• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 23
  • Tagged with
  • 25
  • 25
  • 25
  • 9
  • 9
  • 8
  • 8
  • 8
  • 7
  • 6
  • 6
  • 6
  • 6
  • 5
  • 5
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Sistema integrado para a gestão de ideias, desafios e oportunidades

Freire , Manuel Nuno Figueiredo Babo Barros January 2012 (has links)
Tese de mestrado integrado. Engenharia Electrotécnica e de Computadores. Faculdade de Engenharia. Universidade do Porto. 2012
2

Avaliação de um sistema integrado de gestão : um estudo na indústria automotiva

Corrêa, Altair Adolphs January 2004 (has links)
Resumo não disponível.
3

Avaliação de um sistema integrado de gestão : um estudo na indústria automotiva

Corrêa, Altair Adolphs January 2004 (has links)
Resumo não disponível.
4

Avaliação de um sistema integrado de gestão : um estudo na indústria automotiva

Corrêa, Altair Adolphs January 2004 (has links)
Resumo não disponível.
5

Estudo da correlação entre normas da Agencia Internacional de Energia Atômica e de mercado sobre sistema de gestão aplicável à operação de planta de conversão de UF6 / CORRELATION STUDY AMONG THE INTERNATIONAL ATOMIC ENERGY AGENCY STANDARDS AND MARKETS STANDARDS ON MANAGEMENT SYSTEM APPLICABLE TO A UF6 CONVERSION PLANT OPERATION

Oliveira, Dirceu Paulo de 29 August 2008 (has links)
A Agência - International Atomic Energy Agency (IAEA), seguindo a tendência de mercado de integração de sistemas de gestão, decidiu rever as normas de Garantia da Qualidade - IAEA 50-C/SG-Q publicando, em 2006, a norma sobre Sistema de Gestão (SG) - IAEA GS-R-3 e sua guia IAEA GS-G-3.1 e está em vias de publicar uma guia suplementar - IAEA DS349, que consideram a integração das várias funções envolvidas na gestão de instalações nucleares, tais como: segurança, saúde, meio ambiente e qualidade, assegurando que a segurança nuclear não seja comprometida. As plantas de conversão de Yellowcake em UF6 utilizam e processam materiais radioativos, bem como outras substâncias normalmente encontradas na indústria química convencional, se inserindo no perfil de organizações que requerem um elevado padrão de definição, implementação e melhoria contínua de seus SG, e que, portanto, devem considerar uma abordagem de sistema integrado de gestão (SIG). Tendo como foco uma planta de conversão de UF6, foi estudada a correlação entre as normas sobre SG da Agência com aquelas de mercado - ISO 9001, ISO 14001 e OHSAS 18001, e com os projetos de normas da Agência - DS316 e DS344, sobre segurança; concluindo-se que, ao se estruturar um SIG de acordo com as normas de SG da Agência, salvo alguns ajustes, estarão sendo atendidas as ISO 9001, ISO 14001 e OHSAS 18001. Por sua vez, a estruturação do SIG deve identificar outros requisitos sobre segurança, saúde e meio ambiente que considerem, também, as características químicas e industriais convencionais da planta, que estão fora do escopo (radiação ionizante) das normas de segurança da Agência. A pesquisa propõe um procedimento documental para um SIG para a planta em questão, fornecendo subsídios para racionalização e conteúdo da documentação identificada, para promoção da integração das funções de SG consideradas. / The Agency - International Atomic Energy Agency (IAEA), following the market trend of the management system integration, has decided to revise the quality assurance standards - IAEA 50-C/SG-Q publishing, in 2006, the standard on Management System (MS) IAEA GS-R-3 and its IAEA GS-G-3.1 guide. Also, the IAEA is about to publish a supplementary guide - IAEA DS349, which consider the integration of several functions involved in management of nuclear facilities, such as: safety, health, environmental and quality, ensuring that nuclear safety is not compromised. Conversion plants of Yellowcake in UF6 use and process radioactive materials, as well as other substances normally found in the chemical conventional industry, inserting themselves in the organization profile that require a high pattern of definition, implementation and continuous improvement of their MS and, therefore, should consider an approach of management integrated system (MIS). Taking a UF6 conversion plant as focus, the correlation was performed among the Agency MS standards and those of the market - ISO 9001, ISO 14001 and OHSAS 18001, as well as with the Agency drafts standards on safety (DS316 and DS344), concluding that, in structuring an MIS, in compliance with the Agency MS standards, except for some adjustments, the ISO 9001, ISO 14001, and OHSAS 18001 are going to be met. On the other hand, the structuring of MIS should identify other requirements on safety, health and environmental, which also consider the conventional chemical and industrial characteristics that are out of the scope (ionizing radiation) of the safety standards of the Agency. The research proposes a documental procedure for a MIS applicable to this plant, providing elements for rationalization and contents of the identified documentation, for the promotion of the integration of the considered MS functions.
6

