1 |
Highway bridge construction production rates for time estimationHuh, Youngki, 1969- 02 August 2011 (has links)
Not available / text
|
2 |
A fuzzy reasoning cost estimation model of sustainable building refurbishment solutions for residential buildings in Hong KongShi, Xin, 施歆 January 2014 (has links)
The global climate has been affected adversely due to the emissions of large amount of greenhouse gases (GHGs) and there is an urgent need for emissions reduction. Carbon dioxide is a major greenhouse gas and the reduction of its emissions is indispensable to the achievement of sustainable development. The building sector is a major source of carbon dioxide emissions and one way to reduce the emissions is uplifting the energy efficiency of existing buildings by conducting sustainable building refurbishment. As cost would affect the decisions on sustainable building refurbishment strategies, it is necessary to examine the cost of various sustainable refurbishment solutions for existing buildings. Unfortunately, most of the previous studies focused on the technical side with little effort being directed to cost side. Therefore, cost analysis of sustainable building refurbishment solutions should be conducted to fill the research gap.
The aim of the research is to develop a cost estimation model to facilitate decision makers to evaluate the cost of sustainable building refurbishment solutions for residential buildings in Hong Kong by considering various factors affecting the cost. The major research methods include literature review, interview and questionnaire survey. Through literature review, the current practice of sustainable building refurbishment is investigated. A variety of refurbishment solutions including improvement on building envelope, renovation of building services system and the use of renewable energy are reviewed. Cost evaluation techniques commonly used in the construction industry including qualitative techniques, quantitative techniques and intelligent methods are also identified and discussed. Due to the limitations of cost data and previous experience, it is suggested that fuzzy logic theory be adopted to develop the cost estimation model.
To facilitate the development of the model, the factors affecting the cost of sustainable building refurbishment solutions are examined through literature review and interview. It is found that market price, complexity, efficiency, economy of scale and disturbance are the dominant factors affecting the fluctuation of cost. Finally, a fuzzy reasoning cost estimation model of sustainable building refurbishment solutions is developed. The model is built based on fuzzy reasoning system. Users can input the information of the project and the model is able to evaluate the cost fluctuation based on the information provided by the users. The model is then validated.
The cost estimation model developed in this research provides a new way for the construction industry practitioners to estimate the cost of sustainable building refurbishment projects effectively and efficiently. / published_or_final_version / Civil Engineering / Master / Master of Philosophy
|
3 |
Análise comparativa de custos de alternativas tecnológicas para construção de habitações popularesAngela Cristina Alves Guimarães de Souza 00 December 2009 (has links)
O déficit habitacional brasileiro atual é estimado em cerca 7,2 milhões de moradias que corresponde a 12,8% do total de domicílios do país, de acordo com dados da última Pesquisa Nacional de Amostragem de Domicílios (PNAD) realizada pelo IBGE em 2007. Não obstante a situação do déficit habitacional apresentada seja preocupante, os dados da última PNAD mostram avanços, principalmente na linha da redução absoluta do déficit. Considerando uma comparação em termos
relativos, um bom indicativo da redução deste déficit se obtém quando são cotejados os anos de 2001 e 2007 onde foi constatado que o déficit recuou de 15,7% para 12,8% do total de domicílios no país. A manutenção desta trajetória de queda é um desafio que precisa ser vencido e a construção
civil tem um papel importante a desempenhar neste processo. Este papel tem impactos no curto prazo, com a geração de empregos, e no longo prazo, contribuindo para a melhoria da qualidade de vida da população. Nesta particular, a discussão sobre processos construtivos que possibilitem a redução gradual do déficit habitacional com estratégias tecnológicas sustentáveis tanto do ponto de vista econômico quanto ambiental tem ganhado importante espaço na discussão técnico-científica no país. O presente trabalho promoveu o estudo comparativo de três alternativas tecnológicas para a
construção de habitações de interesse social, a saber: Sistema Construtivo em Alvenaria Estrutural (Blocos cerâmicos e de concreto), Sistema Construtivo com Paredes de Gesso e Sistema Construtivo com Painéis Monolíticos de Poliestireno Expandido (EPS). Foi eleita uma geometria típica de edificação com 42,3 m2 que é usualmente utilizada em programas governamentais de redução do déficit habitacional, sobre a qual foram identificados os custos de construção específicos
