• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 192
  • 9
  • 9
  • 9
  • 9
  • 5
  • 4
  • 4
  • 2
  • 2
  • 2
  • Tagged with
  • 205
  • 205
  • 205
  • 92
  • 80
  • 79
  • 61
  • 40
  • 32
  • 30
  • 29
  • 28
  • 27
  • 26
  • 21
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
181

Analise de observabilidade e processamento de erros grosseiros conformativos utilizando a metaheuristica busca tabu na estimação de estado generalizada

Asada, Eduardo Nobuhiro 29 June 2004 (has links)
Orientadores: Ariovaldo Verandio Garcia, Alcir Jose Monticelli / Tese (doutorado) - Universidade Estadual de Campinas, Faculdade de Engenharia Eletrica e de Computação / Made available in DSpace on 2018-08-04T00:08:40Z (GMT). No. of bitstreams: 1 Asada_EduardoNobuhiro_D.pdf: 8314555 bytes, checksum: 1d07bd4292835815d0cec8ae2b521606 (MD5) Previous issue date: 2004 / Resumo: Este trabalho apresenta estudos sobre a modelagem em tempo-real de sistemas de potência através da estimação de estado generalizada. As principais funções da estimação analisadas foram: processador topológico, observador, estimador de estado e análise de erros grosseiros. Os dispositivos de chaveamento (chaves e disjuntores) são representados através de modelos de impedância nula. A modelagem do sistema na sua forma mais detalhada, através da representação de subestações com todas chaves e disjuntores, permite a verificação de erros de status desses componentes. Portanto, a análise da topologia pode ser realizada simultaneamente à estimação de variáveis de estado convencionais. Chaves e disjuntores, que são elementos de impedância nula, são considerados no modelo generalizado através da adição de variáveis de estado do tipo fluxo e de pseudomedidas adequadas. A interação entre dispositivos de característica discreta e medidas analógicas e a diferença entre os modelos convencional e generalizado são enfatizados em cada função. Dois modelos de estimador são considerados: um baseado no método desacopIado a partir da formação da matriz ganho e o segundo baseado no método Tableau esparso de Hachtel, onde pseudomedidas de injeção nula são consideradas como restrições de igualdade. A análise de erros grosseiros proposta busca tratar um erro reconhecido pela dificuldade na sua detecção: o erro conformativo. As medidas afetadas por esse tipo de erro agem como fossem medidas regulares e seus efeitos atingem medidas sem erro grosseiro. Nesse caso, as metodologias tradicionais quando aplicadas, podem identificar incorretamente as medidas. A identificação de erros conformativos foi formulada através da teoria da decisão e a partir da consideração da confiabilidade das medidas formula-se como um problema combinatório. É sabido que Metaheurísticas são eficientes no tratamento de tais problemas e a Busca Tabu é proposta para identificação e elaboração de hipóteses que melhor expliquem as incoerências encontradas / Abstract: This work presents studies about power system real-time modeling by using generalized state estimation. The analyzed state estimation functions are: topological processing, observability analysis, state estimator and gross errar analysis. All these functions are considered by a generalized approach, where switching components (switches and circuit breakers) are represented by zero impeda_ce models. Consideration of detailed model through explicit representation of substations with all switches and circuit breakers allows topology analysis with estimation of conventional state variables simultaneously. Switches, circuit breakers (zero impedance branches), are represented by the insertion of new flow state variables followed by adequate pseudomeasurements. The interaction among components and measurements of different natures and differences between conventional and generalized models were emphasized for each function. Two state estimator models are considered: the first one is based on decoupled state estimation by using the gain matrix, the second one is based on Hachtel's sparse tableau approach. The proposed gross error analysis. aims to treating an errar that is known by its detection difliculty: the conforming error. Measurements affected by this error act as regular measurements and the negative effects act over good measurements. In this case, conventional identification methods may fail and good measurements are erroneously identified as bad data. The identification of conforming errors are formulated by an approach based on Decision Theory by considering the reliability of each measurement. The resulting problem is a combinatorial problem. It is known that Meta-Heuristics are very suited for combinatorial problems and the Tabu Search approach is proposed for identification and formulation of hypotheses that better explain inconsistencies caused by interacting errors / Doutorado / Doutor em Engenharia Elétrica
182

