• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 21
  • 4
  • 3
  • 2
  • 2
  • 1
  • 1
  • 1
  • Tagged with
  • 40
  • 40
  • 17
  • 13
  • 11
  • 8
  • 8
  • 7
  • 7
  • 7
  • 6
  • 6
  • 5
  • 4
  • 4
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Evaluation and Assessment of New Demand Response Products based on the use of Flexibility in Industrial Processes: Application to the Food Industry

Alcázar Ortega, Manuel 25 February 2011 (has links)
En el marco de un mercado de la electricidad con precios cada vez más altos y donde la participación de fuentes renovables de generación está jugando un papel cada vez más importante, esta tesis supone un enfoque innovador hacia la participación de recursos de demanda en mercados de operación, prestando una atención especial a segmentos industriales como el sector alimentario con un consumo energético intensivo. En primer lugar, esta tesis describe detalladamente la situación actual de los programas de respuesta de la demanda que existen en diferentes partes del mundo. Este estudio permite concluir que los consumidores no han sido tenidos en cuenta suficientemente en la fase de diseño de los programas existentes, lo que ha provocado la infrautilización de recursos de demanda que, actualmente, permanecen sin explorar. Por otro lado, los consumidores no son conscientes del valor que su flexibilidad podría tener para el sistema eléctrico en su conjunto, ignorando que puedan existir otros agentes dispuestos a pagarles a cambio de reducir sus cargas en períodos determinados. Como resultado, esta tesis desarrolla una nueva metodología para explorar y valorar nuevos mecanismos de respuesta de la demanda donde el punto de vista de consumidores, operadores de red y cualquier otro agente interesado pueda ser tenido en cuenta. Esta metodología, basada en la evaluación y análisis detallado de los procesos, proporciona a los consumidores las herramientas adecuadas para evaluar su capacidad para reaccionar al precio de la electricidad, lo que permitiría al regulador poner en valor el beneficio social de dicha flexibilidad si pudiera ser utilizada en mercados de operación, ayudándole a definir los programas necesarios para utilizar de forma adecuada el potencial identificado por los consumidores. La metodología desarrollada en esta tesis ha sido aplicada satisfactoriamente al sub-segmento de la industria cárnica, por lo que varias fábricas pertenecientes a este segmento han sido estudiadas en detalle. En concreto, la factibilidad de las acciones propuestas ha sido probada y validada satisfactoriamente en una fábrica dedicada a la producción de jamón curado en España, en la que se han evaluado diferentes estrategias de flexibilidad. Finalmente, se ha realizado una evaluación económica de la rentabilidad de la aplicación de las acciones de flexibilidad propuestas tanto para el consumidor como para el sistema eléctrico en su conjunto, donde se han considerado los precios reales de los mercados de operación en España, aun cuando los consumidores no puedan participar realmente en dichos mercados en la actualidad. / Alcázar Ortega, M. (2011). Evaluation and Assessment of New Demand Response Products based on the use of Flexibility in Industrial Processes: Application to the Food Industry [Tesis doctoral no publicada]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/10078 / Palancia
22

An integrated energy efficiency strategy for deep mine ventilation and refrigeration / Abraham Jacobus Schutte

Schutte, Abraham Jacobus January 2014 (has links)
South Africa’s electricity supply is under pressure. Mining is one of South Africa’s largest electricity consumers with electricity-intensive services such as compressed air, cooling, ventilation, etc. More than 40% of mine electricity consumption is used for cooling and ventilation. There is a need to reduce the operational cost on a mine as electricity prices are set to increase at least 2% above South Africa’s inflation target. The mine-cooling and ventilation system was investigated for energy cost-saving. No clear energy and cost-saving strategy for the entire mine-cooling and ventilation system was found. Projects are implemented ad hoc and scattered throughout the system. A strategy is needed to help realise the total saving available on the entire mine-cooling and ventilation system. An implementation strategy for load-management and energy-saving projects on a mine-cooling and ventilation system was developed. A peak clip project on the surface BAC was developed and added to the strategy. The resultant strategy attains all savings throughout the entire mine-cooling and ventilation system. A peak clip project on the surface BAC of a typical mine results in an annual saving of R1.4 million. Implementing this new project on other mines could save R11 million annually. Implementing the sequenced combination of cooperative projects on a typical mine results in a saving of R30 million. That is a saving of 38% on the ventilation and cooling cost and 16% on the total mine electricity bill. / PhD (Mechanical Engineering), North-West University, Potchefstroom Campus, 2014
23

