scale blackouts revealed that power systems around the world are far from the stability and reliability requirement as they suppose to be. The post-event analysis clarifies that one major reason of the interconnection blackout is lack of wide area information. Frequency dynamics is one of the most important parameters of an electrical power system. In order to understand power system dynamics effectively, accurately measured wide-area frequency is needed. The idea of building an Internet based real-time GPS synchronized wide area Frequency Monitoring Network (FNET) was proposed to provide the imperative dynamic information for the large-scale power grids and the implementation of FNET has made the synchronized observations of the entire US power network possible for the first time. The FNET system consists of Frequency Disturbance Recorders (FDR), which work as the sensor devices to measure the real-time frequency at 110V single-phase power outlets, and an Information Management System (IMS) to work as a central server to process the frequency data. The device comparison between FDR and commercial PMU (Phasor Measurement Unit) demonstrate the advantage of FNET. The web visualization tools make the frequency data available for the authorized users to browse through Internet. The research work addresses some preliminary observations and analyses with the field-measured frequency information from FNET. The original algorithms based on the frequency response characteristic are designed to process event detection, localization and unbalanced power estimation during frequency disturbances. The analysis of historical cases illustrate that these algorithms can be employed in real-time level to provide early alarm of abnormal frequency change to the system operator. The further application is to develop an adaptive under frequency load shedding scheme with the processed information feed in to prevent further frequency decline in power systems after disturbances causing dangerous imbalance between the load and generation. / Ph. D.
7

High Accuracy Real-time GPS Synchronized Frequency Measurement Device for Wide-area Power Grid Monitoring

Xu, Chunchun 04 May 2006 (has links)
Frequency dynamics is one of the most important signals of a power system, and it is an indicator of imbalance between generation and load in the system. The Internet-based real-time GPS-synchronized wide-area Frequency Monitoring Network (FNET) was proposed to provide imperative frequency dynamics information for a variety of system-wide monitoring, analysis and control applications. The implementation of FNET has for the first time made the synchronized observation of the entire U.S. power network possible with very little cost. The FNET is comprised of many Frequency Disturbance Recorders (FDR) geographically dispersed throughout the U.S. and an Information Management System (IMS), currently located at Virginia Tech. The FDR works as a sensor, which performs local measurements and transmits calculations of frequency, voltage magnitude and voltage angle to the remote servers via the Internet. Compared with its commercial counterpart Phasor Measurement Unit (PMU), FDR provides less expensive version for networked high-resolution real-time synchronized. The improved single phase algorithm in the FDRs made it possible to measure at 110V level which is much more challenging than PMUs due to the noise involved at this level. This research work presents the challenges and issues of both software and hardware design for the novel measurement device FDR, which is one of the devices with the highest dynamic precision for power system frequency measurement. The DFT-based Phasor Angle Analysis algorithm has been improved to make sure the high-resolution measuring FDRs are installed at residential voltage outlets, instead of substation high-voltage inputs. An embedded 12-channel timing GPS receiver has been integrated to provide an accurate timing synchronization signal, UTC time stamp, and unit location. This research work also addresses the harmonics, voltage swing and other noise components' impacts on the measurement results, and the optimized design of filters and a coherent sampling scheme to reduce or eliminate those impacts. The verification test results show that the frequency measurement accuracy of the FDR is within +/-0.0005Hz, and the time synchronization error is within +/-500ns with suitable GPS antenna installation. The preliminary research results show the measurement accuracy and real-time performance of the FDR are satisfactory for a variety of FNET applications, such as disturbance identification and event location triangulation. / Ph. D.