Analise da estabilidade de tensão e areas criticas da rede eletrica do Estado de São Paulo / Assessment of voltage stability critical areas of São Paulo State transmission network

Silva, Luciano Jose da 20 December 2006 (has links)
Orientador: Luiz Carlos Pereira da Silva / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Eletrica e de Computação / Made available in DSpace on 2018-08-08T01:32:40Z (GMT). No. of bitstreams: 1 Silva_LucianoJoseda_M.pdf: 4123648 bytes, checksum: 8230dacb74058918f80eb46ac227e7d6 (MD5) Previous issue date: 2006 / Resumo: O objetivo desta dissertação é investigar o grau de segurança da rede elétrica do Estado de São Paulo em relação ao risco da ocorrência de colapso de tensão. São considerados no estudo um número significativo de casos base (N-0) e casos com contingências simples (N-1). Métodos baseados no cálculo de curvas PV são utilizados para a avaliação das margens de estabilidade dos diferentes cenários de operação. No entanto, estes métodos não propiciam a identificação de barras ou áreas críticas do sistema do ponto de vista da estabilidade de tensão, as quais representam as melhores opções para a aplicação de medidas de reforço e/ou corretivas contra o problema de instabilidade. A técnica de análise modal é aplicada para a identificação de áreas críticas em relação à estabilidade de tensão, permitindo capturar as regiões da rede elétrica do Estado de São Paulo que requerem maior atenção. Utilizando a metodologia de análise modal foi ainda possível verificar a abrangência das contingências capturadas através do método da curva PV, possibilitando mensurar o impacto de cadacontingência como local, de área ou sistêmico. Os resultados desta pesquisa permitem concluir que a malha principal do Estado é redundante, não havendo a perda sistêmica da estabilidade de tensão para cenários de contingências simples / Abstract: This work investigates the security level of the transmission network of the State of São Paulo with respect to the occurrence of voltage collapse. A number of credible scenarios including base cases (N-0) and single contingency (N-1) cases are considered. PV curve methods are employed for evaluating the voltage stability margin for the selected set of operative scenarios. However, these methods do not provide the identification of critical buses or areas from the perspective of voltage stability, which represent the best options for the application of reinforcement/corrective measures against the instability problem. The modal analysis technique is applied for the identification of critical areas with respect to voltage instability, allowing the selection of the areas of the grid that request special attention. The modal analysis method also provide the means of quantifying the impact area of the contingencies captured through the PV curve method, providing a way of separating a set of credible contingencies into three groups as far as their impact: branch-wide contingencies, area-wide contingencies and system-wide contingencies. The results of this research leads to the conclusion that the main transmission network of the State of São Paulo is redundant, since no cases occurred of systemic loss of voltage stability due to single contingencies / Mestrado / Energia Eletrica / Mestre em Engenharia Elétrica
183

Impactos do desempenho das emendas dos cabos de linhas de transmissão na confiabilidade de redes elétricas / Transmission lines cable splices performance impacts on electrical network reliability

