• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 210
  • 1
  • Tagged with
  • 211
  • 193
  • 178
  • 176
  • 172
  • 168
  • 159
  • 158
  • 156
  • 154
  • 154
  • 152
  • 145
  • 139
  • 127
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
61

Skladovací hala Dvořisko - stavebně technologický projekt / Storage hall in Dvořisko - construction technoly project

Bříza, Lukáš January 2018 (has links)
The subject of my thesis are selected parts of construction technology project of Construction of the Storage hall in Dvořisko, Choceň. This thesis solves technological regulation for monolithic construction, technological report site equipment, suitable choice of construction machinery, timetables, inspection and test plan, occupational safety and dealing with traffic routes.
62

Bytový dům Ivančice - stavebně technologický projekt / Apartment building in Ivančice - construction technology project

Fejfar, Michal January 2018 (has links)
The subject of the master´s thesis technological project of the Ivančice residential building in Ivančice. The building has one underground and four aboveground floors. The master´s thesis contains a technical report for the building technology project, broader transport routes, a timetable, a financial plan, time schedule, design of construction site installations, design of mechanical assemblies, technological prescription for construction of celling white tank, inspection and test plan, crane and design.
63

Stavebně technologický projekt mateřské školy / Building technological project nursery school

Alexa, Martin January 2018 (has links)
This thesis handles the construction and technological project of nursery school in the Brno. It deals with technical reports, technological methods of construction. The report contains technical reporst of building equipment, schedule, design of mechanical assembly, inspection and health and safety at work.
64

Stavebně technologický projekt rekonstrukce operačních sálů KPRCH Fakultní nemocnice Brno / Architectural and technological project of reconstruction surgeries KPRCH University Hospital Brno

Hačka, Martin January 2018 (has links)
The aim of this work is to prepare the implementation of the reconstruction and extension of the Teaching hospital Brno Bohunice. Implementation of major technological stages is addressed in building technological study. Work includes selected legal procedures before the start of construction work, such as opening the envelopes and investor-supplier contract for the work. Further work solution contains selected technological processes of each sub-job phases, complemented by technological regulations, proposals for major construction machinery, selected inspection and test plans. As part of my work I will work with subcontractors to perform CFA piles, so I deal with on demand system for subcontractors, notice of award, issuing orders and delivery site for subcontractors. I believe that the subject of occupational health and safety on the jobsite is an important chapter construction and will therefore address the safety and health of people at work drawing up a plan OHS and OHS coordination meetings. Work will also be supplemented by information site equipment, time and financial plans and drawings of all the individual components specified in the Annexes. The content of my work is also a doctoral student competition entitled "Modern technologies and materials", where thoughts about the implementation superaseptických surgeries new technologies. This work will be the content of the text section of the attachments, always mentioned with the name of specialization.
65

Bytový dům "Za Pivovarem" Lázně Bohdaneč - stavebně technologický projekt / Construction Project - Apartment Building "Za Pivovarem" Lázně Bohdaneč

Volf, Miroslav January 2018 (has links)
The aim of this diploma thesis is to process a building construction project for the apartment building “Za Pivovarem” in Lázně Bohdaneč. The building is designed as a four-floor object which has a flat roof, 24 apartments, 24 cellars, 10 garage stalls, 3 terraces that belong to the apartments on the 1st floor and enclosed balconies or balconies for the apartments in the above floors. The thesis focuses on the organization and preparation of the construction process. It contains a technological project for the cast-in-place reinforced concrete floors, which includes also drawings of formwork, a technical-economic balance sheet of the formwork costs and a calculation of the time for formwork removal, a technological project for anhydrite floors and inspection and test plans for both of the above mentioned building procedures, which are dealt with in a more detailed way. The implementation of other construction procedures is described in the preliminary design of implementation. Concerning the work safety, the plan of health and safety at work, focusing on work at heights and other dangers connected to work on the floor constructions, has been processed. Furthermore, there is a time and finance schedule for the whole construction, a construction site project, a set of main machines and mechanisms which includes a comparison of a mobile crane and a tower crane. In addition, broader transport relations have been assessed. The thesis also contains an instruction manual on the main object.
66

