241 |
Analýza a vyhodnocení umísťování staveb dle stavebního zákona / Analysis and evaluation of the placement of buildings under the Building ActNenál, Marek January 2015 (has links)
This study analyzed and evaluate the locating structures according to the building Act. The theoretical part comprises the building Act, forms of the territorial decisions with their detailed structure, general requirements of plots use and zoning permit process. In the practical section, examples about the placing of building with subsequent evaluation are included. Objectives and the result of the work are summarized in the end of this dissertation.
|
242 |
Optimalizace financování bydlení / Optimization of housing financeRoubcová, Veronika January 2016 (has links)
This thesis deals with the possibilities of financing their own housing. The theoretical part will explain the basic concepts of housing finance. The work is described in the financing of legal entities and individuals. A separate chapter is devoted to mortgage loans. A separate chapter is devoted to building savings, which is more often used variant of housing finance. The practical part will be finding funding options to purchase their own home. Self housing will work in this particular object that will be compiled as part of the work and budget. On the basis of specific conditions, will be offered by banks mortgage loans. At the conclusion of the chosen optimal financing plan.
|
243 |
Bytový dům / Block of flatsRoubal, Jan January 2016 (has links)
The basic aim of this diploma thesis is to prepare project documentation for construction management for the new residential building in Prague. The building is designed in a combined monolithic reinforced concrete and brick support system. The building consists of three above (3.NP partial) and one underground floor. The mass of the building is designed as a single integrated unit. Plan of the building is rectangular. The thesis includes documnetation in the range of requirements for building management, assessment in terms of building physics building and fire safety of the building.
|
244 |
Nepřímé náklady jako faktor konkurenceschopnosti ve stavebnictví / Indirect costs as a competitive factor in the construction industryHermanová, Lucie January 2016 (has links)
Diploma thesis deals with an evaluation of indirect costs as a competitive factor in the construction industry. Notions like construction market, construction company, costs, their structuring and the way of their calculation, then competition, competitive advantage and competitiveness are theoretically defined in the first part of the thesis. The second part of the thesis deals with an evaluation of the questionnaire survey and the guided interviews. The questionnaire survey results and the results of guided interviews are compared and subsequently, recommendations are determined at the end of the thesis.
|
245 |
Stavební průzkum a diagnostika konstrukce / Survey and Diagnostics of Building ConstructionMoravská, Veronika January 2016 (has links)
This thesis deal with survey and diagnostics of industrial building in Chropyne. The theoretical presents to the general issue of building technical surveys, diagnostics reinforced concrete structures and describes methods for diagnosis of reinforced concrete structures. Practical part deals with building survey and diagnostics of the object including static assessment.
|
246 |
Oceňování škod na stavebních objektech / Valuation of demage on buildingsŠolc, Karel January 2017 (has links)
This master's thesis "Valuation of Damages to Building Structures" deals with valuation of defects and damages to buildings. It describes and explains what a damage and a defect are and how they are defined and valuated. The defects and damages are defined and practically valuated on a sample building. Overall interpretation is performed in the conclusion of the thesis.
|
247 |
Dopad stavební investice na hospodaření společnosti / The Impact of Construction Investment on the CompanyKalisa, Eric January 2017 (has links)
The subject of the thesis "The impact of construction investment on the company" is to evaluate the economic results of selected companies through financial indicators and showing its impact on the company financial plan. The first part focuses on theoretical background in construction investment. The second part is devoted to financial analysis of the 2010-2015 periods and commenting on the results of the methods used. In the accounting statements and financial plans, it is also described construction investment, its implementation and the impact on construction investments.
|
248 |
Vliv umístění stavby na cenu a náklady stavebního objektu / The influence of the location of buildings on price and cost of a buildingPetr, Lubomír January 2017 (has links)
The thesis deals with the influence of the location of buildings on the price and the cost of a building. In the first theoretical part it deals with brownfields, redevelopment of geological environment and construction and demolition waste. In this passage the various concepts, their division, the legislative side of things and generally their problems are explained. The second part is practical, it analyzes the cost associated with the revitalization of abandoned buildings for the possibility of reuse of land. For these purposes the representative brownfield is created and it is set in different environment. In conclusion all important findings are summarized.
|
249 |
Hrad Týřov. Jeho někdejší význam, hmotná kultura a stavební podoba. / The Týřov castle. His former significance, material culture and building form.Dvořáková, Michaela January 2016 (has links)
(in English): This thesis solves the fundamental questions in research on castles and factual example in the form of Týřov. It deals with the history and architectural development of the castle, including a discussion of the origin of architectural traditions, which in previous works considered for the import of French architecture. A substantial part is dealing with the castle in the landscape, where the emphasis is on natural conditions, which give structural form of the castle. Another aspect that has been solved in this work is to establish a castle on the local infrastructure and major traffic junctions, or obstacles (fords, etc.), Including a link to the village maids and raw materials. In the studio castles are often accentuated features of the castle. In addressing this issue we must address its structural form, infrastructure, facilities, raw material and inventory of the castle, which reports on the social status of its inhabitants. The last part is the processing of the selected file material. This process yielded pottery dating the 13th century, which still missing in the region. The processed material is also evidenced by the daily life of the inhabitants of the castle.
|
250 |
Kolaudace stavebního záměru de lege lata, de lege ferenda / Final inspection approval of construction programme de lege lata, de lege ferendaHejduk, Martin January 2021 (has links)
1 Final inspection approval of construction programme de lege lata, de lege ferenda Abstract This master thesis aims on providing a comprehensive overview of an issue regarding the final inspection approval of construction programme and identification of errors associated with the current legal regulation of final inspection approval by Act No. 225/2017 Coll., and providing de lege ferenda proposals and answering question, whether the process is actually being simplified and accelerated, as declared the explanatory memorandum to the amendment to the Building Act No. 225/2017 Coll. compared to the state before. The master's thesis is composed of six chapters. Chapter one aims on legal sources governing the issue of construction law. The most important legislation concerning the issue is listed. Second chapter determines basic concepts contained in the Building Act associated with final inspection approval, which are necessary for understanding of this master thesis content. These concepts are structure, developer, part of the structure, temporary structure, change of the finished structure, or general conditions for construction. Chapter three contains an analysis of the organization of building offices and selected issues as an authorized inspector and the respective authorities. Fourth chapter, which is...
|
Page generated in 0.0306 seconds