Barbosa, Carlos David Franco, 1956- 18 August 2018 (has links)
Orientadores: Alberto Luiz Francato, Carlos Alberto Mariotoni / Tese (doutorado) - Universidade Estadual de Campinas, Faculdade de Engenharia Civil, Arquitetura e Urbanismo / Made available in DSpace on 2018-08-18T13:32:01Z (GMT). No. of bitstreams: 1 Barbosa_CarlosDavidFranco_D.pdf: 7182306 bytes, checksum: 6a8fd84aba169e2fceffb93e27a4c5b5 (MD5) Previous issue date: 2011 / Resumo: Esta tese tem como objetivo estudar métodos de planejamento da expansão da transmissão de energia elétrica em mercados de eletricidade re-estruturados, tanto em um ambiente tradicional quanto com a adoção de inovações tecnológicas. No trabalho são estudados procedimentos de campo para as linhas de transmissão, considerando economia e confiabilidade, principalmente em emendas a compressão para cabos ACSR (Aluminum Core Steel Reinforced). O trabalho descreve os resultados de pesquisas efetuadas com fabricantes e concessionárias usuárias das emendas a compressão e ainda sugere alguns procedimentos e rotinas de inspeções para melhorar a confiabilidade do sistema. Os resultados dos testes com as emendas, realizados em laboratório, serviram para dar suporte para a analise de falhas, subsidiando a avaliação das causas de falhas mais frequentes no ambiente competitivo. Por fim foram apresentadas tecnologias emergentes com possibilidade de redução da taxa de falhas nos sistemas de transmissão de energia elétrica bem como as recomendações de boas praticas para o setor / Abstract: This thesis has as objective to study electricity transmission expansion planning In re-structured markets, both traditional as well as with technological innovations. In the work are studied transmission lines field procedures considering economy and reliability, mainly ACSR (Aluminum Core Steel Reinforced) compression splices. The work describes compression splices field surveys with suppliers and users concessionaries and also suggest some procedures and inspections routines to improve system reliability. The results of laboratory splice tests helped the failure analysis and frequently failure causes on competitive environment. Finally it is presented emerging technologies with failure reduction possibilities for the electricity transmission systems and good practices recommendations for sector / Doutorado / Recursos Hidricos, Energeticos e Ambientais / Doutor em Engenharia Civil
184

Estabilização de oscilações de potencia de linhas de intercambio atraves de um elo de corrente continua / Stabilization of power lines interchange oscillations through a direct-current link

Paccini, Rodrigo de Oliveira 09 April 2009 (has links)
Orientador: Vivaldo Fernando da Costa / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Eletrica e de Computação / Made available in DSpace on 2018-08-14T11:14:17Z (GMT). No. of bitstreams: 1 Paccini_RodrigodeOliveira_M.pdf: 1988341 bytes, checksum: 7be3a801c003202ec884c8313b60ac5f (MD5) Previous issue date: 2009 / Resumo: Quando um sistema interligado de corrente alternada sofre variações de carga, sua freqüência pode exibir um comportamento oscilatório. Se este mesmo sistema possuir um elo de corrente contínua em paralelo com as linhas de intercâmbio, esse efeito poderá ser atenuado devido à atuação do controlador de corrente do elo. Esta tese apresenta um estudo que avalia a eficiência de um elo de CC para o amortecimento de oscilações de freqüência de intercâmbio sob condições de pequenas perturbações, operando o sistema com Controle Automático de Geração (CAG). Um modelo de injeção de potência utilizado para representar o elo CC é implementado no Modelo de Sensibilidade de Potência (MSP). Uma das vantagens desse modelo é permitir o desacoplamento da rede em duas partes distintas: o balanço ativo e o balanço reativo, em que as duas podem ser tratadas juntas ou separadamente. Com a escolha desse modelo, tornou-se possível implementar toda a rede no formato de diagrama de blocos. Além disso, as barras de carga do sistema são acessíveis através do diagrama de blocos, o que torna possível variar também a característica da carga. Através dessa representação, tornou-se viável a inserção do elo de CC no diagrama de blocos, pois o mesmo foi modelado como uma injeção de potência nas barras terminais nos balanços ativo e reativo, fechando um novo balanço de potência. As análises no domínio do tempo foram realizadas no programa Matlab Simulink®. Também utilizando este software, um controlador de amortecimento de oscilações de potência (POD-Power Oscillation Damping Controller) foi projetado para a modulação da potência do elo de CC. Os resultados obtidos mostram que o elo de CC possui um grande potencial para a manutenção do amortecimento de oscilações de freqüência de modo inter-área, quando equipados com controladores POD. / Abstract: When an interconnected alternate-current power system suffers variations of loads, its frequency can exhibit an oscillatory behavior. If this system possesses a direct-current link in parallel with the inter-tie lines, this effect could be decreased, due to the link current controller action. This work presents a study that evaluates the efficiency of DC link for the damping of interarea frequency oscillations under small disturbances, operating the system with automatic generation control (AGC). A DC power injection model is implemented in the Power Sensitivity Model (PSM). One of the advantages of this model is to allow the detach of the network in two distinct parts: the active and reactive balances, where the two can be dealt together or separately. With the choice of this model, it's possible to implement the complete network in the block diagram format. Moreover, the network load bus are accessible through the block diagram, which this are possible to vary the load characteristic. Through this representation, the insertion of DC link in the block diagram became viable, therefore it was modeled as a power injection in the terminals bus in the active and reactive balances, closing a new power balance. The time domain analysis is carried out the software Matlab Simulink®. Also using this software, a POD controller (Power Oscillation Damping Controller) was designed for the DC power modulation. The results show that DC link comprises a great potential for the maintenance of frequency oscillations damping in interarea mode, when coupled to POD controllers. / Mestrado / Energia Eletrica / Mestre em Engenharia Elétrica
185