Licitações públicas : análise de preços praticados nas licitações do governo do Estado do Espírito Santo

Charpinel, Fabio Paiva 28 April 2015 (has links)
Made available in DSpace on 2016-08-29T11:12:20Z (GMT). No. of bitstreams: 1 tese_7431_Dissertação Final - Fabio Charpinel20160107-101424.pdf: 1347678 bytes, checksum: 0bf5a8aee47f91feba234f9f2823ae1c (MD5) Previous issue date: 2015-04-28 / Este trabalho tem o objetivo de estudar os processos licitatórios ocorridos no Governo do Estado do Espírito Santo à partir da implantação do Sistema Integrado de Gestão Administrativa (SIGA). Foi realizado um estudo visando apresentar a forma com que o Poder Executivo da Administração Pública Estadual do Estado do Espírito Santo vem tratando seus processos de compras e contratações. A partir do início da utilização do SIGA, este estudo fez uma análise das licitações verificando sua eficiência em relação à formação de preços no processos licitatórios e os preços vencedores dos certames. Fazendo uma análise comparativa dos preços, podemos perceber que, de forma geral, ainda é muito discrepante o valor estipulado como referência nas licitações e os valores praticados pelos fornecedores. Dessa forma, ficou claro que ainda existe um grande caminho a ser percorrido pela Administração Pública, no sentido de alcançar maior efetividade de suas licitações / This research wants to study the bidding process that happens in the Espirito Santo`s Government after the implantation of the Integrated System of Administrative Management (SIGA). A study was made to show the form that the Espirito Santo`s governance has been treating your process of purchases and contracts. After starts of SIGA this study made a review about the biddings to check the efficiency beside the construction of the prices in the process and the winner`s prices. Making a comparison about the prices is possible to conclude that in the global form is still very different the amount established as reference and the amount made by suppliers. So is clear that still exist a great way to come if the Public Administration wants to achieve a better effectiveness in yours bidding process
7

Estudo da correlação entre normas da Agencia Internacional de Energia Atômica e de mercado sobre sistema de gestão aplicável à operação de planta de conversão de UF6 / CORRELATION STUDY AMONG THE INTERNATIONAL ATOMIC ENERGY AGENCY STANDARDS AND MARKETS STANDARDS ON MANAGEMENT SYSTEM APPLICABLE TO A UF6 CONVERSION PLANT OPERATION

