• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Analys av ”Early Contractor Involvement” (ECI) : Att i byggprojektens tidiga skeden involvera entreprenören

Pizzoni, David January 2021 (has links)
Att nå effektivitet, en bra kostnadsbild och hantera den växande frågan gällande minskad belastning på miljön är viktiga delar i dagens byggprojekt. Att välja totalentreprenad som entreprenadform kan vara ett sätt att nå detta. För att bland annat hantera brister med denna entreprenadform kan man istället använda sig utav den relativt nya metoden ECI (Early Contractor Involvement). Metoden bygger på att få tillgång till entreprenörens kunskap tidigt och att gemensamt kunna angripa de utmaningar projektet står inför. Detta ställer höga krav på relationen mellan parterna. Syftet med denna studie uppnås först genom att visa att tidigare studier konstaterar att ECI bidrar gällande aspekterna effektivitet, kostnadsbild och i viss mån även till miljö- och hållbarhetsarbete, att fördelsfaktorerna överträffar nackdelsfaktorerna och att metoden är att föredra kontra en traditionell totalentreprenad. Sedan genom en surveystudie med en webbaserad enkätundersökning hos beställare, entreprenörer och projektörer/byggledare på en SME-byggentreprenörs (små och medelstora företag) marknad baserad i Stockholm. Här erhölls information om att ECI i det stora hela bidrar väldigt väl i aspekter kopplade till effektivitet och kostnadsbild och väl gällande miljö- och hållbarhetsfrågor kontra en traditionell totalentreprenad. Även information om att fördelsfaktorerna överträffar nackdelsfaktorerna på marknaden erhölls här, vilket stämmer överens med tidigare studier. Det kunde även konstateras att relationsbaserade faktorer är oerhört viktiga i ECI. Implementeringen och skapandet av ett gemensamt engagemang med tydliga ramar framhävs i de rekommendationer för ECI som lämnas i slutet. / Achieving efficiency, a satisfactory project cost and dealing with the growing issue of reduced impact on the environment are important parts of today's construction projects. Choosing design and build contract (D&B) in your project can be a way to achieve this. A way to manage shortcomings with this form of contract, you can instead use the relatively new method ECI (Early Contractor Involvement). The method is based on gaining access to the entrepreneur's knowledge early on and being able to jointly tackle the challenges the project faces. This places high demands on the relationship between the parties. The purpose of this study is first achieved by showing that previous studies state that ECI contributes in terms of efficiency, project cost and to some extent also to environmental and sustainability work, that the benefit factors outweigh the disadvantage factors and that the method is preferable to a traditional D&B-contract. Then through a survey study with a web-based survey of clients, contractors and designers/construction managers at a SME-construction company’s market (Small and Medium Enterprises) based in Stockholm. Here, information was obtained that ECI, overall, contributes very well in aspects related to efficiency and project cost and well regarded environmental and sustainability issues versus a traditional D&B-contract. Information showed that the advantage factors exceed the disadvantage factors on the market, which is then consistent with previous studies. It could also be stated that relationship-based factors are extremely important in ECI. The implementation and creation of a joint commitment with a clear framework is emphasized in the recommendations for ECI that are provided at the end.

Page generated in 0.6277 seconds