• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 4
  • Tagged with
  • 4
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

TREDIMENSIONELL RELATIONSHANDLING FÖR BEFINTLIG BYGGNAD

Larsson, Nils, Jödahl, Caroline January 2007 (has links)
<p>En om- eller tillbyggnad av en byggnad kräver ofta att befintliga ritningar värderas med avseende på aktualitet och geometri. Ritningarna kan förekomma i form av 2D-ritningar eller som ett digitalt underlag. När ritningarna undersöks kan resultatet bli att dessa kräver en komplettering för att få ett relevant projekteringsunderlag eller en så kallad relationshandling. Befintliga ritningar kan ibland helt saknas och det krävs att nya relationshandlingar upprättas. I de fall där en osäkerhet finns om byggnadens geometri, genomförs en inmätning för att få en måttriktig relationshandling. Inmätningen kräver att mätdata efterbearbetas i CAD för att skapa en digital modell av byggnaden. Modellen utgör en relationshandling som kan användas av konsulter i projekteringsarbetet för den planerade ändringen av byggnaden. I allt fler projekteringsarbeten efterfrågas relationshandlingar där höjdinformation tillsammans med plankoordinater genererar så kallade 3D-relationshandlingar.</p><p>Syftet med detta examensarbete på C-nivå (10 poäng) har varit att i någon omfattning genomföra samtliga delmoment i upprättandet av en 3D-relationshandling. Inmätningen genomfördes med tre olika instrument: handhållen avståndsmätare, totalstation och laserskanner.Resultatet av bearbetning i CAD visar att modellering av mätdata från totalstationen och laserskannern ger ritningar som stämmer bättre överens med de faktiska förhållandena än de ritningar som generas från mätning med den handhållna avståndsmätaren.</p> / <p>Before the processes of rebuilding an existing building commence an evaluation of the existing drawings have to be done. Existing drawings can be either 2D-paper drawings or in a digital format. When evaluating the existing drawings one might find that these needs to be updated to serve as reference of basic data for the projection of the new building. A new 3D model has to be made. In some cases, there exist no drawings at all for an existing building that are to be reconstructed. The existing drawings can be found to have a deficiency with respect to geometry that calls for a survey of the building i.e. an as-built survey. The result of the as-built survey will need to be calculated and exported to CAD software for modelling. A digital model of the existing building is created in the CAD environment to. More of today’s work with basic data and the creation of digital models require height information in conjunction with the x, y coordinates in the purpose of creating a true 3D computer-based model.</p><p>The intentions of this thesis (C-level) have been to carry through all the parts needed in establishing a 3D computer-based model. The surveying was done in three different ways: with the use of a hand held laser distance meter, with a total station and finally, a scan was done using a laser scanner. A comparison and analysis using the three different methods where done. The result shows that the used methods can be useful by themselves or in conjunction with each other.</p>
2

TREDIMENSIONELL RELATIONSHANDLING FÖR BEFINTLIG BYGGNAD

Larsson, Nils, Jödahl, Caroline January 2007 (has links)
En om- eller tillbyggnad av en byggnad kräver ofta att befintliga ritningar värderas med avseende på aktualitet och geometri. Ritningarna kan förekomma i form av 2D-ritningar eller som ett digitalt underlag. När ritningarna undersöks kan resultatet bli att dessa kräver en komplettering för att få ett relevant projekteringsunderlag eller en så kallad relationshandling. Befintliga ritningar kan ibland helt saknas och det krävs att nya relationshandlingar upprättas. I de fall där en osäkerhet finns om byggnadens geometri, genomförs en inmätning för att få en måttriktig relationshandling. Inmätningen kräver att mätdata efterbearbetas i CAD för att skapa en digital modell av byggnaden. Modellen utgör en relationshandling som kan användas av konsulter i projekteringsarbetet för den planerade ändringen av byggnaden. I allt fler projekteringsarbeten efterfrågas relationshandlingar där höjdinformation tillsammans med plankoordinater genererar så kallade 3D-relationshandlingar. Syftet med detta examensarbete på C-nivå (10 poäng) har varit att i någon omfattning genomföra samtliga delmoment i upprättandet av en 3D-relationshandling. Inmätningen genomfördes med tre olika instrument: handhållen avståndsmätare, totalstation och laserskanner.Resultatet av bearbetning i CAD visar att modellering av mätdata från totalstationen och laserskannern ger ritningar som stämmer bättre överens med de faktiska förhållandena än de ritningar som generas från mätning med den handhållna avståndsmätaren. / Before the processes of rebuilding an existing building commence an evaluation of the existing drawings have to be done. Existing drawings can be either 2D-paper drawings or in a digital format. When evaluating the existing drawings one might find that these needs to be updated to serve as reference of basic data for the projection of the new building. A new 3D model has to be made. In some cases, there exist no drawings at all for an existing building that are to be reconstructed. The existing drawings can be found to have a deficiency with respect to geometry that calls for a survey of the building i.e. an as-built survey. The result of the as-built survey will need to be calculated and exported to CAD software for modelling. A digital model of the existing building is created in the CAD environment to. More of today’s work with basic data and the creation of digital models require height information in conjunction with the x, y coordinates in the purpose of creating a true 3D computer-based model. The intentions of this thesis (C-level) have been to carry through all the parts needed in establishing a 3D computer-based model. The surveying was done in three different ways: with the use of a hand held laser distance meter, with a total station and finally, a scan was done using a laser scanner. A comparison and analysis using the three different methods where done. The result shows that the used methods can be useful by themselves or in conjunction with each other.
3