Dirceu Paulo de Oliveira 29 August 2008 (has links)
A Agência - International Atomic Energy Agency (IAEA), seguindo a tendência de mercado de integração de sistemas de gestão, decidiu rever as normas de Garantia da Qualidade - IAEA 50-C/SG-Q publicando, em 2006, a norma sobre Sistema de Gestão (SG) - IAEA GS-R-3 e sua guia IAEA GS-G-3.1 e está em vias de publicar uma guia suplementar - IAEA DS349, que consideram a integração das várias funções envolvidas na gestão de instalações nucleares, tais como: segurança, saúde, meio ambiente e qualidade, assegurando que a segurança nuclear não seja comprometida. As plantas de conversão de Yellowcake em UF6 utilizam e processam materiais radioativos, bem como outras substâncias normalmente encontradas na indústria química convencional, se inserindo no perfil de organizações que requerem um elevado padrão de definição, implementação e melhoria contínua de seus SG, e que, portanto, devem considerar uma abordagem de sistema integrado de gestão (SIG). Tendo como foco uma planta de conversão de UF6, foi estudada a correlação entre as normas sobre SG da Agência com aquelas de mercado - ISO 9001, ISO 14001 e OHSAS 18001, e com os projetos de normas da Agência - DS316 e DS344, sobre segurança; concluindo-se que, ao se estruturar um SIG de acordo com as normas de SG da Agência, salvo alguns ajustes, estarão sendo atendidas as ISO 9001, ISO 14001 e OHSAS 18001. Por sua vez, a estruturação do SIG deve identificar outros requisitos sobre segurança, saúde e meio ambiente que considerem, também, as características químicas e industriais convencionais da planta, que estão fora do escopo (radiação ionizante) das normas de segurança da Agência. A pesquisa propõe um procedimento documental para um SIG para a planta em questão, fornecendo subsídios para racionalização e conteúdo da documentação identificada, para promoção da integração das funções de SG consideradas. / The Agency - International Atomic Energy Agency (IAEA), following the market trend of the management system integration, has decided to revise the quality assurance standards - IAEA 50-C/SG-Q publishing, in 2006, the standard on Management System (MS) IAEA GS-R-3 and its IAEA GS-G-3.1 guide. Also, the IAEA is about to publish a supplementary guide - IAEA DS349, which consider the integration of several functions involved in management of nuclear facilities, such as: safety, health, environmental and quality, ensuring that nuclear safety is not compromised. Conversion plants of Yellowcake in UF6 use and process radioactive materials, as well as other substances normally found in the chemical conventional industry, inserting themselves in the organization profile that require a high pattern of definition, implementation and continuous improvement of their MS and, therefore, should consider an approach of management integrated system (MIS). Taking a UF6 conversion plant as focus, the correlation was performed among the Agency MS standards and those of the market - ISO 9001, ISO 14001 and OHSAS 18001, as well as with the Agency drafts standards on safety (DS316 and DS344), concluding that, in structuring an MIS, in compliance with the Agency MS standards, except for some adjustments, the ISO 9001, ISO 14001, and OHSAS 18001 are going to be met. On the other hand, the structuring of MIS should identify other requirements on safety, health and environmental, which also consider the conventional chemical and industrial characteristics that are out of the scope (ionizing radiation) of the safety standards of the Agency. The research proposes a documental procedure for a MIS applicable to this plant, providing elements for rationalization and contents of the identified documentation, for the promotion of the integration of the considered MS functions.
8

Proposta de uma estrutura conceitual de modelagem de empresas para implementação do ERP5 baseada na ISO 19440:2007 /

Rochetti, Angela Teresa. January 2009 (has links)
Orientador: Renato de Campos / Banca: Rodolfo Florence Teixeira Junior / Banca: Marcius Fabius Henriques de Carvalho / Resumo: Para o aumento da capacidade gerencial e competitiva das empresas um dos principais recursos é o uso dos sistemas integrados de gestão ou Enterprise Resource Planning (ERP). Os ERPs livres de código aberto têm ganhado uma aceitação cada vez maior, oferecendo vantagens como diminuição dos custos e o acesso ao código. Para usufruir destas vantagens são necessários métodos e ferramentas adequadas para o levantamento do modelo de requisitos de negócios, visando facilitar o desenvolvimento ou implantação do software. Linguagens de modelagem de empresas contribuem para a definição de requisitos de empresas por possuir sintaxe e semântica mais adequada para este fim. Atualmente várias linguagens de modelagem de empresas são propostas, como por exemplo, a linguagem CIMOSA. Pretende-se nesta pesquisa estudar e comparar linguagens de modelagem de empresas, visando definir um conjunto de construtores de linguagem que mais se adéqüe ao desenvolvimento e adaptação de ERPs, em específicos para ERPs livres de código aberto. Também, são propostos uma estrutura conceitual e diretrizes para a passagem de modelos de empresa para o modelo de sistema ERP5. / Abstract: In order to improve the competitive and management capacity of a company, one of the main resources is the use of Enterprise Resource Planning (ERP). The ERPs free of open code have gained an increasing acceptance, offering advantages such as lower costs and access to the codes. To enjoy these benefits, appropriate methods and tools are necessary in order to set up the model of business requirements, to facilitate the development or customization of software codes. Business modeling languages contribute for the definition of companies requirements because they have syntax and semantics more appropriate for this purpose. Nowadays, several languages are proposed for business modeling, for example CIMOSA. The main objective of this work is to study business modeling languages, comparing them and mapping the builder of CIMOSA language. Based on the definition of a more complete group of business modeling languages builders, and consistent with ERP5 classes, it is proposed guidelines for the implementation or customization of the ERP5, through the passage of a business model to the information system model, in a more systematic and appropriate way. / Mestre
9

Métodos para diagnóstico e integração de sistemas de gestão / Management system diagnostic and integration methods

