• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 245
  • Tagged with
  • 245
  • 193
  • 178
  • 177
  • 172
  • 171
  • 169
  • 164
  • 161
  • 161
  • 149
  • 147
  • 144
  • 143
  • 141
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
71

Stavebně technologické řešení objektu Centrum polymerních systémů Zlín / CONSTRUCTIVE TECHNOLOGICAL SOLUTION OF POLYMER SYSTEM CENTRE ZLÍN

Skopalová, Barbora January 2015 (has links)
This diploma thesis deals with constructive technological project of Polymer system centre in Zlín. Main aim of diploma thesis is working out on the rough construction with the point of view of material resources, financial plan and time plan. Thesis contents technical report, technological regulation for monolithic reinforced concrete frame, plan of lifting mechanization, construction site lay out, plan of controls and tests for quality, calculation and work schedule.
72

Stavebně technologický projekt Domova seniorů Pržno / Construction and technological project of Retirement Home Pržno

Machala, Jan January 2015 (has links)
This thesis describes the implementation of the proposed project, which concerns the reconstruction of the existing building of shopping center and restaurant. To built-in an atrium area, outdoor terraces and extension of the second storey superstructure of the building will be realized the project of the Retirement Home. This work contains a summary technical report, processing of technological regulations, report building equipment, design of the main building machines and mechanisms, assessment services, occupational health and safety plan, itemized budget and schedule subject to Retirement Home.
73

Finanční řízení stavební zakázky / Financial Management of Construction Order

Lakuš, Jan January 2015 (has links)
This thesis defines the issue of financial management of a construction contract and its application in practical analysis of the financial management of the real costs of real construction contracts. The aim is to analyze the model of financial management and analysis of building contract cost management and financing on selected construction contract.
74

Vybrané části stavebně-technologického projektu Rozvodna 110 kV Ostrava Hrabová / Selected Parts of Construction-Technological Project of Substation 110 kV Ostava Hrabová

Škrobánková, Zuzana January 2015 (has links)
This thesis deals with construction and technological project of 110 kV substation in Ostrava Hrabová. Includes design mechanical assembly, time and financial plan, technological studies during the construction of the main building structure, schedule, project site equipment, budgets and other documents that are required to correct the construction.
75

Stavebně technologický projekt montované haly / Construction technology project - assembled hall

Osina, Lukáš January 2015 (has links)
The subject of this diploma thesis is a construction technology project prefabricated tennis hall with facilities in Prostejov. The content of this work are technical regulations, technical reports, project site equipment, design of mechanical assemblies, schedule, budget, monitoring and test plan, work safety and environmental protection.
76

Polyfunkční dům v Šumperku. Stavebně technologická příprava stavby. / 4. The polyfunctional house in Šumperk. Construction Technology Preparation

Cahlík, Jakub January 2015 (has links)
The subject of the thesis is the construction and technological preparation of construction multifunctional building in Šumperk. The work includes a study of the implementation of all major phases of construction technology, building equipment, time and financial plan, design of the main building mechanisms, the timetable for the main building, technical regulations, inspection and test quality plan, schedule of occupational health and safety risks with the plan and selected structural details.
77

Vybrané části stavebně technologického projektu muzea motorsportu / Selected parts of constructional and technological project of motorsport museum

Kubrtová, Zuzana January 2016 (has links)
In this thesis I will deal with structural and technological preparation ELIZABETH - MUZEUM MOTORSPORTU. As a specific phase of construction, which I will focus, I chose a solution glass facade, designed by Schüco. This is the glass panels mounted in an aluminum frame. My work includes technical report, technological prescription for the installation of facades, design mechanical assemblies, time and financial plan, control plan and test plan.
78

Řízení stavební zakázky / Construction Order Management

Berger, Patrik January 2016 (has links)
This thesis deals with preparation and management of construction order. In the theoretical part there is described the definition of the term project, then management of project and leadership. In the practical part the investor and the contractor of the construction order will be introduced. This construction order is evaluated, then an organization structure, costs plan, time schedule and site accommodation are made. In the final part the thesis deals with evaluation of results and its comparison with the building company.
79

Stavebně technologický projekt integrovaného výjezdového centra Ostrava Dubina / Construction technological project of integrated emergency dispatch centre Ostrava Dubina

Ševčík, Tomáš January 2016 (has links)
This diploma thesis deals with construction-technological project of integrated emergency dispatch centre in Ostrava Dubina. In this work I especially deal with dispatch centre. Work included planning study of realization of the main technical stages, technological prescription for precast concrete frame, construction site equipment, time and financial construction plan.
80

Analýza a hodnocení rizik realizace úspory energie pomocí rekonstrukce školského zařízení / Analysis and risk assessment of implementation of energy saving via renovation of school facilities

Šafářová, Tereza January 2016 (has links)
The thesis is focused on analysis and risk assessment during the reconstruction of the school building. The work will be used appropriate methods to a specific reconstruction of school, especially checklist and risk catalog. They will be determined by the ris ks that caused the failure to comply with the schedule of works and thus limit the operation of school and the surrounding area. These risks will be set out measures that should determine how these scenarios could have been avoided.

Page generated in 0.0532 seconds