• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 11
  • 1
  • Tagged with
  • 15
  • 15
  • 6
  • 6
  • 5
  • 4
  • 4
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Measuring the Construction Performance in Saudi Arabia and Proposing New Procurement Model Based on BV PIPS (A University Case Study)

January 2016 (has links)
abstract: Saudi Arabia has been facing issues with completing construction projects on time and on budget. It has been documented that 70% of public construction projects are delayed. Studies have identified the low-bid delivery method as an important factor in causing such delays. The procurement system (low-bid) ignores contractors’ performance, and that is reflected in projects’ performance. A case study was performed, at a University campus in northern Saudi Arabia, identifying the major causes of project delays and cost overruns. The University was experiencing delays from 50% to 150%. Also, the actual project costs for four projects were examined and found that all four projects’ costs were higher than the original bid. The delay and cost overruns factors were gathered from the University engineers. A literature research identified one construction management method, best value performance information procurement system (BV PIPS), has documented multiple times its ability to improve project performance. In a comparison using the result of a case study and the results of (BV PIPS), Saudi Arabia’s delivery system was identified as a potential cause of project performance issues. The current procurement system was analyzed and modified to adapt with the (BV PIPS). The proposed procurement system using BV PIPS, which can be implemented in Saudi Arabia, was created with owner side. A large survey was conducted of 761 classified contractors and 43 universities’ representatives who rated causes of delay factors and cost overruns. The delay factors were then compared to delay factors experienced on Saudi construction projects, identified by performing a literature research. The comparison identified 14 important causes of delays. Moreover, the survey showed that classified contractors and universities’ representatives unsatisfied with low-bid, and they agreed with BV PIPS which selecting vendors based on performance with price. The proposed model required a submitted level of experience (LE), risk assessment (RA), and value added (VA). Besides, project managers of vendors should be interviewed during the clarification phase. In addition, venders should submit the project’s scope, technical schedule, milestone schedule, and risk management plan. In the execution phase, vendors should submit a weekly risk report (WRR) and director’s report (DR). / Dissertation/Thesis / Doctoral Dissertation Construction 2016
12

Shifting from Management to Leadership: A Procurement Model Adaptation to Project Management

January 2017 (has links)
abstract: The construction industry is performing poorly regarding project management and service delivery. On average, global projects are over-budget, delayed, and met with unsatisfactory results according to buyers. To mitigate poor performance, the project management career path has been heavily researched and continually developed over the last century. Despite the published advances in project management approaches and tools, project performance continues to suffer. This research seeks to conduct an exploratory analysis of current project management and other approaches and determine how they affect project performance. Through a detailed literature search, the researcher identified a procurement model that is more heavily documented as high performing than all other approaches. The researcher proposed that this model may be a solution to assist project managers with the delivery of high performing services. The model is called the Best Value Approach (BVA). The BVA focuses on leadership, non-technical communication, quality assurance, and transparent project execution. To test the effectiveness of its practices, the researcher modified and adapted the BVA into a project management approach and tested it on a large-scale government project. During the case study test, the researcher observed that there were two primary project management roles in the supply chain; the buyer’s and vendor’s project managers. The case study resulted in the large government organization receiving more work and increased their satisfaction of the work received by 22 percent from the previous year. To further test the project management adapted BVA, the researcher conducted a classroom case-study in which students learned and implemented the BVA practices on real-time, small-scale industry projects. Results include cost savings of $100,000 for 10 companies over 24 projects, cost avoidance of over $4.5M, and a 9.8/10 customer satisfaction [in terms of the companies’ satisfaction with the deliverables produced on each project]. These results suggest that the BVA practices may effectively improve the performance of project delivery, and may be a viable new project management approach to train future project managers. Out of the two project manager roles, it is proposed that the buyer’s project manager may receive the most benefit. Additional research is needed on the other approaches to compare quantitative project performance, and run repeated testing on the potential new project management approach. / Dissertation/Thesis / Doctoral Dissertation Construction Management 2017
13

The Effects of a Quality Grading System on the Development of Consumer Driven Best Practice Value Chains: The Example of Meat Standards Australia

Bott, Gregory 11 1900 (has links)
This research project analyzes the beef grading system in Australia. Firstly, the Meat Standards Australia (MSA) grading system as a potential value-creating and value chain-coordinating mechanism is investigated. In-depth interviews with value chain stakeholders and industry experts suggest that the implementation of the MSA grading system has had a catalytic effect of moving value chains toward a greater level of coordination. The concept of best value supply chains is also used as a benchmark in determining MSAs effect on value chain performance. Secondly, using a survey of Australian consumers, findings suggest that the MSA certification is perceived as a trustworthy signal for tenderness and quality, reducing information asymmetry at the consumer level. This thesis then addresses the questions of whether or not it is necessary to use a grading system in consumer marketing (e.g. quality label) in order to be successful in terms of adding value to the industry. / Agricultural and Resource Economics
14

The Effects of a Quality Grading System on the Development of Consumer Driven Best Practice Value Chains: The Example of Meat Standards Australia

Bott, Gregory Unknown Date
No description available.
15

Alternative to low bid selection in Air Force reserve military construction: approach to best value procurement

Garner, Birtice A. 01 July 2009 (has links)
Best value is becoming one of the most commonly used procurement methods in the facility construction industry. The Federal Government and the Air Force Reserve predominant project delivery approach has been via the low-bid award. This process has not been successful, documented by large numbers of construction modifications, as well as project cost and schedule growth over the past sixteen years. Recently, federal procurement agencies have attempted to move toward construction awards based upon best value principles relative to performance and price. The United States Army Corps of Engineers best value procurement vehicle known as Military Transformation fails to deliver true best value. This pseudo best value delivery process: (1) fails to objectively rate and apply contractor past performance; (2) lacks the means to monetarily quantify contractor proposal risks; and (3) provides no means of transferring control and responsibility for risks and risk minimization to the contractor. Only a true best value project delivery system can provide the urgently required increased efficiency necessary for Air Force Reserve Command to remain a dependable military institution capable of erecting facilities contributory to our nation's defense by perpetually adding value to the project delivery process.

Page generated in 0.0604 seconds