Novostavba administrativního objektu v Karviné, stavebně technologický projekt / New Administrative Building in Karviná, Construction Technological Project

Toman, Marek January 2018 (has links)
The diploma thesis deals with preparation, organization and construction technology of an administrative building in Karviná. It is about new building with four above ground floor. From a design point of view, the structure is designed as a precast concrete frame. The diploma thesis contains technical report, coordinating situation with design of transport ways, time financial plan, study of the implementation of the main technological phases, concept of construction site equipment, design of machinery set, time plan with worker bilancion, material delivery plan for rough building, technical report for masonry work, inspection and test plan for masonry work, item budget with the statement of measurements and noice study for earthworks.
67

Víceúčelový objekt v Lužici - stavebně technologický projekt / Execution of Multifunctional Building in Lužice - Building Construction Project

Mouka, Jiří January 2018 (has links)
The diploma thesis deals with the solution of the multi-purpose building project in Lužice. This work includes the extended accompanying and summary technical report, the coordination situation of the construction, the technical report of the transport relations and the coordination of the oversized transport, the object time schedule and the financial plan of the construction, the plan for providing the material resources containing the staff balance for the construction of the main building, the time schedule for the assembly of the prefabricated skeleton, technological standard for prefabricated skeleton, design of main building machines and mechanisms including their time commitment, organization of construction of multipurpose building including drawings of construction site equipment, technological regulation for assembling of prefabricated skeleton and for making of reinforced concrete floor, inspection and testing plan for prefabricated skeleton assembly, lifting mechanism, assembly schemes for prefabricated skeleton elements, lifting mechanism verification schemes, item budget prefabricated skeleton chalk and instructions for building use and maintenance.
68

Stavebně technologický projekt železobetonové monolitické haly / Constructive technological project of reinforced concrete monolithic hall

Hubáček, Lukáš January 2018 (has links)
This diploma thesis deals with the construction and technological project of the reinforced concrete monolithic hall for Dinel s.r.o., which has its seat in the industrial zone Zlín - Příluky. There are prepared a technical report for the construction project, time and financial plan of the construction of the second stage, a study of the implementation of the main technological stages, a project of the building facility, a design of the main building machines and mechanisms, a schedule of the main building including a plan of the material resources and technological regulations of selected stages together with control and test plans. In addition there is prepared a budget item of the main building, the health and safety plan and a problematics of the antistatic floors.
69

Projekt přípravy a realizace výrobní a skladovací haly v Mniší / Execution of Production and Storage Hall in Mniší

Šilhová, Kristýna January 2018 (has links)
The diploma thesis deals with the realization of a production and storage hall for the engineering industry. Part of the realization of the production hall is the demolition work of the existing agricultural building. The reconstruction of the existing premises of locksmith's workshop and dressing room for employees is also being implemented. For the preparation of this project, the thesis deals with the implementation of the main technological stages, technological plans for demolition work and substructure, transport routes of the main building materials and machines, technical report of the building site, time and financial plan of the construction, security measures especially for demolition works, quality control when drilling a pilot.
70

Stavebně technologický projekt rezidenčního domu v Brně / Building and technological project of a residential house in Brno

Podškubka, Martin January 2018 (has links)
The subject of this Diploma thesis is building and technological project of a residential house in Brno, which contain the implementation of the underground car park and residential building, which has three above-ground floors. Attention is focused mainly on the technological processes of bottom building. Text section contains the technical report on the structural and technological project, study implementation of major technological stages of building, technical report of construction site equipment, technological regulations, inspection and test plan, study of noise, plan health and safety at work, the design of the main building machines and mechanisms including transport routes. The attachment section contain time and financial plan construction-object, time deployment of machines, plan of material resources, time schedule, technology standard, budget, drawings of construction site equipment, verification of tower crane construction and schema of processes concreting.

Page generated in 0.0507 seconds