de cada sistema estudado. Foram examinadas as características de cada um dos sistemas, ressaltando suas potencialidades, vantagens e desvantagens e foram também apropriados os custos de construção com levantamento detalhado dos insumos necessários à execução dos mesmos. Os resultados obtidos apontam que, do ponto de vista do custo de implantação, o Sistema Construtivo em Alvenaria de Blocos Cerâmicos apresentou os melhores resultados / The current Brazilian housings deficit is about 7,2 million of housings which is equivalent to 12,8% of the total of domiciles of the country, in accordance with the last National Research of Sampling of Domiciles (PNAD) carried through by the IBGE in 2008. Although Brazilian housing deficit should be considered an important problem to deal with, data from last PNAD indicates advances, mainly in the direction of the absolute reduction of the deficit. If one considers a comparison in relative bases, a good indicator of the reduction of this deficit can be obtained analyzing data from 2001 and 2007 years, where it was verified a fall trend from 15,7% for 12,8% of the total of domiciles in the country. To keep this fall trajectory means a difficult challenge that must be overcome and building industry plays an important role in this process. Its action provides short
term impacts, with the generation of several jobs, and long term impacts, contributing to improve quality of life of the people. In this context, the discussion about building processes that can be used to obtain gradual reduction of the housings deficit associated with economical and environmental sustainable strategies has become an important and attractive subject to scientific studies in the country. The present work performed a comparative study of three technological alternatives for building social interest houses (low cost house), namely: Building system using structural masonry walls with concrete or ceramic units, Building system with gypsum walls and Building System with expanded polystyrene panel walls. An usual geometry, of the building with 42,3 m2 in area was
chose because it represents the typology often used in government programs to reduce housings deficit in Brazil. Using this archetype buildings cost were identified and analyzed for each one of the building systems studied. The features of each system were examined, standing out its
potentialities, advantages and disadvantages and a detailed budget (quantities and prices) was elaborated. Obtained results showed that from the point of view of building costs alone the Building system made with structural ceramic units presented lowest costs
|
4 |
The Establishment of Helicopter Subsystem Design-to-Cost Estimates by Use of Parametric Cost Estimating ModelsGilliland, Johnny J. 08 1900 (has links)
The purpose of this research was to develop parametric Design-to-Cost models for selected major subsystems of certain helicopters. This was accomplished by analyzing the relationships between historical production costs and certain design parameters which are available during the preliminary design phase of the life cycle. Several potential contributions are identified in the areas of academia, government, and industry. Application of the cost models will provide estimates beneficial to the government and DoD by allowing derivation of realistic Design-to-Cost estimates. In addition, companies in the helicopter industry will benefit by using the models for two key purposes: (1) optimizing helicopter design through cost-effective tradeoffs, and (2) justifying a proposal estimate.
|
5 |
MODELAGEM DE CRONOGRAMA DE PROJETO PELA FERRAMENTA DSM COM APOIO AO GERENCIAMENTO E TOMADA DE DECISÕES PELA SIMULAÇÃO DE MONTE CARLOCenteno, Hugo Alexandre do Carmo 04 April 2018 (has links)
Submitted by admin tede (tede@pucgoias.edu.br) on 2018-05-14T19:00:50Z
No. of bitstreams: 1
HUGO ALEXANDRE DO CARMO CENTENO.pdf: 1058068 bytes, checksum: 733a3144c0c1d4e70087e3a321855b0b (MD5) / Made available in DSpace on 2018-05-14T19:00:50Z (GMT). No. of bitstreams: 1
HUGO ALEXANDRE DO CARMO CENTENO.pdf: 1058068 bytes, checksum: 733a3144c0c1d4e70087e3a321855b0b (MD5)
Previous issue date: 2018-04-04 / Delays in construction projects are a recurrent fact in several countries and regions for
the most varied types of works. These delays, in addition to negatively impacting the
image of companies contracted in the provision of construction services, cause several
financial losses to interested parties: contractor and hired. Several researches that address
the factors that lead to delays in the work schedule indicate the variation in the duration
of the activities and, or the lack of an inadequate estimate for the duration of the activities,
among the ten major delay factors in the projects. They contribute to the inadequate
estimation of production of the activities, the lack of knowledge of the complexity of the
activities, and also the lack or insufficiency of historical data that allow a safe estimate of
the duration of the activities. Thus, this study aims to describe the behavior of variability
in the duration of activities in an environment with little activity productivity data. The
productivity data analyzed were taken from three similar construction projects carried out
by the same company and which were provided as case studies of this work. For the
analysis of the variability and description of the behavior of the activities, after the data
collection of productivity of the project activities, the non-parametric Bootstrap data
resampling associated with Monte Carlo Simulation (MCS) was used as techniques.
