• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 245
  • Tagged with
  • 245
  • 193
  • 178
  • 177
  • 172
  • 171
  • 169
  • 164
  • 161
  • 161
  • 149
  • 147
  • 144
  • 143
  • 141
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
61

Příprava a řízení stavební zakázky / Construction Order Preparation and Management

Horáková, Kateřina January 2014 (has links)
This thesis explains a theme of construction order preparation and management. The theoretical section describes common definition the term of project and then this section explains process of the project management. This is followed by a practical section where a construction company is introduced, this construction company provided a particular contruction order. This construction order is valued, then its processed an organizational structure, costs plan, time schedule and site accommodation for this construction order. The last part is the evaluation of the results and comparing with the results of construction company.
62

Stavebně technologický projekt Bioplynové stanice Pikárec / Construction technological project of Biogas station Pikárec

Sklenářová, Ludmila January 2014 (has links)
The thesis titled Biogas Plant Pikárec deals with the building technology preparation and implementation of the construction. Construction of a biogas plant consists of six main buildings which will be implemented in the area of agricultural cooperatives during its operation. All buildings will be designed as reinforced concrete. The aim of the thesis is the design time, financial and material resources to ensure the smooth progress of construction.
63

Lékařský dům ve Zlíně - příprava a organizace výstavby / The Medical House in Zlín - Planning and Organization of construction

Lukešová, Edita January 2014 (has links)
Diploma thesis contains descriptions of technological process of Medical House Kotěrova. The project includes a technical report for masonry and monolithic constructions, mechanization plans, safety and guality of work, report scheduling and organization of construction.
64

Stavebně-technologický projekt polyfunkčního domu v Brně / Building project

Benák, Dalibor January 2014 (has links)
This master's thesis focuses on a preparation of a multifunctional building in Brno, on Vídeňská street. It is based on a project that has been realized in 2005. Construction-technological preparation of this project includes the design of securing of time, financial, and human resources, project of construction site layout, a design of construction machines setup, technological manual for construction of monolithic reinforced concrete structure, plan of controls and tests for quality, and a manual for obtaining permission for using public space and protection of historical tree.
65

Projektové řízení realizace historické stavby se současnými zdroji / Project management of the construction of a historical building with the current sources

Lesonická, Lenka January 2014 (has links)
The thesis sets forth a proposal for possible solutions in the construction of the Pyramid of Cheops using current resources and 21st century technology. The management of the construction, basic regulations, contractual arrangements, and principles are described in the introduction. The body of the thesis gives a detailed description of the dimensions of the newly constructed pyramid and the types of technologies and materials that will be needed to realize the project. Financial costs, scheduling, and the progress of the construction will also form as an integral part of this thesis. The thesis will also concentrate on the equipment and all related follow up activities.
66

Stavebně technologický projekt bytového domu / Constructive technological project of block of flats

Kajzarová, Jitka January 2014 (has links)
This master´s thesis deals with the constructive technological project of block of flats. This is the small flats, located in the center of Třinec. Whole project is procesed to rough construction. The main part of the work are technical report, time and financial plan, study of imlementatio of the main technological phases, project site equipment, draft machine assembly, time plan of the main building structure, technological regulation for mounted ceramic ceiling and other documents necessary for construction planning.
67

Závislost ceny a lhůty výstavby vybraného stavebního objektu na použité technologii / Dependence of a price and a building period of selected construction on the technology

Jandová, Renáta January 2015 (has links)
The thesis focuses on the dependence of price and building period of selected construction on the technology of the certain object. Three different technologies are being compared regarding the supporting structure of the bridge. The first two technologies consider girder prefabs and the third technology involves a monolithic support plate. The technological method no. 1 is implemented through assembling of the girders via conveyor line with the assistance of mobile cranes; the method no. 2, on the other hand, implies the whole assembly from below the bridge also using mobile cranes. The method no. 3 is monolithic – the wooden basis is covered with concrete layer. The dependence of construction time and price is carried out by the comparison of methodologies through budgets, schedules, multi-criteria ratings and economic ratings.
68

Plánování a realizace výstavbového projektu zhotovitelem / Planning and implementation of construction project by the contractor

Vydrová, Michaela January 2015 (has links)
This thesis deals with the planning and implementation of construction project by the contractor. In the theoretical part, I wrote the basic concepts of project management, construction participants and temporal models of construction. Furthermore, I focused on the public procurement and its by tendering documentation. In the practical part I focused on a specific project, where I proposed an alternative course of the contract and the contract followed from its very beginning to evaluation.
69

Stavebně technologický projekt bytového domu ve Strážnici / Constructive technological project of block of flats in Strážnice

Rozumek, Jakub January 2015 (has links)
The theme of my diploma thesis is Building and Technological Project for a residential building in Strážnice. This is a study of the implementation of major technological stages of object SO- 01 residential building, the project concerning the construction site installation, design the mechanical assembly, traffic solutions, technological process earthworks, foundation structures, piles CFA and reinforced concrete ceiling construction. The work includes further object schedule, financial plan, a detailed timetable for construction of residential building, the budget, the inspection and the test plan, safety hazards on a construction site in the implementation of the substructure object and thermal technical assessment of selected structures.
70

Stavebně technologický projekt výstavby dálničního nadjezdu a přeložky silnice / Construction technological project of road and a bridge across of motorway

Schindler, Marek January 2015 (has links)
This Master’s thesis deals with a construction project and a technical solution of a realignment of a stretch of a road and a bridge construction, which converts this road over the motorway D47. The aim of the thesis, is to plan the construction works in a way that ensures that they are carried out in an optimal manner. The work concentrates on the solution of the site preparation and the characteristics of the surrounding conditions of the building site. Furthermore, it deals with the time and financial plan for the implementation of individual objects and the associated number of deployment of employees and machinery. The building works consist of two construction sites of the same importance, for the road this involves a study of major technological stages of implementation and a inspection and test plan of the road construction. For the bridge, it provides a processed itemized budget, schedule of work performed, technology standard and a plan for securing material resources.

Page generated in 0.0633 seconds