An integrated energy efficiency strategy for deep mine ventilation and refrigeration / Abraham Jacobus Schutte

Schutte, Abraham Jacobus January 2014 (has links)
South Africa’s electricity supply is under pressure. Mining is one of South Africa’s largest electricity consumers with electricity-intensive services such as compressed air, cooling, ventilation, etc. More than 40% of mine electricity consumption is used for cooling and ventilation. There is a need to reduce the operational cost on a mine as electricity prices are set to increase at least 2% above South Africa’s inflation target. The mine-cooling and ventilation system was investigated for energy cost-saving. No clear energy and cost-saving strategy for the entire mine-cooling and ventilation system was found. Projects are implemented ad hoc and scattered throughout the system. A strategy is needed to help realise the total saving available on the entire mine-cooling and ventilation system. An implementation strategy for load-management and energy-saving projects on a mine-cooling and ventilation system was developed. A peak clip project on the surface BAC was developed and added to the strategy. The resultant strategy attains all savings throughout the entire mine-cooling and ventilation system. A peak clip project on the surface BAC of a typical mine results in an annual saving of R1.4 million. Implementing this new project on other mines could save R11 million annually. Implementing the sequenced combination of cooperative projects on a typical mine results in a saving of R30 million. That is a saving of 38% on the ventilation and cooling cost and 16% on the total mine electricity bill. / PhD (Mechanical Engineering), North-West University, Potchefstroom Campus, 2014
24

Nya förutsättningar för elnätsföretagen : Förhandsregleringen 2016-2019 och dess påverkan på nätföretagens verksamhet / New terms for the electricity grid operators

Eriksson, Ida, Pettersson, Lisa January 2016 (has links)
To meet new regulations and the demand for a more sustainable energy system, the electricity grid will play an important role. Since the grid owners operate in a monopoly environment a regulating authority, the Swedish Energy Markets Inspectorate (Ei), sets a revenue cap that determines their profits. Changes were made for the regulating period 2016-2019, which now states that grid operators no longer can charge their customers with already depreciated grid components. To spur the grid operators to invest in smarter and more efficient technology, Ei also introduced two new economic incentives to make companies decrease their electricity losses and use the grid more evenly. The first aim of this thesis was to investigate how this new regulatory framework affected the grid operators, by performing interviews and sending out a survey. The result showed that the new regulatory decreases the grid operators’ profitability and also affects their investment strategies. The age of a grid has become more important than both efficient use of the grid and voltage quality when considering investments, since age now has a major impact on the profits. The new incentives however, has almost no effect on the way the grid operators act. The second aim of this study was to investigate how much a grid operator could save with these new incentives. A case study were conducted at Upplands Energi, a small local grid operator, and calculations with their usage data were performed in MATLAB. The results showed that load management by installing control equipment on costumers’ heat pumps and thereby decreasing their power peaks, could save money. By connecting 500 customers Upplands Energi could save about 150 000 SEK per year, and with 5 000 customers they could save almost half a million SEK per year.
25

Hylte carport : Carporten som laddar bilen

Larsson, Martin, Sarner, Viggo January 2017 (has links)
This study analyses a carport located in the Hylte municipality equipped with eight EV charging stations that use solar panels as its only roof material. The main focus of the report is to review the maximizing of internal electricity consumption, implementation of load management, effects on the local grid and to report general improvements. Data was collected from driving logs, analysis of charging patterns and the inverter. The data was then compiled with the software Polysun and MS Excel for further investigation of internal electricity consumption, load management, electricity quality and more. The report shows that there is a 29.1 % internal energy consumption and that implementation of a 100 kWh battery may raise it to as much as 57.4 %. It also shows that there is a possibility of saving up to 39 238 SEK per year with the implementation of load management and that a 19 % increase of electricity production would be possible if the construction had the optimized direction and roof angle.
26

