• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 268
  • 129
  • 125
  • 32
  • 22
  • 15
  • 13
  • 9
  • 7
  • 6
  • 6
  • 5
  • 5
  • 5
  • 4
  • Tagged with
  • 763
  • 229
  • 142
  • 141
  • 117
  • 97
  • 89
  • 88
  • 87
  • 82
  • 74
  • 56
  • 55
  • 54
  • 53
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
431

Podnikatelský záměr / Business Plan

Holík, Lukáš January 2013 (has links)
The goal of this dissertation is to create a business plan for mr. David Mokrý - owner of café Blue Queen in Boskovice. In a short time he would like to make his business bigger and found another café - pub (Black King).The needed data for creating a project of new successful restaurant, which should become the most popular in selected location, I'm going to get by many market analyses, respective by analyses of internal and external neighborhood.
432

Financování projektů ze zdrojů EU / Project Funding from EU Financial Resources

Císař, Jiří January 2013 (has links)
This masters thesis is focused on possibilities of financing a specific project from EU funds. Theoretical part of this thesis defines project and basic informations from project management. This part also describes an individual funds and politicies of European Union. The aim of the practical part is prepare fleasibility study of the project and evaluation of possible implementation. The project aims to support the education of the population.
433

Financování projektů ze zdrojů EU / Project Funding from EU financial resources

Medová, Veronika January 2013 (has links)
The topic of the diploma thesis Project Financing from EU Funds is the characteristics of the issue of raising funds for projects funded prom the EU. Theoretical part contains knowledge about project management and structural funds. The practical part includes prepare a feasibility study of the project. This project will be co-financed from EU Funds. In the end of the thesis is processed the whole procedure of submission the request.
434

Financování projektů ze zdrojů EU / Project Funding from EU Financial Resources

Knichalová, Gita January 2013 (has links)
This master's thesis deals with the problems of project management in the field of investment projects of recovering machine technology and their financing opportunities. The aim is to create a feasibility study of investment project of a new, modern technology based on a cooling of a bakery products and to assess its feasibility and effectivness. The rusult of this thesis will be a recommendation for the company, whether to implement the project or not.
435

Příprava velkoplošné investice pro sport a rekreaci / The Preparation of Large Investment for Sport and Recreation

Hanke, Václav January 2013 (has links)
The aim of this thesis is to prepare a study on feasibility of the area of a golf course in Mikulov. The study will be used as a material for potential negotiations with a possible investor. Drawing up a budget and quotation a total price of the project implementation are also the parts of the study.
436

Modelování a analýza rizik výstavbového projektu / Modelling and Risk Analysis of Civil Engineering Project

Náhlík, Martin January 2017 (has links)
The goal of this thesis is to analyze the most appropriate use of the building in order to achieve maximum profit. A feasibility study was used to analyze the issue of profitability. The main points addressed in the feasibility study were the marketing plan, cash flow and risk assessment. The result of the thesis is a decision about the project's feasibility based on the project indicators.
437

A feasibility study to test the potential efficacy of a rowing-related yoga program on male varsity competitive rowers

Kit, Alanna Katharine 07 May 2020 (has links)
The purpose of this present study was to assess the feasibility and determine the potential short-term efficacy of implementing a specific 9-week “Yoga for Rowers” (ROWGA) program on male varsity rowers during a competitive training season. Sixteen competitive male varsity rowers (20.6 ± 2.1 years) were recruited to participate, using a single group, pre-test-post-test, quasi-experimental research design. All participants performed two 60 min ROWGA sessions per week for 9 weeks during their fall competitive season. The primary objectives were to test the efficacy of a ROWGA program in a real-world context by evaluating: 1) the feasibility of implementing the program during the training and competitive season as measured by program adherence; 2) its potential effect on strength by evaluating hip muscle strength acting in the sagittal, frontal, and transverse planes as well as on hip muscle strength ratios between the agonist versus antagonist muscle groups; and 3) its potential effect on hip flexion range of motion (ROM). Two pre-test baseline measurements were performed on all participants over 1- week prior to initiating the ROWGA sessions while a single post-test was conducted following the ROWGA intervention. Intraclass correlation coefficients for ROM and strength were used to determine reliability of measurements by taking the two pre-intervention test scores. Outcome measures included hip flexion range of motion, peak isometric hip muscle forces normalized to body weight, including hip flexors, extensors, abductors, adductors, both internal and external rotators as well as peak isometric agonist-antagonist hip muscle strength ratios. Pre and post peak isometric hip strength measurements were calculated for agonist-antagonist muscle groups within each plane by dividing flexors by extensors, adductors by abductors, and internal by external rotators. Feasibility of the ROWGA program was determined from program attendance and adherence rates. The adherence rate was considered high with 89% attending all sessions, after adjusting for compulsory competitions. Significant improvements in peak isometric strength were demonstrated for hip flexors, extensors, abductors, and adductors, and external rotators, while a significant reduction for hip flexion ROM was observed. No significant changes in isometric hip muscle strength agonist-antagonist ratios were demonstrated. The results from this research support the feasibility of the ROWGA program in terms of rower’s acceptance, adherence, and the ability to accommodate the time requirements within their schedule as well as potential strength benefits gained. This research could help provide a platform for future large-scale research related to injury prevention in rowing. / Graduate / 2021-04-06
438