Avvikelser vid projektering av installation och inredning i kök : En analys av uppkomna avvikelser vid planering, projektering och produktion av köksinredning och vitvaror i nyproduktion av bostäder / Deviations when designing installation and furnishing in kitchens : An analysis of deviations that occur during planing, designing and production of kitchen furnishing and appliances in construction of new housing

Sandin, Theodor, Forsmark, Viktor January 2022 (has links)
Inom byggsektor orsakar fel, skador och brister extrakostnader på mellan 83 och 111 miljarder kronor varje år. De kostnaderna grundar sig ofta i fel som kan ses som små och därmed lätta att åtgärda på plats, men som när de adderas ihop innebär stora konsekvenser. Kök är ett område med en stor mängd avvikelser, då alla olika discipliner ska få plats med sin installation och inredning i ett litet utrymme. Det gör att kraven för kommunikation och samordning är extra höga i just kök. Syftet med detta arbete var att undersöka och sammanfatta vilka som är de vanligaste återkommande avvikelserna i kök, förstå vad som orsakar dem, och till sist föreslå åtgärder för att kunna minska mängden avvikelser som uppstår. Genom en intervju- och en enkätstudie kunde en sammanställning göras där felaktigt placerade eluttag var det ensamt vanligast förekommande avvikelsen, följt av måttfel, passbitar som inte stämmer, samt inredning och installation som inte passar. Orsakerna till de avvikelserna lyckades hittas genom samma studier och sammanfattas till dålig kommunikation mellan projektörer, att projektörerna saknar kunskap av varandras områden, samt att samordningen av de olika disciplinerna ofta brister. Med grund i de orsaker till avvikelser som uppdagats presenteras flera förslag på åtgärder med syfte att undvika återkommande avvikelser. De rekommendationer som studien kommer fram till är att en frågemall med frågor som projektörerna måste fråga varandra i början av projektering, att någon ska utses som ansvarig för erfarenhetsåterföring, samt att köksleverantörerna ska leverera sina ritningar i IFC-format. Med de åtgärderna implementerade hoppas författarna att företag ska kunna minska mängden återkommande avvikelser i framtida projekt. / Within the construction sector, defects, damages and errors lead to extra costs of between 83 and 111 billion Swedish kronor each year. These deviations are often based on deviations that may seem small, and therefore easy to solve on the site, but when they are added together amount to large consequences. Kitchens are an area with a large amount of deviations, because all different disciplines have to fit their installation and furnishing into a small space. That means that the requirements on communication and coordination are extra high. The purpose of this study is to identify and summarize which deviations are most commonly recurring in kitchens, understand what causes them, and finally suggest measures to reduce the amount of deviations in future projects.  A compilation could be made by carrying through an interview and a survey study, in which incorrectly placed outlets was found to be the most common deviation, followed by measurement errors, missing filler moulding, as well as furnishing or installation that doesn't fit. The reasons behind these deviations were found through the same studies and summarized to lacking communication between projectors, that projectors lack knowledge of each other's areas, and that the coordination often fails. Based on the reasons behind deviations that were found, multiple suggestions for measures to minimize recurring deviations are presented. The recommendations that the study presents is to create a question template containing questions that the projectors have to ask each other at the start of every project, to appoint someone the responsibility to carry out experience retrieval, as well as having the kitchen suppliers deliver their drawings in IFC-format. By implementing these measures, the authors hope that construction companies will be able to reduce the amount of recurring deviations in future projects.
4

Skiljer sig energiberäkningarna i projekteringsstadiet från energiberäkningarna i relationshandlingarna?

Ingarsson, Ellen, Sköld, Ellen January 2022 (has links)
To reduce the emissions from energy use, high demands are set on new buildings. Studies have shown big differences between predicted and actual energy performance. This gap makes it more difficult to reduce the energy use in buildings. The aim of this study is to discover if deviations occur before the building is put into use, and if it does, discuss the reasons for that.  In this study, energy performance for 20 multi-family houses have been compared between the early design stage and the production stage. The result of this study is that there are no major differences in energy use between the different documents. On the other hand, there are big differences in some of the parameters that the energy use is dependent on. The reasons of this are discussed later in this thesis. None of the investigated buildings had the same value of energy performance in the production stage as in the early stage. The parameter that has shown the greatest difference is space heating and hot water recirculation. The biggest correlation was found between the energy required by the fans and the buildings total energy use.

Page generated in 0.1031 seconds