Spelling suggestions: "subject:"estava""
81 |
Příprava a realizace sídla společnosti POLNA corp. s.r.o. v Třinci / Implementation of Registred Office of Company POLNA corp. s.r.o. in TřinecŠpilínek, Richard January 2019 (has links)
This master´s thesis deals with construction-technological project of administrative-production and storage complex in Třinec - Oldřichovice. It´s a new building of the main building, consisting of a two-storey administrative building and a one-storey storage hall, which is complemented by other sub-objects. The master´s thesis solves the realization of the building as a complex whole and in more detail focuses on vertical and horizontal supporting structures, made of steel elements and steel-concrete ceiling structure. An integral part of the project include studies of the realization of the main technological stages of the main building, technological regulations, complemented by assembly schemes, solution of transport routes and proposal of machine assemblies, site equipment design, time schedules, budgets, inspection and test plans and proposal of security measures for selected risks. The work is further supplemented by a specialized area that prepares the design and execution of intra-areal reinforced communications.
|
82 |
Biology park Brno, stavebně technologická příprava stavby. / Bilogy park Brno, Civil technical projectKroutil, Karel January 2019 (has links)
The diploma thesis deals with construction technological project of a Biology park Brno. The thesis contains time and financial plan, itemized budget of main object, technical report, site equipment, safety and healt care policy and machine assembly, noise study, environment . The thesis focuses on building waterproof concrete construction and reinforced concrete monolithic structures. Thesis includes technological prescription and control and test plan for mentioned constructional phases.
|
83 |
Příprava a organizace výstavby skladovací haly ELIT v Brně / Preparation and organization of ELIT warehouse building in BrnoBoháček, Adam January 2019 (has links)
The subject of my diploma thesis is the design of realization of the Elit storage hall in Brno based on the provided project documentation. Part of the thesis is a technical report for a building technology project, a study of the realization of the main technological stages of the building, the situation of the building with wider transport route links, the project of the building site including the technical report of the construction site equipment, the design of the main building machines and mechanisms. Further part of this work are a chapters on the implementation of the supporting structure of the halls, which are the Technological Regulation for the assembly of the prefabricated reinforced concrete skeleton, The Plan for securing the material resources for the assembly of the prefabricated reinforced concrete skeleton and The Assessment of the usability of the mobile cranes for mounting the prefabricated reinforced concrete skeleton. Part of this work is also a variant solution for the implementation of the Densitop MT industrial floor including a price comparison comparison with the original design. From the time and financial point of view, the object time and financial plan is elaborated, followed by the detailed schedule of the main building construction and the itemized budget of the main building, including the bill of quantities. Due to the high demands on the quality and safety of the construction, the chapters of the Quality Control and Testing Plan for Reinforcing the Prefabricated Reinforced Skeleton and the Plan for Safety and Health at Work on the building site are also included.
|
84 |
StavebnÄ technologick projekt pstavby vrobn haly / Construction-technological project of the extension of the production hallM©zl, Petr January 2019 (has links)
This diploma thesis deals with the construction and technological project of the extension of the production hall Granitol a.s. in Moravian Beroun. The thesis focuses on the technological stage of assembly of the prefabricated skeleton of the rough top structure and the laying of the floor formation. In addition, an extended accompanying and summary technical report, a technical report on transport relations and coordination of oversized transport, a time and financial plan for the construction, a budget for the prefabricated skeleton, a timetable and the balance of the workers, the design of the main construction machines and mechanisms, including their time commitment , organization of the construction of the building including drawings of the construction site equipment, technological regulation for the assembly of the prefabricated skeleton and the laying of the floor formation, inspection and testing plan for the prefabricated skeleton assembly, summary assessment of the lifting mechanism selection, schematic of the assembly procedure of the prefabricated skeleton elements, protection and health at work during construction.
|
85 |
Příprava a realizace výstavby výrobní haly s administrativou / Preparation and realization of the construction of a production hall with administrationHesková, Veronika January 2019 (has links)
This diploma thesis solves the construction and technological preparation of the production hall with administration building for company Mont-Tech localized in Brno. The following documents are processed for the project. These are: technical report, coordination situation with wider transport route relationships, time and financial plan for construction, study of the implementation of the main technological stages, design of site facilities, proposal of the main building machines and mechanisms, technological regulations and related control and testing plans. In addition were prepared – the itemized budget of the main buildings, the plan of safety and health protection and construction details.
|
86 |
Stavebně technologický projekt bytového domu ve Frýdku / Construction technology project of residential building in FrýdekJurečka, Matěj January 2019 (has links)
The subject of this diploma thesis is a construction technology project of a residential building in Frýdek. It is a residential building with four floors and a basement situated in Frýdek – Místek. The content of the preparation of technical reports for the construction and technological project studies and implementation of major technological stages. Creating a time and financial plan for a solved object. Further elaboration of technological regulations for drilled piles and reinforced concrete ceiling structure. A control and test plan is also being developed for these constructions. There is also a project site facility design and a machine assembly and a main lifting mechanism along with the occupational safety and health solution. In addition, the construction site is solved in connection with the transport routes. The thesis is designed with respect to the economic and time aspect.
|
87 |
Bytový dům, Brno ulice Bělohorská. Stavebně technologická příprava stavby. / Apartment building, Brno Bělohorsk street.Civil technical projectDivácký, Petr January 2019 (has links)
The subject of this diploma thesis is construction-technological preparation of a residential building in Julianov. It includes a technical report on building structures, a construction technology study, a technological prescription, a control and test plan, a site equipment design, a design of a machine set, an item budget, a timetable, and a design for the implementation of paved areas.
|
88 |
Příprava realizace železobetonové skladovací haly v Poličce / Preparation for realization of reinforced concrete storage hall in PoličkaZelinková, Marta January 2019 (has links)
The aim of this diploma thesis is the design of an effective construction-technological project for the construction of reinforced concrete prefabricated storage halls and halls of Ravensburger Karton s.r.o.. The solution of the chosen problem is the design of the building site equipment, the verification of the transport routes, the assembly schemes, the technological regulation and the control and test plan for the precast reinforced concrete frame, the BOZP plan, the budget item and the schedule of the main building, timetable, calculation timetable and environmental aspects of the construction.
|
89 |
Výstavba výrobní haly Lavimont - stavebně technologický projekt / Construction of the Lavimont production hall - building technology projectMáčal, Filip January 2019 (has links)
The aim of this diploma thesis is a construction-technological project of the Lavimont production hall in Brno Tuřany. The thesis deals with solution of off-road transport, supply, design of main building machines and mechanisms, ensuring safety and protection of health at work, ecology and environmental protection. The thesis also deals with the optimal construction of site equipment, pumping of resources during construction and solves the total time demands of the construction of this hall. Part of the diploma thesis is also solving the problems related to construction procedures, including the elaboration of a technological regulation and examples of the use of BIM technology in the construction process.
|
90 |
Stavebně technologický projekt skladovací haly ve Zlíně / Construction Project - Implementation of Storage Hall in ZlínVoráčová, Tereza January 2019 (has links)
The final thesis is focused on the solution of the building technology project of storage hall in Zlín. This master’s thesis includes engineering report, studies of major technological stages, solution of transport routes, project of site equipment, design of major machines and mechanisms, technological regulations for steel hall and steel fibre reinforced concrete floor, time schedule, control and test plans for steel hall and steel fibre reinforced concrete floor, budget, time and financial plan, assembly schemes for steel hall and floor assembly.
|
Page generated in 0.0403 seconds