• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Riskanalys med avseende på arbetssättet K1

Johansson, David, Dahlström, Alexandra January 2017 (has links)
The construction industry is in third place concerning the number of yearly accidents and in secondplace concerning accidents with deadly outcomes in Sweden according to statistics (Arbetsmiljöverket2017a). This is an issue that Skanska, NCC, PEAB, Sveriges Byggindustrier and Byggnads isdetermined to work on to improve. A work procedure to identify and address safety risks during theplanning- and projection phase of a construction project has been developed with support from SBUF(Holm, Lidgren, Montecinos 2013). The work procedure is designed to first identify the safety risksthat is present for the current project with the help from a checklist. Then if the risks can’t beeliminated in the projection phase the risk will be highlighted on the construction drawings. A problemthat was discovered during the implementation of the work procedure in a construction project wasthat too many and not relevant risks was highlighted on the construction drawings. The purpose ofthis report is to produce underlying instructions to the planners of the construction project so thatthey can make use of the work procedure in the most appropriate manner. This report is written bystudents from Högskolan I Halmstad in co-operation with Skanska Teknik in Gothenburg. This reportis limited to new office and housing construction projects.To produce a result, we have conducted two comprehensive interviews as well as surveys answered byproduction managers. These interviews and surveys led to the conclusion that for the work procedureto succeed it’s important to have a good composition in the group that will work together with thechecklist and the identification of safety risks. The group is recommended to be composed of planners,project managers, safety representatives and if possible experienced workers. Another important aspectto make the work procedure successful is to make the checklist reflect the conditions of theconstruction projects that are being processed. Two construction project is almost never the sameconditions which doesn’t lend itself well to making a work procedure that handles all different casesof projects. The results also reveal that construction engineers and planners lack knowledge andeducation concerning work environment on construction sites. The results we have produced will alsohelp planners of construction projects that will use this specific work procedure to know which of thesafety risks are relevant to be highlighted on the construction drawings. We have also proposed someareas that needs more researched to make the work procedure more complete. / Byggbranschen ligger på tredje plats i statistiken över mest olyckor per år och på andra plats gällandeolyckor med dödlig utgång i Sverige (Arbetsmiljöverket 2017a). Detta är något som Skanska, NCC,PEAB, Sveriges Byggindustrier och Byggnads anser måste förbättras. Ett arbetssätt för att identifieraoch projektera bort risker under projekteringen av ett byggprojekt togs fram i samarbete med SBUF(Holm, Lidgren, Montecinos 2013).Arbetssättet går ut på att identifiera säkerhetsrisker med hjälp av en checklista, för att sedan markeraut identifierade risker på arbetsritningarna. Ett problem som upptäcktes när arbetssättetimplementerades i projekt var att det var oväsentliga och för många risker som markerades ut påritningarna. Syftet med rapporten är att ta fram ett underlag till projektörer så de kan användaarbetssättet på bästa sätt. Rapporten skrivs på Högskolan i Halmstad i samarbete med Skanska Tekniki Göteborg. Rapporten är avgränsad mot nybyggnation av kontor och bostäder.För att få fram resultatet har det genomförts två omfattande intervjuer samt enkäter medproduktionschefer. Dessa intervjuer och enkäter resulterade i slutsatsen att det är viktigt att ha en brasammansättning på gruppen som ska arbeta med checklistan samt att identifiera säkerhetsriskerna. Detär bra om gruppen har en samansättning på både projektörer, projektledare ochskyddsombud/yrkesarbetare för att komplettera varandra. Det visade sig också att det var viktigt attgöra checklistan projektspecifik. Inget byggprojekt är det andra likt och därför behöver checklistanriktas mot just det projekt som ska genomföras. Det framkommer även i resultaten att projektörerbehöver mer utbildning gällande arbetsmiljö och arbetet i byggproduktionen ute på byggarbetsplatsen.Resultaten kommer att kunna underlätta för projektörer att kunna veta vilka risker som ska sättasut/inte sättas ut på ritningar. Det har även uppkommit fler områden att undersöka djupare för att fåett ännu mer komplett arbetssätt.

Page generated in 0.1369 seconds