Feasibility Design – „Designqualität in Serie bringen“

Lender, Knut January 2016 (has links)
München: Auf dem Messegelände findet eine Audi Management Konferenz (MMK) in statt. Das Audi Journal berichtet zum ersten Mal von der MMK. Der Aufbruch: Rupert Stadler – der Vorstandsvorsitzende der AUDI AG – zeichnet in seiner Rede ein Bild über den Weg in die Zukunft. Die Themenschwerpunkte: digital, global, ultra, premium – was steckt dahinter? (AUDI AG 2014)
439

Shampoo-jabón ecológico en barra con esponja de lufa “Sukkiri” / "Sukkiri" ecologica Soap-shampoo

Caldas Muroya, Javier Alberto Seiyi, Murrugarra Cori, Andrea Estefany, Retto Parodi, Silvia Esther, Rodriguez Peralta, Fabiola Alexandra 31 July 2020 (has links)
El presente trabajo tiene como finalidad idear y planificar todas las actividades que son necesarias para dar inicio al proyecto de producción de shampoo-jabón en barra 100% natural y eco amigable, así como también demostrar la viabilidad de la idea de negocio. Hoy en día, existe gran diversidad de shampoos y jabones en el mercado, más no con la calidad y función que brinda nuestro producto, dígase, ser 100% natural y eco amigable. Como se manifestó en líneas anteriores, nuestro producto cumple la función de dos elementos en uno solo, es decir, jabón y shampoo al mismo tiempo, además de mencionar que cuenta con la incorporación de una esponja de lufa eco amigable para una mayor limpieza del cuerpo. El producto se ideó considerando a un público tanto femenino como masculino que apuesten por los productos naturales y amigables con el medio ambiente. Para determinar la viabilidad del proyecto se tomó en consideración aspectos del entorno externo e interno en el que se desarrollaría la empresa creada, así como también aspectos financieros, comerciales, planes estratégicos, de marketing, recursos humanos y de financiamiento que pudiesen contribuir con la determinación de la factibilidad de nuestra idea de negocio.
440

Feasibility Study of Solar-Wind Hybrid Power System for Rural Electrification at the Estatuene Locality in Mozambique

Silinto, Berino Francisco, Bila, Nelso Alberto January 2015 (has links)
This project work focuses on the feasibility study of a hybrid PV-Wind System for rural electrification at the Estatuene Locality in southern Mozambique. This is in line with electricity network expansion, which, in Mozambique shows high implementation cost and low operation cost. Through field research, an analysis was made of the actual electrical demand in the Estatuene rural community. The wind data was collected from the installed weather stations in the region while the solar data were extracted internally from the HOMER software by introducing the site coordinates. All the configurations, simulations and selection of hybrid systems were also made using HOMER. For the Estatuene rural community it was estimated a scaled annual average demand of 9.4 kWh/day with a peak load of 1.4 kW for DC charge; and a total scaled annual average of 133 kWh/day with a peak load of 15.3 kW for AC Charge. The annual mean solar potential is 5.205 kWh/m2/d, and the mean wind speed is 4.84 m/s for 12 meters above the ground. Thus the calculations and the selection of the best configuration of the hybrid system were crossed out with the technical specifications and costs of photovoltaic panels, wind turbines, power converter, batteries, and the electricity network, specifically for the comparison between an optimum hybrid system solution and two separate ones. The calculations presented an analysis of the technical and the financial viability of the selected hybrid system for local electric power production.

Page generated in 0.0969 seconds