Análise crítica de aspectos de modelagem matemática no planejamento da expansão a longo prazo de sistemas de transmissão /

Escobar Zuluaga, Antonio Hernando. January 2008 (has links)
Resumo: O principal objetivo deste estudo é realizar uma análise de aspectos críticos que surgem na modelagem matemática do problema de planejamento da expansão de sistemas de transmissão a longo prazo, assim como o desenvolvimento de ferramentas computacionais para a prova de novos modelos e metodologias que possam contribuir na solução do problema de planejamento de sistemas de transmissão de energia elétrica considerando as condições dos sistemas modernos de energia elétrica. Com esta metodologia, busca-se obter uma rede de transmissão mais eficiente, e com o menor custo possível, que se adapte as novas exigências produzidas pela introdução da desregulação nos sistemas elétricos. Para isto combinam-se três aspectos: rede futura livre de congestionamento, desplanificação e incerteza na geração e na demanda futura, os quais são manipuladas desde a perspectiva mono-objetivo e multiobjetivo. A possibilidade de eliminar completamente o congestionamento na rede de transmissão é analisada através da inclusão no modelo de todos os cenários de geração factíveis futuros, e não somente alguns cenários como outros estudos. Considerar uma operação sem congestionamento para o futuro está associado a grandes custos de investimento. Para atenuar este grande custo uma opção é incluir a possibilidade de desplanificação e a inclusão dos efeitos das incertezas presentes na geração e na demanda futura no problema de planejamento. O problema de planejamento de sistemas de transmissão é um problema de programação não linear inteira mista (PNLIM) quando é usado o modelo DC. Praticamente todos os algoritmos usados para resolver este problema utilizam uma sub-rotina de programação linear (PL) para resolver problemas de PL resultantes do algoritmo de solucão do problema de planejamento, os quais são denominados... (Resumo completo, clicar acesso eletrônico abaixo) / Abstract: The main goal for this study is to do an analysis of the critical issues that appear in the mathematical modeling of the transmission system expansion planning problem, when long term is considered. A methodology was developed and a computational tool, to solve the transmission expansion planning in modern electrical systems. With this methodology more efficient electrical networks are obtained, at low investment costs. This is accomplished taking into account three important aspects: open access, or congestion-free planning, uncertainty in demand and generation, and de-planning. The problem is solved using mono-objective and multi-objective methodologies. For this investigation, congestion-free transmission networks should consider all the future and feasible scenarios of generation, unlike some papers, where only a few scenarios are taken in to account. This feature is associated to high investment costs. Lower costs are often obtained by the inclusion of uncertainty in future demand and future generation. The transmission system expansion planning problem is a no-linear integer-mixed programming problem (PNLIM) when the DC model is used. Practically, all the algorithms used in the solution process, for this problem, use one subroutine of linear programming (PL) for solved the PL problems that result during the solution process, in the denominated operative problem. The solution of the PL's is the part of the problem that requires the biggest computational effort, because during the solution process is necessary to solved thousands or millions of PL's, for high size problems. the PNLIM problem is solved through the combination of a meta-heuristic method and a linear programming method. The meta-heuristic method solves the denominated investment problem and the PL the denominated operational problem. The transmission planning problem considering multiples generation scenarios... (Complete abstract click electronic access below) / Orientador: Rubén Augusto Romero Lázaro / Coorientador: José Roberto Sanches Mantovani / Banca: Carlos Roberto Minussi / Banca: Sérgio Azevedo de Oliveira / Banca: Ariovaldo Verandio Garcia / Banca: Ramón Alfonso Gallego Rendón / Doutor
186