Later, in order to verify the reliability of the results of variation in the duration of the
activities, the schedule of the case studies was modeled using the Critical Path Method
(CPM) and the Dependency Structure Matrix (DSM); and submitted to MCS. The
simulated results of the total duration of the projects were adequate for the actual
completion period of the projects studied, leading to the conclusion that the results of
variation in the duration of the activities obtained by the cited technique are reliable. / Os atrasos em projetos de construção civil são um fato recorrente em diversos países e
regiões para os mais variados tipos de obras. Esses atrasos, além de impactar
negativamente a imagem das empresas contratadas na prestação de serviços de
construção, acarretam diversos prejuízos financeiros às partes interessadas: contratante e
contratado. Diversas pesquisas que abordam os fatores que acarretam em atrasos no
cronograma de obras elencam a variação na duração das atividades e, ou, a falta de
estimativa inadequada para duração das atividades, dentre os dez maiores fatores de atraso
nos projetos. Contribuem para a inadequada estimativa de produção das atividades o
desconhecimento da complexidade das mesmas e, também, a falta ou insuficiência de
dados históricos que permitam estimar com segurança a duração das atividades. Assim,
este trabalho visa descrever o comportamento de variabilidade na duração das atividades
em um ambiente com poucos dados de produtividade das atividades. Os dados de
produtividade analisados foram tomados de três projetos de construção civil semelhantes
executados pela mesma empresa e que se prestaram como estudos de caso deste trabalho.
Para análise da variabilidade e descrição do comportamento das atividades, após a coleta
de dados de produtividade das atividades dos projetos, foram utilizadas como técnicas a
reamostragem Bootstrap não paramétrica dos dados associada a Simulação de Monte
Carlo (SMC). Posteriormente, para verificar a confiabilidade dos resultados de variação
na duração das atividades, o cronograma dos estudos de caso foi modelado utilizando o
Método do Caminho Crítico (CPM) e a Matriz de Estrutura de Dependência (DSM); e
submetido a SMC. Os resultados simulados de duração total dos projetos mostraram-se
adequados ao prazo real de conclusão dos projetos estudados, conduzindo à conclusão de
que os resultados de variação na duração das atividades, obtidos pela técnica citada, são
confiáveis.
|
6 |
Análise comparativa de custos de alternativas tecnológicas para construção de habitações popularesSouza, Angela Cristina Alves Guimarães de 01 December 2009 (has links)
Submitted by Biblioteca Central (biblioteca@unicap.br) on 2017-10-16T17:59:58Z
No. of bitstreams: 1
dissertacao_angela_cristina_alves_guimaraes_souza.pdf: 8756342 bytes, checksum: ae03a7dd2cc8df28c80c13abd75170af (MD5) / Made available in DSpace on 2017-10-16T17:59:58Z (GMT). No. of bitstreams: 1
dissertacao_angela_cristina_alves_guimaraes_souza.pdf: 8756342 bytes, checksum: ae03a7dd2cc8df28c80c13abd75170af (MD5)
Previous issue date: 2009-12-01 / The current Brazilian housings deficit is about 7,2 million of housings which is equivalent to 12,8% of the total of domiciles of the country, in accordance with the last National Research of Sampling of Domiciles (PNAD) carried through by the IBGE in 2008. Although Brazilian housing deficit should be considered an important problem to deal with, data from last PNAD indicates advances, mainly in the direction of the absolute reduction of the deficit. If one considers a comparison in relative bases, a good indicator of the reduction of this deficit can be obtained analyzing data from 2001 and 2007 years, where it was verified a fall trend from 15,7% for 12,8% of the total of domiciles in the country. To keep this fall trajectory means a difficult challenge that must be overcome and building industry plays an important role in this process. Its action provides short term impacts, with the generation of several jobs, and long term impacts, contributing to improve quality of life of the people. In this context, the discussion about building processes that can be used to obtain gradual reduction of the housings deficit associated with economical and environmental sustainable strategies has become an important and attractive subject to scientific studies in the country. The present work performed a comparative study of three technological alternatives for building social interest houses (low cost house), namely: Building system using structural masonry walls with concrete or ceramic units, Building system with gypsum walls and Building System with expanded polystyrene panel walls. An usual geometry, of the building with 42,3 m2 in area was chose because it represents the typology often used in government programs to reduce housings deficit in Brazil. Using this archetype buildings cost were identified and analyzed for each one of the building systems