• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 704
  • 26
  • 9
  • 8
  • Tagged with
  • 747
  • 650
  • 497
  • 463
  • 357
  • 282
  • 194
  • 155
  • 122
  • 103
  • 102
  • 100
  • 98
  • 97
  • 91
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
111

Analýza rizik v managementu projektů / Risks Analysis in Project Management

Paulenda, Ján January 2011 (has links)
The main subject of this Master's thesis is risk management with emphasis on risk analysis stage. All important stages, definitions and techniques are introduced in the context of risk management. There are several risk analysis methods discussed in this thesis, especially the Markov analysis and the Petri net analysis. After the thorough analysis of the subject, the system to support the risk management was designed and implemented, while precisely Markov analysis was chosen.
112

Řízení rizik u vybraného podnikatelského subjektu / Risk Management of the Company

Zavadil, Jaroslav Unknown Date (has links)
The diploma thesis titled „Risk Management of the Company“ deals with risk management of selected process, analyzing and optimizing risk in purpose to reduce the risk in the company TIZZI KM, spol. s r.o. The first part is focused on explanation of the relevant therms for better understanding. This part describes basic therms and methods of risk management. The second part is focused on the analysis of the current situation and analysis of the risks that have been identified based on the selected proces of the change. The final part is focused on proposed recommendations and measures that will minimize the risks in the company.
113

Řízení rizik projektu ve vybrané společnosti / Project Risk Management for Selected Company

Bendová, Veronika January 2016 (has links)
This diploma thesis is dealing with risk management application to specific project of production implementation in confectionary business, analyzing possible risks and suggesting needed corrections. The analysis of the current situation was created to help to reach the main goal. There was analysis of micro environment and macro environment followed by SWOT analysis which shows strengths, weaknesses, opportunities and threats. Special methods of project management were used, RIPRAN method for risk management. Based on previous analysis there is suggestion of possible needed corrections for the project.
114

Zhodnocení rizik v mezinárodním obchodování společnosti První Kompozitní s.r.o. / Risk Evaluation of International Trading of the Company First Composite s.r.o.

Šácha, Marek January 2016 (has links)
The Diploma thesis deals with the analysis of the risks that may arise in international trading. The aim of this work is on the basic of the identified analyses to design appropriate measures to eliminace the risk. In the theoretical part are described theoretical insights on international trading and concepts from the field of risk management. In the practical part comes to the performance of the enterprise and business areas. Furthermore, here we find assessment of the current situation of the company, containing an analysis of the external and internal enviroment. The results will be drawn up a risk analysis method RIPRANTN. The last part of the diploma thesis is a proposal for measures to eliminace risk.
115

Modelování a simulace rizik veřejných investičních projektů / Modeling and simulation of public investment project risk

Pavelková, Martina January 2015 (has links)
The results of the investment projects are dependent on the quality of project preparation in the pre-investment stage and well-executed implementation. High-quality preparation of the projects, their evaluation and selection of require key risk factors and uncertainties, the impact of these factors on the results of the project and consider measures on their elimination or reduction. The purpose of the risk management of the project is therefore in advance to know the sources of possible threats to the project and to prepare measures that would lead to a reduction in the potential impacts for the project to an acceptable value. The basic aim of project risks management is then increase the likelihood of their success and to minimize the risk of such failure, including their rejection of the venture project too, which could threaten the financial stability of the investor and lead to its decline. The thesis is focused on the examination of the different approaches to identification of risks and uncertainties and their subsequent evaluation on investment project of public corporations, including the impact of the preparation of the project on its own implementation and subsequent operation. At the same time they recommended possible measures to reduce the risk of this project in terms of their costs and the size of the risk reduction. Part of the work is also an analysis of the risks and benefits of the projects planned, realized and terminated by The South Moravian Region and the draft Project Risk Register and the Project Opportunities Register, where appropriate, the risk management process for The Regional Authority of The South Moravian Region.
116

Návrh na zavedení metodiky řízení projektu do firmy / Proposal of the Implementation of the Project Management Methodology into the Company

Vojta, Lubomír January 2015 (has links)
This diploma theses deals with the challenges of a project management in a particular construction company that handles projects on daily basis. I focused on the analysis of a particular project in this company, that has been successfully implemented. This analysis served as a starting point for the designing of the changes, as well as a devising a tool that simplifies the set up of the changes into practice. Selected problem was solved by comparing the project management methodology in the project with the project management practices officially proposed in the literature. Tool design was carried out in the environment of Microsoft Excel. I managed to design a tool in which the shortcomings are treated the way that facilitates their implementation into practice, especially by using an easy environment and outputs well-arranged for the user. This tool is therefore mainly used to eliminate the identified shortcomings and thus to facilitate and simplify project management in practice.
117

Řízení rizik ve stavebním podniku / Risk Management inside Construction Company

Štrbavý, Lukáš January 2022 (has links)
The aim of the diploma thesis is to describe risk management in a construction company. The first part of the diploma thesis is focused on theory, which deals with the explanation of basic concepts with risks and risk management in a construction company. The second, practical part addresses the risks of a specific project.
118

Řízení rizik ve stavebním podniku / Risk Management inside Construction Company

Titzová, Eva Unknown Date (has links)
The thesis aims to describe risk management in the construction company. The work is divided into theoretical and practical part. The theoretical part presenst the classification of risks, describes the various stages of this complex process, including methods and techniques. The practical part is solved on a particular project, it summarises and completes the whole issue of risk.
119

Posouzení efektivnosti a rizik projektu realizovaného obcí / Evaluation of Efficiency and Risk of Municipal Project

Křemečková, Denisa January 2019 (has links)
The diploma thesis is focused on evalution of efficiency and risks of the project implemnted by the municipality. The theoretical part defines the issue of building investments, public project, and indicators of economic efficiency of investments. Risk analysis is described here. The practical part is focused on the economic evaluation of the effectiveness and risk analysis of the project implemented by the municipality.
120

Hodnocení technického stavu a posouzení rizik vodojemů / Technical Audit and Risk Assessment of Water Tanks

Tanistrová, Lucie January 2020 (has links)
The diploma thesis is primarily focused on risk analysis and risk assessment of drinking water supply systems. In the research, the issues of risk analysis and risk assessment considering world and Czech Republic, were summarized. Software WaterRisk, which was developed by BUT Brno, was used for risk assessment of a particular water supply system in Třebom. Next, the thesis is aimed on technical audit of water tanks. There was a research of technical audit in the world and in the Czech Republic. Also assessment of technical audit of a particular water tank, which had to be anonymized, using software TEAwater is described in detail. Two conditions were considered: before and after reconstruction.

Page generated in 0.0361 seconds