Método da continuação aplicado na análise de contingência de linhas de transmissão /

Matarucco, Rogério Rocha. January 2010 (has links)
Orientador: Dilson Amancio Alves / Banca: Percival Bueno de Araujo / Banca: Carlos Roberto Minussi / Banca: Geraldo Roberto Martins da Costa / Banca: Luiz Carlos Pereira da Silva / Resumo: Este trabalho apresenta dois métodos para a análise estática de contingências em Sistemas Elétricos de Potência utilizando o Método da Continuação. No primeiro método a margem de carregamento pós-contingência é obtida a partir do ponto de máximo carregamento do caso base. A magnitude de tensão de uma barra qualquer é usada como parâmetro na etapa de parametrização do fluxo de carga continuado. O ramo selecionado para avaliação da contingência é parametrizado por um fator de escalonamento que possibilita a remoção gradual do ramo e assegura a convergência nos casos em que o método diverge para a retirada total da linha de transmissão. Em geral, para a maioria das contingências analisadas são necessárias poucas iterações para a determinação do ponto de máximo carregamento pós-contingência. Mostra-se que o método pode ser usado como uma técnica alternativa para a averiguação e até mesmo para a obtenção da lista de contingências críticas fornecida pela função de análise de segurança de sistemas elétricos. No outro método, o qual obtém o ponto de máximo carregamento de pós-contingência a partir do caso base, as variáveis ângulo de fase e magnitude de tensão de uma barra k qualquer, e a perda total de potência ativa, são propostas como parâmetros para a etapa de parametrização do fluxo de carga continuado utilizado na averiguação da lista de contingências críticas fornecida pela função de análise de segurança de sistemas elétricos. Nos casos em que há divergência do fluxo de carga, o método proposto possibilita confirmar se esta ocorre devido à deficiência numérica do método em si ou a inexistência de um ponto de operação factível de pós-contingência. O uso da perda total de potência ativa como parâmetro traz como vantagem a possibilidade da determinação de pontos além do ponto de singularidade sem a necessidade...(Resumo completo, clicar acesso eletrônico abaixo) / Abstract: This work presents two methods for static contingency analysis of electric power systems by using Continuation Methods. In the first the post-contingency loading margin is obtained from the base case maximum loading point. The voltage magnitude of any bus can be used as a parameter in the parameterization step of the proposed continuation power flow. The branch selected for contingency evaluation is parameterized by a scaling factor which allows its the gradual removal and assures the continuation power flow convergence for the cases where the method would diverge for the complete transmission line removal. In general, for most of the analyzed contingencies little iterations are necessary for the determination of the post-contingency maximum loading point. It is shown that the method can be used as an alternative technique to verify and even to obtain the list of critical contingencies supplied by the electric power systems security analysis function. In the other method, which obtains the maximum loading point from the base case, new parameters, namely the voltage magnitudes, phase angles and the total power losses, for evaluating the effects of branch outages. The approach can be used as a verification tool after a list of critical contingencies had been ranked according to their severities by the contingency selection functions. It is then possible to find whether the non-convergence of a power flow is due to a numerical problem or to an infeasible operating situation. The mains advantage of using the total real power losses as a parameter is that it is not necessary to change parameters during the solutions tracing until beyond the simple limit point, where the original Jacobian is singular. The proposed methods facilitate the development and the implementation of continuation methods for contingencies analysis / Doutor
187