Multi-Dimensional Energy Consumption Scheduling for Event Based Demand Response

Rana, Rohit Singh 19 November 2019 (has links)
The global energy demand in residential sector is increasing steadily every year due to advancement in technologies. The present electricity grid is designed to support peak demand rather than Peak to Average (PAR) demand. Utilities are investigating the residential Demand Response (DR) to lower the (PAR) ratio and eliminate the need of building new power infrastructure. This requires Home Energy Management System (HEMS) at grid edge to manage and control the energy demand. In this thesis, we presented an MDPSO based DR enabled HEMS model for optimal allocation of energy resources in a smart dwelling. The algorithm is designed to lower peak energy demand as well as encourage the active participation of customers by offering a reward to comply with DR request. We categorized appliances as elastic non-deferrable loads and inelastic deferrable loads based on their DR potential and operating characteristics. The scheduling of elastic and inelastic class of appliances is performed separately using canonical and binary version of PSO given how we expressed out load categories. We performed use case simulation to validate the performance of MDPSO for combination of different tariffs: Time of Use (TOU), TOU and Critical peak rebate signal (CPR), TOU and upper demand limit. Simulation results show that algorithm can reduce the electricity cost in range of 28% to 7% under increasing comfort conditions in response to TOU prices and Peak demand reduction of about 24% under TOU pricing and medium comfort conditions for single household. Under CPR DR requests, with respect to TOU pricing, there is effectively no change in the peak under the minimum comfort scenario. Furthermore, algorithm is able to suppress the peak upto 25% under combination of TOU and hard constraint on maximum power withdrawn from grid with no change in the electricity cost. Scheduling of multiple houses under TOU pricing results in peak reduction of 7 % as compared to baseline state. Under combination of TOU and CPR the aggregate peak energy demand of multiple households during DR activation time intervals is reduced by 32 %. The algorithm can suppress the peak demand by 27% under TOU and hard constraint on maximum power withdrawn from grid by multiple houses.
27

Locational Marginal Price Forecasting with Artificial Neural Networks under Deregulation

Lai, Yi-Jen 15 August 2005 (has links)
Power systems all over the world advance towards the direction of deregulation in the past few years. Introducing competition mechanism and the principle of market rules in deregulation. Utility companies will face unprecedented changes and challenges. Taiwan power company is also working on the deregulation direction with a competitive environment opened up, it will improve the scientific and technological levels and the service quality of electricity. Load management functions as the marginal price of electricity is predicted. Consumers can get Real-Time Pricing information determine their own buying strategy. One most representative deregulation example in U.S.A. is the PJM(Pennsylvania¡BNew Jersey¡BMaryland)system combining generating, transmitting, distribution and sales of electricity. It offers the information of real-time power supply and is one of the cases in the world. Historical data in the thesis comes from PJM. Artificial Neural Network was designed to the Locational Marginal Price(LMP), considering the factors such as temperature and other relevant data from deregulation with the introduction of various parameters in forecasting, and the use of week as a counting base. LMP will be forecasted. The forecasted results will be to check the accuracy and performance with initial data.
28

Reliability Constrained Optimal Investment in a Microgrid with Renewable Energy, Storage, and Smart Resource Management

2015 September 1900 (has links)
Environmental concerns have led to a rapid increase in renewable energy development and production as the global demand for electricity continues to increase. The intermittent and uncertain nature of electricity generation from renewable sources, such as wind and solar, however, create significant challenges in maintaining power system reliability at reasonable costs. Energy storage and smart-grid technologies are perceived to provide potential solutions to these challenges in modern power systems of different sizes. This work investigates the opportunity to incorporate energy storage in microgrids with renewable energy production, as well as applying smart microgrid management techniques to reduce the lifetime costs while maintaining an acceptable level of reliability. A microgrid consisting of a 5 home community with generation supplied by two propane generators to meet the “N-1” reliability criterion is used as the base case scenario. Actual load data of typical homes is obtained from the industry partner. An equivalent loss of load expectation criterion is used to benchmark the acceptable reliability level. A model is developed to calculate the lifetime operational cost of the base case scenario which is used to assess the benefit of the addition of renewable energy sources, energy storage, and smart microgrid management techniques. A MATLAB program is developed to assess the 20 year operational costs of various combinations of renewable energy sources and battery energy storage, which will be considered the lifetime of the system. The combination of generation and storage which yields the lowest lifetime operational cost is defined as the optimized microgrid, and is used as a basis to determine if additional savings are realized by the implementation of a microgrid operated by a Smart Microgrid Management System (SMMS). The conceptual layout of the proposed SMMS is presented along with identified methods of utilizing in-home thermal storage. The SMMS mechanism is discussed along with proposed functionality, potential methods of employment, and associated development and implementation costs. The microgrid operated by the SMMS is assessed, and its lifetime operational cost is presented and contrasted against the base case microgrid and the optimized microgrid. A power system reliability evaluation of the proposed microgrids are conducted using a probabilistic method to ensure that reliability is not sacrificed by the implementation of a cost-minimized microgrid. A sequential Monte Carlo simulation model is developed to assess the power system reliability of the various microgrid configuration cases. The functionality of this model is verified using an existing reliability assessment program. The results from the presented studies show that the implementation of renewable energy sources, energy storage, and smart microgrid management techniques are an effective way of reducing the operational cost of a remote microgrid while increasing its power system reliability.
29