studied. The features of each system were examined, standing out its potentialities, advantages and disadvantages and a detailed budget (quantities and prices) was elaborated. Obtained results showed that from the point of view of building costs alone the Building system made with structural ceramic units presented lowest costs. / O déficit habitacional brasileiro atual é estimado em cerca 7,2 milhões de moradias que corresponde a 12,8% do total de domicílios do país, de acordo com dados da última Pesquisa Nacional de Amostragem de Domicílios (PNAD) realizada pelo IBGE em 2007. Não obstante a situação do déficit habitacional apresentada seja preocupante, os dados da última PNAD mostram avanços, principalmente na linha da redução absoluta do déficit. Considerando uma comparação em termos relativos, um bom indicativo da redução deste déficit se obtém quando são cotejados os anos de 2001 e 2007 onde foi constatado que o déficit recuou de 15,7% para 12,8% do total de domicílios no país. A manutenção desta trajetória de queda é um desafio que precisa ser vencido e a construção civil tem um papel importante a desempenhar neste processo. Este papel tem impactos no curto prazo, com a geração de empregos, e no longo prazo, contribuindo para a melhoria da qualidade de vida da população. Nesta particular, a discussão sobre processos construtivos que possibilitem a redução gradual do déficit habitacional com estratégias tecnológicas sustentáveis tanto do ponto de vista econômico quanto ambiental tem ganhado importante espaço na discussão técnico-científica no país. O presente trabalho promoveu o estudo comparativo de três alternativas tecnológicas para a construção de habitações de interesse social, a saber: Sistema Construtivo em Alvenaria Estrutural (Blocos cerâmicos e de concreto), Sistema Construtivo com Paredes de Gesso e Sistema Construtivo com Painéis Monolíticos de Poliestireno Expandido (EPS). Foi eleita uma geometria típica de edificação com 42,3 m2 que é usualmente utilizada em programas governamentais de redução do déficit habitacional, sobre a qual foram identificados os custos de construção específicos de cada sistema estudado. Foram examinadas as características de cada um dos sistemas, ressaltando suas potencialidades, vantagens e desvantagens e foram também apropriados os custos de construção com levantamento detalhado dos insumos necessários à execução dos mesmos. Os resultados obtidos apontam que, do ponto de vista do custo de implantação, o Sistema Construtivo em Alvenaria de Blocos Cerâmicos apresentou os melhores resultados.
|
7 |
Guidelines for target costing introduction in the real estate products development proces = Diretrizes para introdução do custeio-meta no processo de desenvolvimento de produtos imobiliários / Diretrizes para introdução do custeio-meta no processo de desenvolvimento de produtos imobiliáriosMelo, Reymard Savio Sampaio de, 1983- 06 December 2015 (has links)
Orientador: Ariovaldo Denis Granja / Tese (doutorado) - Universidade Estadual de Campinas, Faculdade de Engenharia Civil, Arquitetura e Urbanismo / Made available in DSpace on 2018-08-27T16:54:00Z (GMT). No. of bitstreams: 1
Melo_ReymardSavioSampaiode_D.pdf: 3570435 bytes, checksum: 6810689a549becc35c07922f4a0849cb (MD5)
Previous issue date: 2015 / Resumo: Os problemas relacionados com a prática tradicional de redução de custos na construção civil e a necessidade de aumentar a competitividade de empresas do setor de real estate nortearam essa pesquisa. Neste sentido, o custeio-meta é uma abordagem promissora para melhorar a competitividade de empresas garantindo que os produtos lançados no mercado não comprometam a margem de lucro da empresa nem a entrega de valor para os clientes. No entanto, há uma escassez de pesquisas visando apoiar as organizações do setor imobiliário que desejam implementar de forma gradual os princípios do custeio-meta no processo de desenvolvimento de produtos imobiliários destinados à venda. Diante disso, o principal objetivo da pesquisa foi propor diretrizes para introdução do custeio-meta no processo de desenvolvimento de produtos imobiliários destinados à venda. A design science foi o método de pesquisa utilizado. A pesquisa foi dividida em três fases: incubação da solução, refinamento da solução e explanação. As diretrizes propostas estão relacionadas as três principais seções do processo do custeio-meta: custeio orientado ao mercado, custeio-meta no nível de produto e custeio-meta no nível de componente. / Abstract: The problems associated with the traditional practice of reducing costs in construction and the need to increase business competitiveness in the real estate sector guided this research. In this sense, the target costing is a promising approach to improving the competitiveness of companies by ensuring that products launched on the market do not jeopardize the company's profit margin or the value delivery to customers. However, there is little research to support the real estate industry organizations wishing to implement gradually the target costing principles in real estate product development process. Thus, the main objective of the research was to propose guidelines for introduction of target costing in the real estate products development process. Design science was the research method applied. The research was divided into three phases: solution incubation, solution refinement and explanation. The proposed guidelines are related to the three main sections of target costing process: market-driven costing, product-level target costing and component-level target costing / Doutorado / Doutor em Engenharia Civil
