• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • Tagged with
  • 3
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Information for production control / Informationsbehov i produktionsfasen

Svehn, Ludvig, Thunberg, Kristoffer January 2013 (has links)
Syftet med studien är att utvärdera behovet av digitala informationsverktyg i produktionsfasen. Byggbranschen arbetar ständigt för att effektivisera arbetsmetoder i produktionsfasen. För att hantera dagens ökade informationsflöde samt möta marknadens krav på effektivisering av byggprocessen har vissa företag börjat använda digitala informationsverktyg som hjälpmedel. Detta för att hantera flödet av information ut till byggarbetsplatsen. I studiens inledande kapitel behandlas byggprocessens delar för att presentera den information som ligger till grund för produktionen. Detta följs av den information som genereras för styrning i produktionsfasen. Genom att erhålla denna information kan en utvärdering av informationsverktygens tillämpning utföras. Studien har genomförts på företaget Skanska. För att samla underlag till studien har det skett observationer och intervjuer på projektplatserna, vilket redovisas och ligger till grund för resultatet. Resultatet av studien har visat på fördelarna med informationstillgänglighet i kombination med rörlighet. Tjänstemännen (produktionschefer och arbetsledare) är i störst behov av informationsverktyg på grund av dess informationsbehov kombinerat med rörlighet i arbetet. Yrkesarbetare har inte samma informationsbehov därav är ett stationärt verktyg fullt tillräckligt i dess dagliga arbete.
2

Införandet av digitala hjälpmedel i byggproduktion

Brette, Albin, Mattsson, Jonathan January 2018 (has links)
Digitaliseringstakten inom svensk byggindustri är låg, speciellt under produktionsfasen i ett byggprojekt. Flera studier visar på fördelar med att använda mer digitala hjälpmedel, exempelvis BIM samt digital ärendehantering på byggarbetsplatserna. I och med ökade energikrav och ökad komplexitet som följd, ökar kostnaderna för installationer i byggnader. Kostnaderna uppgår i vissa fall till så mycket som 50-60% av den totala produktionskostnaden och det finns stora vinningar att effektivisera förfarandet med hjälp av digitala hjälpmedel för exempelvis samordning av de olika arbetsmomenten och ärendehantering under produktionsfasen. Trots de möjligheter och fördelar som ett mer digitalt arbetssätt kan skapa för byggproduktionen sker inte införandet av digitala hjälpmedel på bred front i de olika projekten. Genom att kartlägga vilka utmaningar som finns vid införandet av digitala hjälpmedel i byggproduktion samt undersöka hur kunskapsöverföring kan bidra till att effektivisera införandeprocessen, syftar denna studie till att undersöka hur byggföretag kan öka användningen av digitala hjälpmedel under produktionsfasen. För att besvara studiens syfte genomfördes en kvalitativ fallstudie med ett fokus på installationsområdet under produktionsfasen. För att få en ökad förståelse för hur digitala hjälpmedel införs och sprids i byggbranschen samt belysa vilken roll kunskapsöverföring har vid införandet av digitala hjälpmedel i byggproduktion, har litteratur från två forskningsområden studerats närmare i en litteraturstudie: innovationsspridning samt kunskapsöverföring. Litteraturstudien mynnar ut i den teoretiska referensram som sedan användes som grund till den tematiska analys som utförts i studien. I studiens slutsats presenteras vilka utmaningar som finns vid införandet av digitala hjälpmedel, vilka är decentraliserad organisationsstruktur, kortsiktighet samt anpassning av digitala hjälpmedel. För att effektivisera införandet framkom att erfarenhetsutbyte, personligt stöd under implementering, lärdomar från pilotprojekt och fördelning av individer med digital kompetens är viktiga aspekter för att effektivisera och således öka användandet av digitala hjälpmedel under produktionsfasen. / The rate of digitization in the Swedish construction industry is low, especially during the production phase. Several studies show the benefits of using more digital tools, such as BIM and digital tools for case management, at the construction sites. As a result of the increased energy requirements and complexity, the cost of installations in buildings increases. In some cases, the costs are as much as 50-60% of the total production cost, and there are great benefits to streamline the process using digital tools such as coordination of the various work moments and case management during the production phase. Despite the opportunities and benefits that a more digital way of working can create for the construction industry, the wide-fronted introduction of digital tools does not occur in the various projects. By mapping challenges when introducing digital tools in the construction phase and investigating how knowledge transfer can help streamline implementation, this study aims at investigating how construction companies can increase the use of digital tools during the production phase. To answer the purpose of the research, a qualitative case study was conducted with a focus on installation work during the production phase. To gain a better understanding of how digital tools are introduced and spread in the construction industry, as well as highlighting the role of knowledge transfer when introducing digital tools in building production, literature from two research areas has been studied in more detail in a literature study: Diffusion of innovation, and Knowledge transfer. The literature study appears in the theoretical reference framework, which was then used as the basis for the thematic analysis that was made in the study. The study's conclusion presents the challenges involved in the introduction of digital tools, which are a decentralized organizational structure, short-sightedness and adjustment of digital tools. In order to streamline the introduction, experience sharing, personal support during implementation, lessons learned from pilot projects and an even distribution of individuals with digital skills are important aspects of efficiency, thus increasing the use of digital tools during the production phase.
3

Uppbyggnad av flervåningshus : Jämförelse mellan trästomme kontra traditionell betongstomme ur ett praktiskt perspektiv samt ur brand- och fuktrisker

Khedher, Amin, Divanian, Mohammed, Chehab Eddine, Sirin January 2022 (has links)
Purpose: This work has been based on getting more builders to want to build multi-storey houses with a wooden frame instead of a concrete frame. Building with various frame materials, concrete and wood, has good properties but also its challenges. On the other hand, competence and experience have a major influencing role during the production phase. This degree project has been chosen to be written by PEAB. The work focuses on and deepens itself within fire risks and moisture problems. This degree project also addresses what experience and competence look like and how they affect the production phase. Method: This work consists of literature study, case study, interviews, study visits and reference object description. Where information was taken from previous degree projects, scientific articles and research  reports. The case study that was done for this work was about two different schools, Westerlundska gymnasiet and Irstaskolan, where both are built by PEAB. There were also interviews with site managers, fire consultants and contracting engineers, where relevant questions about the subject areas fire and moisture were asked in connection with concrete frames and wooden frames. Results: Concrete as a material has good properties around fire and moisture. Concrete as a building material has long been used in the construction industry, where competence and experience are high. However, certain shortcomings in the event of a fire can occur when a multi-storey building with a concrete frame is built. Wood as a building material has other properties compared to the building material concrete. An important property of wood is that it maintains a much lower temperature on the various parts that have not caught fire yet. Conclusion: The conclusions from this project are that many construction actors choose to build with a concrete frame instead of a wooden frame. This is because experience and competence in concrete frames is greater than in wooden frames. From a fire and moisture perspective, there are challenges and solutions when it comes to concrete frames and wooden frames. It has long been built with a concrete frame, which means that more construction players have more competence and experience when it comes to concrete frames and therefore choose to work with something they are experienced with. However, there is an increased interest and construction players have an understanding that wood will be more common as a frame in multi-storey buildings in the future.

Page generated in 0.1004 seconds