Optimering av last och produktion i Gävles fjärrvärmenät : Reducering av effekttoppar via värmelagring i byggnader

Elofsson, Fredrik January 2019 (has links)
District heating is today the most common way of providing a building with heat and hot water in Sweden. It is an environmentally friendly product mostly used with renewable fuel. However, at power peaks most companies use production units that are more expensive and worse for the environment and should therefore be avoided as much as possible. This can be done with a method called load management. When a power peak occurs, the heat supply to buildings connected to the district heating system can be temporarily reduced. The heat energy can later be returned when the heat demand is lower. Thanks to the heat inertia of the buildings, the indoor temperature will not fall within the time frame for the load management. Historical data has been analysed to identify when and why power peaks occur in the district heating network. Power peaks throughout the district heating network have proved difficult to identify. However, for individual consumers clear patterns of power peaks have emerged. These power peaks mainly occur because of large use of hot water but also because of the shifting outdoor temperature. In order to see how the production cost would differ from the actual outcome load management was applied for Gävle's district heating 2018. The load management was calculated manually by identifying the most expensive production unit on an hourly basis. If a cheaper production unit had the potential to deliver higher power the next hour, the production was moved to the cheaper production unit. The process was repeated for each hour during 2018. After carrying out load management for Gävle's district heating network, 1 457 MWh had been shifted to a cheaper production unit. This resulted in a financial saving of 1,0 % of the total production cost. The environmental savings showed a reduction from 6.1 to 5.9 g CO2eq /kWh a total of 197 tonne CO2eq. In the exact same way, a load management was performed for a scenario where Gävle and Sandviken's district heating network were connected. The gain for a load management with Sandviken will be considerably larger, a reduced production cost of 3.6 % is possible. The environmental savings showed a reduction from 8.4 to 7.8 CO2eq /kWh a total of 575 tonne CO2eq. For future efficient load management, buildings should be divided into different classes depending on the building's time constant. User patterns for the entire district heating network have proved difficult to detect. Artificial intelligence can be an option for short-term forecasting of the power output / Fjärrvärme är idag det vanligaste sättet att förse en bostad med värme och tappvarmvatten i Sverige. Fjärrvärmen är ofta en miljövänlig produkt som kan produceras av till exempel biobränsle- och avfallseldade kraftvärmeverk eller spillvärme från industrier. Vid tillfälligt högt effektbehov, effekttoppar, använder sig merparten av bolagen av dyrare produktionsenheter med större miljöpåverkan. Dyrare produktionsenheter bör undvikas i största möjliga mån och i detta syfte används metoden laststyrning. Vid en effekttopp kan värmetillförseln till byggnader sänkas temporärt för att återföras några timmar senare när effektbehovet är lägre. Tack vare värmetrögheten i byggnaderna bör inomhustemperaturen inte sjunka inom tidsramen för laststyrning. Statistik från Gävles fjärrvärmanvändning på timbasis under 2018 har analyserats för att identifiera när och varför effekttoppar sker. Effekttoppar i hela fjärrvärmenätet har visat sig svåra att identifiera. På lokal nivå har däremot tydliga mönster för effekttoppar framkommit. Dessa effekttoppar beror till största del av tappvarmvattenanvändning men även förändringar i utomhustemperaturen. För att se hur produktion och last kunde skiljt sig från det verkliga utfallet tillämpades laststyrning för Gävles fjärrvärmeproduktion 2018. Laststyrningen beräknades manuellt genom att den dyraste produktionsenheten identifierades på timbasis. Om en billigare produktionsenhet hade potential att leverera högre effekt nästkommande timmar försköts produktionen. Därefter upprepades processen för varje timme under 2018. Efter utförd laststyrning för Gävles fjärrvärmenät hade ca 1 457 MWh förskjutits till en billigare produktionsenhet. Det gav en ekonomisk besparing på 1,0 % av Gävles totala produktionskostnad. Den miljömässiga besparingen visade på en sänkning från 6,1 till 5,9 [g CO2ekv /kWh] sammanlagt 197 ton CO2ekv. På samma sätt utfördes en laststyrning för ett scenario där Gävle och Sandvikens fjärrvärmenät sammankopplats. Vinsten för en laststyrning med Sandviken blev betydligt större med en minskad produktionskostnaden på 3,6 %. Den miljömässiga påverkan sjönk från 8,4 till 7,8 g CO2ekv /kWh sammanlagt 575 ton CO2ekv. För en framtida effektiv laststyrning bör byggnader delas in i olika klasser beroende på byggnadens tidskonstant. Användarmönster för hela fjärrvärmenätet har visat sig svårt att identifiera. Artificiell intelligens kan vara ett alternativ i framtiden för att prognostisera effektuttaget
30