Bonato, Samuel Vinícius January 2012 (has links)
A crescente implementação de sistemas de gestão da qualidade, saúde, segurança e meio ambiente tem despertado nas organizações o interesse pela integração destes sistemas. A necessidade de se definir quais requisitos normativos são comuns a todos os sistemas implementados e quais devem ser integrados, além da identificação da situação atual da empresa em relação ao atendimento e integração destes requisitos, abre cada vez mais espaço para elaboração de métodos organizados para planejamento, execução e controle desta integração. Um dos objetivos deste trabalho foi inicialmente elaborar um método para diagnóstico do nível de integração de sistemas de gestão baseados nas normas ISO9001, ISO14001 e OHSAS18001 e a avaliação deste método através da aplicação prática em uma empresa do ramo metal-mecânico. Baseado no estudo de caso mencionado, foi possível identificar o nível de integração da organização em relação a 19 requisitos normativos comuns às 3 normas e após foram sugeridas melhorias para os sistemas da empresa. Com os resultados do diagnóstico e a análise de um caso de insucesso da integração de sistemas de gestão em uma empresa do ramo metal-mecânico, a dissertação apresenta como objetivo principal um método de integração de sistemas de gestão baseados nas normas ISO9001, ISO14001 e OHSAS18001. Este método agrupa os requisitos normativos aplicáveis em 3 fases e determina uma sequência para a integração organizada destes requisitos, visando facilitar às organizações a execução do processos de integração de seus sistemas de gestão. / The increasing quality, health, safety and environment management system’s implementation has aroused at the companies the interest in integrate those system. The need to define which normative requirements are common to all implemented systems and which should be integrated and also the identification of the company’s current situation related to the accomplishment and integration of those requirements, opens up space to the development of organized methods for planning, performance and control of this integration. One of the objectives of this study was, at first, to develop a diagnostic method of management systems (based on ISO9001, ISO14001 and OHSAS18001 standards) integration level and this method evaluation through a practical application at a metallurgical company. Based on this mentioned case study, it was possible to identify the company’s integration level in relation to the 19 standard requirements common to the 3 mentioned Standards and after this management system improvements have been suggested. Based on the diagnostic results and a failure case of management system integration in a metallurgical company, this work shows as main objective an integration method to management systems based on ISO9001, ISO14001 and OHSAS18001 standards. This method groups the applicable standard requirements in 3 different steps and determines a sequence to an organized integration of this requirements, in order to make easy to the companies the integration processes performance of its management systems.
10

Licitações públicas : análise de preços praticados nas licitações do governo do Estado do Espírito Santo

Charpinel, Fabio Paiva 28 April 2015 (has links)
Made available in DSpace on 2016-08-29T11:12:20Z (GMT). No. of bitstreams: 1 tese_7431_Dissertação Final - Fabio Charpinel20160107-101424.pdf: 1347678 bytes, checksum: 0bf5a8aee47f91feba234f9f2823ae1c (MD5) Previous issue date: 2015-04-28 / Este trabalho tem o objetivo de estudar os processos licitatórios ocorridos no Governo do Estado do Espírito Santo à partir da implantação do Sistema Integrado de Gestão Administrativa (SIGA). Foi realizado um estudo visando apresentar a forma com que o Poder Executivo da Administração Pública Estadual do Estado do Espírito Santo vem tratando seus processos de compras e contratações. A partir do início da utilização do SIGA, este estudo fez uma análise das licitações verificando sua eficiência em relação à formação de preços nos processos licitatórios e os preços vencedores dos certames. Fazendo uma análise comparativa dos preços, podemos perceber que, de forma geral, ainda é muito discrepante o valor estipulado como referência nas licitações e os valores praticados pelos fornecedores. Dessa forma, ficou claro que ainda existe um grande caminho a ser percorrido pela Administração Pública, no sentido de alcançar maior efetividade de suas licitações. / This research wants to study the bidding process that happens in the Espirito Santo`s Government after the implantation of the Integrated System of Administrative Management (SIGA). A study was made to show the form that the Espirito Santo`s governance has been treating your process of purchases and contracts. After starts of SIGA this study made a review about the biddings to check the efficiency beside the construction of the prices in the process and the winner`s prices. Making a comparison about the prices is possible to conclude that in the global form is still very different the amount established as reference and the amount made by suppliers. So is clear that still exist a great way to come if the Public Administration wants to achieve a better effectiveness in yours bidding process.

Page generated in 0.1269 seconds