Spelling suggestions: "subject:"estava""
41 |
Příprava realizace bytového domu ve Zlíně / CONSTRUCTION AND TECHNOLOGICAL PROJECT OF RESIDENTIAL BUILDING IN ZLINSaňák, Adam January 2015 (has links)
Diploma thesis contains descriptions of technological process of Residential House in Zlín. The project includes a technical report for pills and monolithic constructions, mechanization plans, safety and guality of work, report scheduling and organization of construction.
|
42 |
Stavebně technologický projekt modernizace objektu T8, VUT v Brně / Architectural and technological modernization project object T8, BUTSkokanová, Šárka January 2015 (has links)
The subject of this diploma thesis is the architectural and technological modernization project object T8 the Technical University in Brno. Reconstruction of the partial operation affects investor during reconstruction and access to various floors of the building which is secured by a connecting bridge passing over five floors of the building and articulated halls adjacent buildings. The aim is to design technology solutions, spatio-temporal, financial and legislative aspects, taken on the basis of project documentation.
|
43 |
Stavebně technologický projekt montované haly / Construction technology project - assembled hallOsina, Lukáš January 2015 (has links)
The subject of this diploma thesis is a construction technology project prefabricated tennis hall with facilities in Prostejov. The content of this work are technical regulations, technical reports, project site equipment, design of mechanical assemblies, schedule, budget, monitoring and test plan, work safety and environmental protection.
|
44 |
Stavebně technologický projekt polyfunkčních domů Zlín-Příluky / Construction and technological project of multifunctional buildings in Zlín-PřílukyKužela, Vlastimil January 2016 (has links)
This diploma thesis deals with technological project for the construction of complex of two multifunctional buildings in Zlín-Příluky. Thesis includes technical report, technological rules, plan of controls and testing, machines, safety plan, project of construction site equipment, budget and time schedule.
|
45 |
Stavebně technologický projekt stavebních úprav základní školy s nástavbou a přístavbou / Construction technological project of construction works elementary school with superstructure and outbuildingBureš, Petr January 2016 (has links)
This diploma thesis deals with the construction technological project of construction works elementary school with superstructure and outbuilding. The project is designed to focus on major construction project,which is the superstructure. The diploma thesis contains time and financial plan, study of implementation of the main technological phases, project site equipment, draft machine assembly, itemized budget to rough construction and solution of occupational health and safety at work.
|
46 |
Univerzitní kampus v Brně, příprava realizace stavby / University Campus CRA II, preparing construction managementHavlíčková, Eva January 2016 (has links)
The subjekt of my bachelor thesis is the construction technological project of the new complex of three buildings Campus residential area II located in Brno - Bohunice. The diploma thesis includes technological regulations of piles and cast-in-place reinforced concrete floor. Technological regulations are supplemented by draft of the suitable machinery, equipment of construction site and inspectional and trial plans for these processes. The author also deals with work safety, time and financial plan, budget of substructure and plan for securing material resources. The thesis also addressed work contract and detailsof the roof structure.
|
47 |
Sestava ocelových zásobníků kameniva / Array of Stell Aggregate BinsKrchnák, Martin January 2016 (has links)
This diploma thesis describes the design and assessment of steel structural design of the steel aggregate bins including roofing. The construction has a ground plan of about 33 x 9 m and it is divided into 8 cells bins. Main material is steel, grade S355 and S235. There is developed a static analysis of the main load-bearing parts of the structure, including joints and selected details.
|
48 |
Stavebně technologický projekt integrovaného výjezdového centra Ostrava Dubina / Construction technological project of integrated emergency dispatch centre Ostrava DubinaŠevčík, Tomáš January 2016 (has links)
This diploma thesis deals with construction-technological project of integrated emergency dispatch centre in Ostrava Dubina. In this work I especially deal with dispatch centre. Work included planning study of realization of the main technical stages, technological prescription for precast concrete frame, construction site equipment, time and financial construction plan.
|
49 |
Stavebně technologický projekt přístavby Senior centrum Blansko / Construction Technological Project of the Extension Senior Centrum BlanskoHouha, Jan January 2017 (has links)
Content of this master‘s thesis is construction technological project of the extension Senior Centrum Blansko. The main object is a three-storyed, designed as a monolithic skeleton construction. The masters’s thesis contains technical report of the construction technological project, suggested construction site installations, proposal of suitable machines and mechanisms required for construction, time schedule, budget, wider relations of transport lines to construction site, implementation of monolithic concrete structures and control and test plan.
|
50 |
Výstavba tiskárny v Zašové - stavebně technologický projekt / Construction printer in Zasova - construction technology projectDobiáš, David January 2017 (has links)
The subject of diploma thesis is a detailed building-technological project of construction printer in Zasova. The thesis contains a technical report on the structural and technological project, technical report broader transport relations, including drawings, technical report construction site along with drawings of building equipment, draft mechanical assemblies, technological regulation, inspection and test plan, itemized budget,calculation according THU and the timetable for construction. It also dealt with contract work, environmental protection, safety at work, time and financial plan of the whole building.
|
Page generated in 0.2747 seconds