Integrierte Modellierung von Durchflussdynamik und salinarer Stofftransportprozesse unter Berücksichtigung anthropogener Steuerungen am Beispiel der Unstrut / Integrated modelling of flow discharge and saline solute transport processes under consideration of anthropogenic management strategies in the Unstrut river basin

Voß, Frank January 2005 (has links)
Durch die Stilllegung der Kali-Gewinnung und -Produktion zwischen 1990 und 1993 sowie die begonnene Rekultivierung der Kali-Rückstandshalden haben sich die Salzfrachteintragsbedingungen für die Fließgwewässer im "Südharz-Kalirevier" in Thüringen zum Teil deutlich verändert. Aufgrund erheblich geringerer Salzeinträge in die Vorfluter Wipper und Bode ist es möglich geworden, zu einer ökologisch verträglichen Salzfrachtsteuerung überzugehen. Die Komplexität der zugrunde liegenden Stofftransportprozesse im Einzugsgebiet der Wipper macht es jedoch unumgänglich, den Steuerungsvorgang nicht nur durch reine Bilanzierungsvorgänge auf der betrachteten Steuerstrecke zu erfassen (so wie bisher praktiziert), sondern auch die Abflussdynamik im Fließgewässer und den Wasserhaushalt im Gebiet mit einzubeziehen. <br><br> Die Ergebnisse dieser Arbeit dienen zum einen einer Vertiefung der Prozessverständnisse und der Interaktion von Wasserhaushalt, Abflussbildung sowie Stofftransport in bergbaubeeinflussten Einzugsgebieten am Beispiel der Unstrut bzw. ihrer relevanten Nebenflüsse. Zum anderen sollen sie zur Analyse und Bewertung eines Bewirtschaftungsplanes für die genannten Fließgewässer herangezogen werden können. Ziel dieser Arbeit ist die Erstellung eines prognosetauglichen Steuerungsinstrumentes, das für die Bewirtschaftung von Flusseinzugsgebieten unterschiedlicher Größe genutzt und unter den Rahmenbedingungen der bergbaubedingten salinaren Einträge effektiv zur Steuerung der anthropogenen Frachten eingesetzt werden kann. <br><br> Die Quellen der anthropogen eingeleiteten Salzfracht sind vor allem die Rückstandshalden der stillgelegten Kaliwerke. Durch Niederschläge entstehen salzhaltige Haldenabwässer, die zum Teil ungesteuert über oberflächennahe Ausbreitungsvorgänge direkt in die Vorfluter gelangen, ein anderer Teil wird über die Speichereinrichtungen gefasst und gezielt abgestoßen. Durch Undichtigkeiten des Laugenstapelbeckens in Wipperdorf gelangen ebenfalls ungesteuerte Frachteinträge in die Wipper. Ein weiterer Eintragspfad ist zudem die geogene Belastung. <br><br> Mit Hilfe detaillierter Angaben zu den oben genannten Eintragspfaden konnten Modellrechnungen im Zeitraum von 1992 bis 2003 durchgeführt werden. Durch die Ausarbeitung eines neuartigen Steuerungskonzeptes für das Laugenstapelbecken Wipperdorf, war es nun möglich, die gefasste Haldenlauge entsprechend der aktuellen Abflusssituation gezielt abstoßen zu können. Neben der modelltechnischen Erfassung der aktuellen hydrologischen Situation und der Vorgabe eines Chlorid-Konzentrationssteuerzieles für den Pegel Hachelbich, mussten dabei weitere Randbedingungen (Beckenkapazität, Beckenfüllstand, Mindestfüllstand, Kapazität des Ableitungskanals, usw.) berücksichtigt werden. <br><br> Es zeigte sich, dass unter Anwendung des Steuerungskonzeptes die Schwankungsbreite der Chloridkonzentration insgesamt gesehen deutlich verringert werden konnte. Die Überschreitungshäufigkeiten bezüglich eines Grenzwertes von 2 g Chlorid/l am Pegel Hachelbich fielen deutlich, und auch die maximale Dauer einer solchen Periode konnte stark verkürzt werden. Kritische Situationen bei der modelltechnischen Frachtzusteuerung traten nur dann auf, wenn Niedrigwasserverhältnisse durch die Simulationsberechnungen noch unterschätzt wurden. Dies hatte deutliche Überschreitungen der Zielvorgaben für den Pegel Hachelbich zur Folge. <br><br> Mit Hilfe des Steuerungsalgorithmus konnten desweiteren auch Szenarienberechnungen durchgeführt werden, um die Auswirkungen zukünftig zu erwartender Salzfrachten näher spezifizieren zu können. Dabei konnte festgestellt werden, dass Abdichtungsmaßnahmen der Haldenkörper sich direkt positiv auf die Entwicklung der Konzentration in Hachelbich auswirkten. Durch