Spelling suggestions: "subject:"praat""
51 |
Srovnání vlivu tvaru konvergentní a Lavalovy dýzy v clonkách detektoru na výsledný tlak na dráze sekundárních elektronů pomocí systému CAE / Using Computer Aided Engineering for analyse the detectorVyroubal, Petr January 2011 (has links)
This master's thesis deals with influence of the shape comparison of convergent and Laval nozzles in the secondary electron detector shutters to the resulting pressure and gas flow in the secondary electron detector for environmental scaning electron mictoscope. To the detector analysis are used Computer Aided Engineering systems CAD and CAE, SolidWorks and SolidWorks Flow Simulation.
|
52 |
Analýza rozložení teplotního profilu v pájecí peci pomocí systémů CAE / Analysis of the distribution of the temperature profile in the furnace brazing using CAE systemsStručovský, Aleš January 2013 (has links)
The aim of this project is using the CAE system to analyze the distribution of the temperature profile brazing furnace DIMA 0180. To create the model is used SolidWorks Premium 2012. The simulation is performed using the Flow Simulation. This work builds on the knowledge diploma thesis by Martin Procházka titled The effect of different heat capacities and components on the longitudinal temperature profile for reflow soldering. We start from the knowledge of heat transfer, especially of heat conduction and radiation, which appear in the furnace.
|
53 |
Aplikace metodiky Projektového managementu na projektu v podniku / Project Management Methodology Application on Company´s ProjectSalaj, Tomáš January 2011 (has links)
Diploma thesis focuses on the development of parking building with commercial premises Rychtářka in Plzeň, which is realized in the form of public and private sector partnership. The thesis deals with effective application of project management methods in light of the general contractor Hermosa Parking Plzeň a.s. Information and knowledge gained in the theoretical part of the thesis are then used in the practical part for the design of project management methodics on development project Rychtářka. The outcome of practical part of the thesis is project management methodic, which should help to secure the optimal solution for complex structured process that leads to the realization of parking building Rychtářka and the compliance with all the specific characteristics of development projects.
|
54 |
Výrobní hala nástrojárny firmy TOKOZ - stavebně technologický projekt / Production hall of toolmaking company TOKOZ - Construction and technology projectChytal, Roman January 2015 (has links)
The thesis is focused on building technology solutions construction production hall toolmaking of company TOKOZ,a.s. in Žďár nad Sázavou. This thesis contains technical report, construction site equipment project, time and financial plan, bill of quantities, technology study of the major technology stages, mechanical assembly design, technological specification, quality inspections and risks in the implementation of ground works.
|
55 |
Analýza vybraných sekcí české a německé energetiky. Energetická partnerství obou zemí v kontextu zajištění energetické bezpečnosti a jednotného evropského trhu / Analysis of chosen Czech and German energy sectors. Energy partnership in the context of energy security and EU common marketMohr, Luděk January 2013 (has links)
The presented thesis compares chosen energy industry sectors of the Czech Republic and Federal Republic of Germany and more concretely analyses the degree of energy security of both countries within the context European region. Theoretical background is based on the concurrence of neorealism with neoliberalism and can be identified as main driver of the European energy sector. The thesis had been written as a response to an unexpected shift of German energy policy from fossil towards renewable resources. This change sparked broad public discussion which questioned these concrete steps of German government with regard to the country's energy security. The author of this thesis is, however, trying to provide the point that the development of the European energy towards renewable energy, as well as the finalization of the single energy market will in the long run substantially improve individual and collective energy security of all member states.
|
56 |
Bytový dům v Ivančicích - stavebně technologický projekt / Apartment building in Ivančice - building technology projectŠagát, Pavel January 2019 (has links)
The goal of this thesis is a construction technological project of an apartment building in Ivančice. The work focuses on the graphic visualisation of earth and foundation works progress and consequently on the item budget and timetable for construction works. Technological regulation for earth and foundation works with the changes on foundation constructions, organization of the construction, construction site equipment plan, draft of the main machinery and mechanisms are also part of this work. Technical report, coordination layout with a description of transport options, schedule, and financial plan are also part of this thesis.
|
57 |
Stavebně technologický projekt skladovací haly / Construction technology project of storage hallPetrík, Tomáš January 2013 (has links)
In this diploma thesis is processed build-up organization of logistics centre in Ostrava. The build-up organization covers the implementation of ground works, foundation constructions and precast concrete framework. Storage hall of logistics centre is based on drilled concrete piles and precast concrete framework makes up main structure. Construction technology project contains time-schedule and financial plan for whole project, time-schedule of construction works, budget, technological standard for precast concrete framework, design of building site accessories, design of machine group, safety plan, check and test plan.
|
58 |
Stavebně technologický projekt dvoulodní haly ve Fulneku / Constructive Technological Project of Two-Aisle Hall in FulnekSelník, Petr January 2013 (has links)
The subject of this diploma thesis are chosen parts of building technological project of pursuance of the factory building Massag in Fulnek based on the metal bearing structure. This diploma thesis contents study of realization of main technological process of the hall, financial and time plan of building, project of construction site installation, budget of the construction, time planning of works, inspection and test plan, the project of safety and protection of health at work, technological regulation of building metal bearing structure.
|
59 |
Funkční díly v ocenění stavebního objektu / Functional parts valuation of the buildingŠevčík, Jaroslav January 2016 (has links)
Diploma thesis deals with comparing of current awards by Classification of building structures and works and awards by Functional parts. It is possible to calculate Building life cycle costs by Functional parts. This is definately the advantage of the system because the calculation cannot be done by Classification of building structures and works. A new law on public procurement deals with Building life cycle costs as an evaluation criterion. So it is recommended to use Functional parts awards. The other goal of the thesis is to find bridges between Functional parts and the issue of BIM. BIM is a trend of global construction industry.
|
60 |
Bytový dům Terasy Havlíčkova - vybrané části STP / The Havlíčkova Terraces Apartment Building - Selected Parts of the Construction and Technological ProjectKrejčí, Vlastimil January 2012 (has links)
Architectural and technological project of building the housing Terraces Havlickova contains technical report on construction technology project,coordination situation, building relationships with the wider transport routes, time and financial plan of the building object, study the implementation of major technological stages of a residential building,Project construction site, design of the main building machines,schedule of the main building construction object SO-01,plan for securing material resources for the construction of residential house,technological regulation for the implementation of excavations and roofs,inspection and test plan for the implementation of the excavations and roofs. The other award was prepared itemized budget apartment house SO-01, calculation of construction according to THU, health and safety plan and Listing of security risks and security measures on site
|
Page generated in 0.0514 seconds