Redespacho de reativos como ação corretiva para alívio de sobrecargas em Redes de transmissão /

Hoji, Eduardo Shigueo. January 2011 (has links)
Resumo: Com a necessidade de atender com qualidade a crescente demanda por energia eletrica, com poucas interrupcoes e com níıveis de tensao satisfatorios, e tendo em vista as restricoes ambientais existentes, que dificultam a implantacao de novos recursos aos sistemas de transmissao, como linhas, usinas, subestacoes, etc., as empresas de transmissao tem buscado otimizar os recursos existentes, operando os sistemas com menos folga o que, em alguns casos, pode ocasionar pequenas sobrecargas nas linhas. Nas estruturas atuais de operacao, acoes corretivas usualmente aplicadas ao alıvio dos sistemas de transmissao, como alteracoes nos nıveis de geracao e corte de cargas, fazem parte das atribuicoes do operador do sistema e estao fora do escopo de acao das empresas transmissoras que podem, contudo, alterar as condicoes de operacao de seus dispositivos, como transformadores, compensadores, etc. Neste trabalho e apresentada uma proposta para o alıvio de pequenas sobrecargas em redes de transmissao com base no controle do fluxo reativo das linhas. As acoes corretivas sao determinadas com base na linearizacao dos parametros do sistema em torno de seu ponto de operacao inicial, solucionando-se um problema de programacao linear (PL) cuja funcao objetivo a ser minimizada e o produto entre o custo dos servicos de suporte de reativos prestados pelos dispositivos e o desvio do sistema de seu ponto de operacao inicial. Haja vista a grande quantidade de dispositivos instalados no sistema que podem fornecer servicos de suporte de reativos e que problemas relativos a potencia reativa sao solucionados localmente, e possıvel reduzir a quantidade de dispositivos "candidatos" a realizacao das acoes corretivas e, consequentemente, o numero de variaveis e restricoes no PL a ser solucionado... (Resumo completo, clicar acesso eletrônico abaixo) / Abstract: The growing demand for electric power associated with the environmental limitations imposed to the expansion of power systems hamper the installation of new facilities, such as transmission lines, substations and power plants, and leads the transmission companies to optimize the existing resources. In consequence, transmission systems operate closer to their boundaries and small overloads may surge. In the deregulated operating environment, the standard overload relief procedures, based on generation redispatch and load shedding, are in charge of the system operator and cannot be performed by the transmission companies, which can, otherwise, modify the control parameters of the transmission system devices, such as transformers, shunt compensators, etc. An overload relief procedure based on reactive power control applicable to small disturbances is presented in this paper. The corrective actions are determined by linearizing the system parameters around the initial operating point and solving a linear problem (LP), that minimizes the product between the total cost of the reactive power support provided by the devices and the deviation of the system from its initial operating point. Considering that reactive sources are spread over the whole system and the solution for reactive power problems can be found locally, the set of devices to be applied for the corrective actions can be reduced and, consequently, the number of variables and constraints to be added to the LP problem. To accomplish that, linear sensitivity factors which relate the reactive flow variation in the overloaded line to the devices' control parameters are applied and the "n" most effective devices to mitigate the overloads can be determined. In many market structures reactive power support is a mandatory service and, in some cases, it is not remunerated. However, despite the low cost of production of reactive power... (Complete abstract click electronic access below) / Orientador: Antonio Padilha Feltrin / Coorientador: Javier Contreras Sanz / Banca: Percival Bueno Araújo / Banca: Dilson Amancio Alves / Banca: Eduardo Nobuhiro Asada / Banca: Madson Cortes de Almeida / Doutor
188

