• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 65
  • 1
  • Tagged with
  • 66
  • 37
  • 31
  • 31
  • 29
  • 26
  • 22
  • 21
  • 20
  • 20
  • 18
  • 16
  • 16
  • 16
  • 16
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
61

Nové brněnské hlavní nádraží a jeho veřejná prostranství / Brno New Train Station and its Public Spaces

Nytrová, Bohdana January 2020 (has links)
For almost one hundred years, Brno has been deciding where the place of a new main train station should be. The works have almost started several times, but the various affairs have always postponed it. Two years ago, it was finally decided that „the River option“ would be constructed. So far, only the technological template has been written – e. g. railway bridge or platforms outline. The thesis focuses on the architectural design of the main building, the roof construction above the railways and spaces below the station bridge. In the design, the outlying urban structures are also dealt with. These include the locations of a bus station, taxi services and bike stands. Moreover, the design also mentions the station’s connection to the city networks. The main motive of the design is to put the main train station building into the centre of the city’s attractions – to make it visible. A boulevard’s view is oriented to the St. Peter’s cathedral – a famous Brno’s building. Just as the mentioned cathedral, the station is important for the city and deserves to be seen. A strong arched construction on four pillars serves as a roof over the railways and places where most visitors are expected to be most of the time. The arch also connects the public transport lines and the bus station. Part of a roof shaped like waves around the main hall connects the structure with the riverside nearby.
62

Zdravotně technické instalace ve studentských kolejích / Sanitation installation in student dormitories

Kucharik, Miroslav January 2015 (has links)
Diploma thesis describes the design of plumbing systems in student dormitories. The theoretical part discusses the types of waste water, focusing on gray water and its subsequent use. The experimental part is focused on measurement drinking water consumption and drinking water discharge in existing buildings student dormitories and apartment building. The work also contains other variants of possible installation solutions. The project is part of the selected solutions developed a variant form of project documentation for construction.
63

Vysokoškolské koleje v Olomouci / University dormitory in Olomouc

Pavelová, Michaela January 2016 (has links)
The theme of the diploma thesis is University dormitory in Olomouc. The aim of the diploma thesis is especially design of the project documentation for the building of University dormitory in Olomouc. The work includes drawings, text part and calculations. The building is designed as a detached object with six floors and one basement. The building is designed to accommodate university students and the accommodation capacity is 98 people. On the ground floor are designed offices, student club, laundry room and a bistro. In the basement are situated warehouses and technical rooms. The structural system is a monolithic reinforced concrete frame with masonry infill. The building is covered with a flat roof.
64

Nadstandardní studentské bydlení v Olomouci / Premium Student Housing in Olomouc.

Dohnálek, Ondřej January 2017 (has links)
This diploma thesis deals with the processing of project documentation of student housing in the city of Olomouc. The building is located near the university dormitory accommodation of Palacky University. It is designed to complement the missing type of accommodation. Building is a L-shaped five-storey, without a basement and with a flat roof. Structural system is mostly brick, only part of first floor is solved by columns. The building is divided into three building complexes. Two wings for the accommodation have 4 floors. The connector block has five floors, where the 5th floor is only the engine room. Foundation structures are concrete strips and foundation pads. South side of the building is protected from the sun by sunscreens, on which in a future could be installed photovoltaics. The building is divided into three parts in terms of functionality. 1.NP consists of commercial premises in the southern block and private rooms for accommodated in the eastern block. 2nd-4th floor forms spaces designed to accommodate students. Accommodation capacity is 105 people.
65

Rekonstrukce železniční stanice Svitavy / Reconstruction of Railway Station Svitavy

Marek, Josef January 2022 (has links)
The goal of this thesis was to design the reconstruction of the railway station Svitavy. The line speed was rised from the current value to 160 km·h-1. New platforms were designed, therefore the railway substructure and the drainage were adjusted accordingly. Also, the effective length of the main tracks was extended to 740 m.
66

Příprava realizace Vysokoškolských kolejí VUT v Brně / Preparation of realization of University dormitory BUT

Götz, Libor Unknown Date (has links)
The aim of this diploma thesis is to prepare the realization of college dormitories for the Brno University of Technology. A technical docummentation for the construction-technological project, transport routes design, time and financial schedule, budget according to technical – economic indicators, main technological stages implementation study, construction project, main construction machines proposal, time plan, and an item budget of the main construction object is prepared. An integral part of this thesis are the technological regulations, including control and test plans. And at the end the LEED certification and the health and safety plan were prepared.

Page generated in 0.0202 seconds