|
8 |
Aplicação do custeio-meta no processo de projeto em habitação de interesse social / Target costing application in the design process of social housingYokota, Alessandra Akemi, 1988- 27 August 2018 (has links)
Orientador: Ariovaldo Denis Granja / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Civil, Arquitetura e Urbanismo / Made available in DSpace on 2018-08-27T20:19:50Z (GMT). No. of bitstreams: 1
Yokota_AlessandraAkemi_M.pdf: 5943613 bytes, checksum: 29b2af76a45e062a4fc32ae5d1fe42c1 (MD5)
Previous issue date: 2015 / Resumo: Na abordagem do Custeio-Meta (CM), o custo é um parâmetro de entrada que norteia o processo de projeto, salvaguardando-se os requisitos de qualidade e o desempenho de suas funções na percepção do cliente ou usuário final para o alcance de um produto competitivo e inovador. A pesquisa tem como objetivo aplicar o CM no processo de projeto de uma unidade de Habitação de Interesse Social (HIS) em tecnologia Wood Frame, levando em consideração o contexto do Programa Governamental "Minha Casa, Minha Vida". Fundamentada no método da Design Science ou Pesquisa Construtiva, a pesquisa visa aplicar o CM neste processo, para posteriormente identificar as possíveis contribuições teóricas a partir dos resultados obtidos. A pesquisa utiliza técnicas e ferramentas características do CM para a estimativa de custo e tomada de decisão com foco no valor a partir da percepção do usuário final. Também busca identificar as dificuldades e oportunidades para a aplicação do CM neste contexto. Os dados utilizados como parâmetro de custo da Unidade Habitacional foram cedidos por uma empresa especializada na tecnologia Wood Frame. O processo de projeto foi desenvolvido por um grupo de pesquisadores, envolvendo docentes e discentes de diversas especialidades nas áreas da Arquitetura e Engenharia Civil. Como principal resultado, ao final da pesquisa, será gerado como artefato uma instância atual da aplicação do CM para o contexto proposto, visando à melhoria no atendimento das necessidades e requisitos para HIS do ponto de vista do usuário final, não se perdendo de vista os necessários controles de custo do produto. A orientação prescritiva desta pesquisa oferecerá novidade em relação aos trabalhos já disponíveis, à medida que apresentará resultados provenientes da aplicação prática do CM no contexto analisado e novas contribuições teóricas decorrentes da análise deste processo / Abstract: In the Target Costing (TC) approach, cost is regarded as an initial input to guide the Design Process considering cost, quality requirements and product performance from the end-users and client¿s perspective in order to improve the product through competitiveness and innovation. The main purpose of this study is to apply Target Costing during the design process for low-incoming houses in Brazil by using Wood Frame system. In the Brazilian context, the current low-incoming houses are supported by the Governmental Program called "My House, My Life" (MHML). In this research, the MHML Program will be discussed to deliver Wood Frame houses under the TC approach. Based on the Design Research Approach or Constructive Research, the study seeks to apply the TC to further identify theoretical contributions from the results obtained from its application. Supporting techniques and tools from Value Methodology were properly used to deliver the TC application assisting the cost estimation and decision making. It also aims to identify the difficulties and opportunities for the TC application in this context. The cost data was provided by a Brazilian company specialized in Wood Frame to estimate the initial cost of the product. The design process was developed by a research team including architects, civil engineers, contractors and suppliers. As outcome, the proposed application presents an instantiation for the TC application. Furthermore, the results indicates some directions for possible improvements from the end-users¿ wants and needs in order to fulfil such requirements due to cost controlling. The prescriptive study offers novelty for the TC studies in the construction sector and identifies some gaps related to the Target Costing in Social Housing with the aim to accomplish future studies / Mestrado / Arquitetura e Construção / Mestra em Engenharia Civil
|