Comparação dos custos de geração de energia elétrica entre tecnologias despacháveis e intermitentes no Brasil

Silva, Leonardo Ribeiro Madeira da 05 May 2017 (has links)
Submitted by Leonardo Madeira (leoribmad@hotmail.com) on 2017-05-24T20:49:04Z No. of bitstreams: 1 Dissertação_Leonardo_Madeira v4 - revEdson VF IMPRESSA.pdf: 497221 bytes, checksum: edd8c6618d1bbcf4135abc1f146a6980 (MD5) / Approved for entry into archive by GILSON ROCHA MIRANDA (gilson.miranda@fgv.br) on 2017-05-29T14:55:52Z (GMT) No. of bitstreams: 1 Dissertação_Leonardo_Madeira v4 - revEdson VF IMPRESSA.pdf: 497221 bytes, checksum: edd8c6618d1bbcf4135abc1f146a6980 (MD5) / Made available in DSpace on 2017-05-30T12:49:39Z (GMT). No. of bitstreams: 1 Dissertação_Leonardo_Madeira v4 - revEdson VF IMPRESSA.pdf: 497221 bytes, checksum: edd8c6618d1bbcf4135abc1f146a6980 (MD5) Previous issue date: 2017-05-05 / This study seeks to evaluate the financial differences of power generation between a huge array of technologies, splitting them in Dispatchable and Intermittent. Tacitly accepted all over the world as a financial tool to compare any kind of technology, the Levelized Cost of Energy, LCOE, might originate inappropriate conclusions assumptions once it considers the life cycle of some power generation source with a homogeneous generation profile. Containing a huge framework of data source and a simple metric, the study puts the Joskow (2011) study into Brazil electric sector context. / Este trabalho busca avaliar as diferenças financeiras de geração de energia entre uma grande gama de tecnologias, separando-as em Despacháveis e Intermitentes. Aceito na grande maioria dos países como instrumento de comparação financeira entre fontes de geração, o Custo Nivelado de Energia (LCOE) também é amplamente utilizado no Brasil. Com base em Joskow (2011) e em dados para empreendimentos brasileiros, mostra-se que esta métrica, o LCOE, pode gerar conclusões equivocadas devido ao fato de considerar, em um ciclo de vida dos projetos, um perfil de geração homogêneo, o que não é compatível com as características de despachabilidade das diversas fontes.
189

Metodologia de ensaio de fluência em cabos de transmissão de energia elétrica / Metodologia de ensaio de fluência em cabos de transmissão de energia

Mattos, Carlos Eduardo Lourenço 26 February 2015 (has links)
A construção de linhas de transmissão são obras de grande impacto ambiental e requerem grandes investimentos financeiros. Este projeto de pesquisa, visa por meio de ensaios de laboratório, conceber uma ferramenta sistêmica para o aperfeiçoamento do método de determinação da fluência em cabos condutores de energia e OPGW (Optical Ground Wire), que tem sido utilizada no Brasil durante os últimos 30 anos, e analisar os efeitos na construção das linhas aéreas de transmissão. Visa também, proporcionar ganhos de confiabilidade ao sistema de transmissão de energia elétrica, pois o projeto, a construção, a operação e a manutenção de linhas de transmissão dependem de parâmetros de desempenho mecânico dos condutores. Conclui–se que a metodologia de ensaio proposta proporciona resultados finais mais confiáveis quando comparado com o atual procedimento normatizado, utilizado no Brasil, e sua utilização em projetos de linhas aéreas de transmissão de energia podem reduzir custos de construção, aumentar a ampacidade das linhas já existentes, bem como, diminuir os riscos ao a que pessoas estão sujeitas quando expostas a campos elétricos e eletromagnéticos gerados por linhas de transmissão. / Overhead Transmission Line construction projects have a great environmental impact and require a large financial investment. This research aims, through laboratory tests, to improve the method of determining the creep of power cables and OPGW (Optical Ground Wire) that has been utilized in Brazil for the last thirty years, as well as analyze the effects on the construction of overhead transmission lines. It will provide greater reliability to the overhead transmission line system, since the design, construction, operation and maintenance of transmission lines depend on the mechanical performance of the conductors. In conclusion, the proposed methodology provides more reliable final results compared to the current standardized procedure and its use in overhead transmission line projects could reduce construction costs, increase the ampacity, as well as reduce the risks to which people are subject when exposed to electric and electromagnetic fields generated by power lines.
190

