• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 243
  • Tagged with
  • 243
  • 170
  • 163
  • 162
  • 152
  • 140
  • 139
  • 139
  • 136
  • 136
  • 136
  • 127
  • 126
  • 124
  • 118
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
171

Zastřešení zimního stadionu Krnov - stavebně technologický projekt / Roofing of winter stadium Krnov - construction technological project

Kolářová, Jana January 2015 (has links)
This Master´s thesis deals with the realization of roofing winter stadium in Krnov. Selected points of construction technology project are technical report, financial plan and schedule, project site facilities and design of the main construction machinery. Detail work solves rough superstructure. This part contains the technological prescription of specifications supporting the roof structure, transportation of oversized glued arched trusses, inspection and test plan, risks and precaution, a detailed schedule and itemized budget. The work also includes a draft contract for work.
172

Stavebně technologická studie realizace haly Blansko / CONSTRUCTIONAL-TECHNOLOGICAL STUDY OF HALL REALIZATION IN BLANSKO

Škopík, Michal January 2015 (has links)
This diploma thesis deals with solution of construction of steel hall in Blansko. In this thesis is solved constructional-technological study of construction of steel hall. The thesis focuses in assembly of steel skeleton. More specifically deals with traffic situation around building, time and financial plan of the building for individual objects, draft of equipment of construction site, design of the main lifting machines and mechanisms, schedule of the main building object, safety measures at the construction site and ensuring quality requirements for the installation of a steel skeleton. Extra is processed itemized budget with bill of quantities, risk plan of construction of steel hall and construction details. This building is very interesting about architectural design. The basis for this thesis was a drawing documentation for realization of this construction.
173

Návrh větrání čistého pracoviště pro elektrotechnický průmysl / Ventilation of a clean room in electronic industry

Tichý, David January 2008 (has links)
The work describes an air conditioning and circulation system of a clean room environment in of a semiconductor production site. It is based on given requirements for air cleanness, temperature preasure and relative moisture. The first half of the work describes the way the system should work, classification of construction and operation of the site. The second half describes the calculations of the given parameters on which the system is designed. The calculations deal with - Air exchange and maintaining the required parameters - Designing the muti stage air filtration system - Designing the air flow speed, intake and outlet parameters of the air conditiong distribution system - Desingning the air conditioning units and their possitioning in the utility room
174

Výrobní hala s administrativní částí v Ústí nad Orlicí - Hylváty, stavebně technologická příprava stavby / Production hall with an administrative part in Ústí n Orlicí - Hylváty, civil technological project

Dobrovská, Monika January 2016 (has links)
The subject of the thesis is the construction and technological preparation of a production hall building with an administrative part in Ústí nad Orlicí – Hylváty. For the construction project a technical report, site equipment, studies of technological implementation, a time and financial schedule, a design of the main building machines and mechanisms, a time schedule and time standard, technological specification and the relevant inspection and test plans will be written. The other task includes a comparison of the two building envelope technologies, a contract for work, a plan of risks for the building evelope and pattern moving mechanical assemblies. The subject, which I deal with in this thesis, is in the field of constructions- selected details of the building envelope preparation.
175

Mezinárodní centrum klinického výzkumu v Brně - stavebně technologický projekt / Construction technology project of International Clinical Research Center in Brno

Brůžek, Zdeněk January 2016 (has links)
The diploma thesis deals with construction and technological study of II. stage of construction of the international clinical research center in Brno. The aim is to design an appropriate technological process of construction of the main building and resources for construction. This work contains technological study of realization of the main technological stages of the main construction building and the technical report for site equipment with drawings and time schedule. The thesis is also focused on the installation of gypsum construction and clean room construction of the operating room, design of mechanical equipment and instructions for usage of the building.
176

Modernizace pavlačového bytového domu, Petrská 4, Praha, stavebně technologická příprava stavby / Modernization gallery residential building, Petrská street, Praha, civil technological project

Hamerníková, Veronika January 2016 (has links)
Diploma thesis focuses on solving of the technological preparation of building modernization of gallery residential building in Prague 1 at Petrska street. The main goal of the thesis is a demolition of the existing building and construction of a new ceiling above the third floor. The paper includes the construction and technological report, technical report for concruction site equipment, technological regulations of demolition works and the ceiling structure above the third floor – there are two design variants of the ceiling structure icluded. The variants contend a comparation of two technologies version of ceiling structure above the third floor. Thesis also includes the inspection and test plans, design of machine arrangement, transport relations, safety and health protect plan, environmental plan, work and time schedule and financial calculation of building modernization
177

Vybrané části stavebně technologického projektu - Biotechnologické a biomedicínské centrum Akademie věd a Univerzity Karlovy / The selected parts of construction technology project - Biotechnology and biomedicine center of the Academy of sciences and Charles university

Mihal, Marek January 2016 (has links)
Subject of this diploma thesis is the construction and technological solutions to the main building of biotechnology and biomedicine centre in Vestec. The aim of a thesis is to propose time, technical and technological construction processes of construction. The content of a thesis is the project of site equipment, time and financial plan of construction, assembly machines, studies of realization main technological phase, inspection and test plan for plasterboard partition, technological regulations for plasterboard partition, metal facade and contact insulation system ETICS.
178

Obchodní centrum Orlová - stavebně technologický projekt / Business Center Orlova - building and technological project

Maléřová, Tereza January 2016 (has links)
This Diploma thesis processes construction of a retail centre in Orlová Town, considering technology, finance and time aspects. Attention is focused mainly on the building process of the main premise – the structure of retail centre. Significant part of this dissertation consists of the technology study specifying readiness, proceedings and consequences of particular operations. In following chapters the main machine, substance and human resources and theire employment in place and time will be defined. More precise technology methods for chosen processes as well as quality standards in assesment and evaluation plan will be provided together with risk adjustment and risk management. In addition the Technical Report for equipment used in construction site will be submited, completed with sketches of construction-site equipment for chosen building stages. Financial and time schedule based on the technical and economy indicators will be provided for the complex of Retail centre, followed by precise time schedule. The impact of increased noise level caused by construction process will be evaluated in acoustic study and revelant precautions will be proposed and their effectivity verified.
179

"Tyršův most" Litoměřice, příprava realizace stavby / "Tyršův bridge" Litomerice, preparation of implementation

Cupl, Jiří January 2016 (has links)
Master's thesis process construction technology preparation and implementation of project "Tyršův Bridge" in Litomerice. Because condition of bridges is very poor, it was decided to reconstruction them. This is a design for reconstruction of bridges, roads and road-bed on the system of Tyršův Bridge in Litomerice to the extent of the diploma work. During the reconstruction will replace bridges registration no. 15-040 and 15-041 new ones of the same lightness, on the bridge registration no. 15-042 will be replaced roadway and bridge ev.č. 15-043 will be replaced and the structure of the supports. Will be extended road-bed between bridges registration no. 15-040 and 15-041 using gabion construction.
180

Komerční dům v Brně - stavebně technologická příprava výstavby / Commercial building in Brno - the construction technological planning

Sedláček, Stanislav January 2016 (has links)
The aim of my thesis was to perform construction and technological preparation of the construction of commercial house in Brno in the street Křídlovická. The introduction contains the expected design and construction process of the proposed building as a whole. It is also prepared a preliminary draft of the financial cost of the entire project designed according THU and object schedule. Furthermore, the implementation of the project construction site for a major part of the commercial house. Gradually work focuses mainly on the implementation of the technological stage of construction site with detailed processing procedure for the implementation of monolithic concrete structures of the building.

Page generated in 0.0325 seconds