Spelling suggestions: "subject:"tensiones"" "subject:"tension""
91 |
Damage-Free Seismic-Resistant Self-Centering Friction-Damped Braced Frames with Buckling-Restrained ColumnsBlebo, Felix C. 26 June 2015 (has links)
No description available.
|
92 |
Development of a Slab-on-Girder Wood-concrete Composite Highway BridgeLehan, Andrew Robert 23 July 2012 (has links)
This thesis examines the development of a superstructure for a slab-on-girder wood-concrete composite highway bridge. Wood-concrete composite bridges have existed since the 1930's. Historically, they have been limited to spans of less than 10 m. Renewed research interest over the past two decades has shown great potential for longer span capabilities. Through composite action and suitable detailing, improvements in strength, stiffness, and durability can be achieved versus conventional wood bridges.
The bridge makes use of a slender ultra-high performance fibre-reinforced concrete (UHPFRC) deck made partially-composite in longitudinal bending with glued-laminated wood girders. Longitudinal external unbonded post-tensioning is utilized to increase span capabilities. Prefabrication using double-T modules minimizes the need for cast-in-place concrete on-site. Durability is realized through the highly impermeable deck slab that protects the girders from moisture. Results show that the system can span up to 30 m while achieving span-to-depth ratios equivalent or better than competing slab-on-girder bridges.
|
93 |
Development of a Slab-on-Girder Wood-concrete Composite Highway BridgeLehan, Andrew Robert 23 July 2012 (has links)
This thesis examines the development of a superstructure for a slab-on-girder wood-concrete composite highway bridge. Wood-concrete composite bridges have existed since the 1930's. Historically, they have been limited to spans of less than 10 m. Renewed research interest over the past two decades has shown great potential for longer span capabilities. Through composite action and suitable detailing, improvements in strength, stiffness, and durability can be achieved versus conventional wood bridges.
The bridge makes use of a slender ultra-high performance fibre-reinforced concrete (UHPFRC) deck made partially-composite in longitudinal bending with glued-laminated wood girders. Longitudinal external unbonded post-tensioning is utilized to increase span capabilities. Prefabrication using double-T modules minimizes the need for cast-in-place concrete on-site. Durability is realized through the highly impermeable deck slab that protects the girders from moisture. Results show that the system can span up to 30 m while achieving span-to-depth ratios equivalent or better than competing slab-on-girder bridges.
|
94 |
Spojitá betonová mostní konstrukce / Continuous concrete bridge structureZemánek, Tomáš January 2018 (has links)
The diploma thesis is focused on solving road bridge situated between Roudno and Razová village over the water basin Slezská Harta. Before the design itself 3 studies were created and compared together. The selected variant is a continuous box girder with inclined walls, post-tensioned by bonded cables. The girder of a total lenght 148,0 m and width 13,6 m is divided into three spans. Height of the girder is 3,3 m. A detailed structural design, including construction limit state assessment, prestress design and time dependent analysis verification is processed. The design and the assessments of temporary and permanent situations are made according to valid standarts and regulations. Drawings and vizualizations are parts of the diploma thesis.
|
95 |
Rekonstrukce visuté lávky v Kroměříži / Reconstruction of the cable suspended footbridge in KroměřížLiška, Jaroslav January 2020 (has links)
The Diploma thesis deals with the reconstruction design of a footbridge in the city of Kroměříž, Czech Republic. The footbridge would serve as safe transport for pedestrians over the Morava river. The main objective of the thesis is to conceive two or three reconstruction designs. The most suitable one will be opted for and elaborated in more detail. Eventually, strengthening of the bridge by means of additional prestressing using mono-strand post-tensioning systems is picked as the best solution of the planned reconstruction. The monostrand post-tensioning system is led under the deck, the cross section being outside. External cables are anchored in concrete blocks built around existing supports. Load-generated internal forces are calculated on a spatial bar model with non-linear first-order analysis. The calculation is executed using the finite element method in the midas Civil programme. The chosen reconstruction design is then assessed against load capacity limit states, and functionality. Also, the designed reconstruction is assed for dynamic effects. Results are compared with existing structure, and verified against the real-time tensometric measurement-obtained data. Dimensions, assessment of load-bearing structure, and structural details are all made according to valid Eurocodes.
|
96 |
Řešení statického zajištění přístavby stávajícího objektu / Structural strengthening of the outbuilding of existing constructionPelouch, Adam January 2021 (has links)
Diploma thesis is focused on structural assessment and strengthening of the reinforced concrete flor slab disturbed by excessive deflection. Thesis included assesment of the existing construction and design method of strengthening of the floor structure with system using prestressing strands without bond.
|
97 |
Rekonstrukce budovy pivovaru s předpjatými stropními deskami / Reconstruction of the brewery structure using post-tensioned ceilingZavadil, Bronislav January 2013 (has links)
Aim of this master's thesis is an optimized design of locally supported ceiling slab of building of social center with account of span of columns and height of slab. Structure must be assessed in terms of limit state and service limit state by ČSN EN 1992-1-1 General rules and rules for buildings after design.
|
98 |
Střecha plaveckého stadionu / Roof of the swimming poolPelikán, Adam January 2014 (has links)
This diploma thesis is about designing the structure of roof of swimming stadium. Three solutions are created - concrete arc with tie, steel truss slab and concrete pretensioned membrane. One choosed solution - concrete pretensioned membrane - is afterwards developed. In the beginning there are several designs of geometry fulfilling the requirements for given type of structure being created. In part of static calculation, the parametrical mathematical model in form of macro in APDL language for Ansys software has been created. Afterwards all the parameters (initial state of cables, level of pretension, dimensions of membrane and peripheral frame, etc.) has been optimized in order to the membrane be fulfilling criterias for ultimate limit state and serviceability limit state. Afterwards other selected parts of structure has been checked. On basis of designed geometry and design checks in static calculation the drawings of conctruction and designed parts has been created. In the end, the 3D model of the structure has been created in graphical software Rhinoceros. Then visualizations of structure in concstruction stages and after completion has been rendered.
|
99 |
Most nad potokem Bystrice / Bridge across Bystrica creekNani, Pavel January 2015 (has links)
The subject of my diploma thesis is a detailed static calculation of the post-tensioned concrete road bridge across Bystrica creek near Banska Bystrica in Slovakia. The bridge is element of turning ramp a motorway R1. The spatial curvature continuous bridge has 9 fields. It was made a spatial curvature computational model of the bridge for a structural analysis. The model was comparison with a straight computational model of the bridge. It is made comparison effect of the construction bridge in stages on the size of the internal forces too. The load-bearing structure was checked according to CSN EN 1992-1-1, CSN EN 1992-2 and CSN 73 6214.
|
100 |
Stavebně technologický projekt realizace Místní komunikace ve Žďáru nad Sázavou / Constructive technological project ofKalců, Martin January 2015 (has links)
This diploma thesis deals with the development of constructive technology project od local road in Žďár nad Sázavou. Specifically, there is a solution prestressed reinforced concrete construction of the bridge over the Sázava river according to the extent of the diploma work.
|
Page generated in 0.0606 seconds