Otimização de enlace indutivo ressonante com três bobinas para transmissão de energia sem fio / Three coil inductive resonant link optimization for wireless power transfer

Silva, Marcio Antonio Pimenta da 30 March 2017 (has links)
Transmissão de energia sem fio através de indução magnética ressonante foi primeiramente apresentada por Nikola Tesla há mais de um século, mas as limitações tecnológicas da época não possibilitaram sua imediata aplicação. Somente ao final do século XX que sistemas comerciais baseados nesta técnica puderam ser implementados. Atualmente é a tecnologia que se mostra mais adequada para transferência de energia para equipamentos móveis portáteis, como smartphones e tablets. Também hoje é a única tecnologia disponível que permite o desenvolvimento de veículos elétricos energizados dinamicamente, isto é, enquanto em movimento. Nesta técnica de transmissão de energia sem fio, independentemente do nível de complexidade da aplicação, a passagem da energia entre lado da transmissão e recepção se dá por meio de um enlace eletromagnético formado por bobinas ressonantes. Várias configurações de bobinas podem ser usadas na construção deste enlace. Neste trabalho será estudado um sistema baseado em um enlace composto por três bobinas montadas em alinhamento axial. O desempenho do sistema será avaliado em termos da potência entregue à carga, eficiência da transmissão de energia e alcance do enlace. Os resultados do sistema de três bobinas serão comparados aos resultados de um sistema composto por duas bobinas operando sob condições semelhantes. A comparação deixa clara a maior flexibilidade do sistema de três bobinas, que se mostra capaz de operar em uma faixa mais ampla de valores de eficiência e potência que o sistema de duas bobinas. Serão definidas as condições limites que permitam ao sistema de três bobinas operar com maior eficiência, maior potência entregue à carga ou maior alcance de enlace que aqueles obtidos com um sistema de duas bobinas. Serão também apresentados resultados reais que mostram, para condições específicas de operação, uma potência entregue à carga quase duas vezes maior que aquela possível com o sistema de duas bobinas e, ao mesmo tempo, uma eficiência praticamente três vezes maior. / Wireless power transfer through magnetic induction was first presented by Nikola Testla a century ago but, technical limitations did not let its immediate application at that time. It was only late of XX Century that commercial systems based on this technology could be offered. Nowadays this technology is considered the most appropriated to be used with portable devices like smartphones, tablets and so on. Additionally, it is the only technology available for dynamic charging of electric vehicles. In other words, charging while they are moving. In this kind of wireless power transfer technology, the energy transfer from the transmitter to the receiver is made through an electromagnetic link created by resonant coils. Several coils configurations can be used to implement the link. This work will focus on a system with three-coils assembled on axial alignment. The system performance will be evaluated in terms of power delivered to the load, efficiency and link distance. The three-coil system results will be compared with two-coil system results working under same operational conditions. That comparison points out the greater flexibility of three-coil system. This kind of system shows to be capable to function over a wider range of efficiency and power delivered to the load, which is not possible to the first one. Moreover, conditions under which the three-coil system shows to be more efficient, or able to deliver greater power to the load than two-coil system, will be discussed. Real data will be presented, as a case of a specific point of operation, in which the power delivered to the load is almost two times higher and efficiency is almost three times greater than the ones verified when using a two-coil system.

Page generated in 0.0758 seconds