zusätzlich durchgeführte Langzeitszenarien konnte darüber hinaus nachgewiesen werden, dass langfristig eine Grenzwertfestlegung auf 1,5 g Chlorid/l in Hachelbich möglich ist, und die Stapelkapazitäten dazu ausreichend bemessen sind. / As a consequence of general closure and conversion of potash-industries between the years 1990 and 1993 and due to the beginning of recultivation activities on the potash stockpiles the load of dissolved potassium salt of rivers in the "Südharz-Kalirevier" in the German federal state of Thuringia has considerably changed. The extremely decreased salt inputs into the tributaries of Wipper and Bode were accompanied by a change in salt load management towards a system controlled with respect to river ecology. Due to the high complexity of salt transport processes in the Wipper catchment, the existing operation rules cannot comply with the present requirements, so that a comprehensive knowledge of water balance processes and river flow dynamics have to be included in management strategies. <br><br> On the one hand this investigation aims to analyse the processes and the interaction of water balance, runoff generation and solute transport in catchment areas influenced by salt mining activities such as the case in the river Unstrut and its relevant tributaries. On the other hand the results of this study can help to analyse and assess sustainable management plans for the above mentioned river basins. Thus the main objective of this study is to develop an integrated, predictive management tool, that can be applied for catchment areas of different spatial scales and for the effective use of controlled discharge of anthropogenic salt solution taking into account the basic input conditions from salt mining activities. <br><br> The most important sources of anthropogenic salt inputs into the river stream are the salt loads from the potash stockpiles near the disused mines. Due to usual precipitation salt solution leaches from the stockpiles, which partly reaches the river streams uncontrolled by lateral interflow processes. Another part is being gathered in reservoirs and than discharged according to special system operation rules. As well dissolved salt loads comes into the Wipper by leakage processes out of the reservoir in Wipperdorf. Furthermore geogenic input is another important emission pathway. <br><br> With detailed information about these different emission pathways, model simulations were performed within the period from 1992 to 2003. After the technical implementation of a new management strategy for the reservoir in Wipperdorf, now it was possible to push off the stored lye according to the actual runoff situation in the river stream. Beside a fully modell aided description of the whole actual hydrological situtation and provided control values for chloride concentration at the gauging station in Hachelbich, also other boundary conditions had to be considered for this purpose (such as reservoir capacity, actual fill level, minimum fill level, drain capacity etc.). <br><br> It turned out, that the application of the new management strategy led to a clear decreased range in chloride concentration. Frequencies of exceeding a critical value of 2 g chloride/l at gauging station in Hachelbich enormously declined and the maximum duration of such periods could rigorously be shortened. Particluar critical situations in calculating potential lye discharge only occured when measured flow discharge was underestimated through model simulations. In this case control values for the gauging station in Hachelbich could not be achieved. <br><br> With this new management tool scenario simulations were executed to analyse the effects of expected amounts of lye in future. These theoretical studies showed the decreasing trend in chloride concentration if restorations measures at the stockpiles would be continued. Longterm scenario runs also showed, that a threshold value of 1,5 g chloride/l in Hachelbich could be achieved and existing storage capacities therefor will be sufficiently dimensioned.

Page generated in 0.0758 seconds