• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 4
  • 1
  • Tagged with
  • 5
  • 4
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Kartläggning av ytjämnheten efter kallvalsning för olika kallvalsade kvalitéer samt trimvalsningens påverkan på ytjämnheten

Argårds, Andreas January 2010 (has links)
Syftet med detta arbete är att kartlägga ytjämnheten på stålbanden efter kallvalsning samt hur den erhålla ytjämnheten påverkas av trimvalsningen. Detta för att undersöka om det är möjligt att minska ner användandet av någon valsyta i Tandemverket vid SSAB Borlänge. Genom att mäta ytjämnheten på stålband av olika kallvalsade kvalitéer efter kallvalsning och trimvalsning, mäta ytråheten på texturerade valsar före och efter användning samt genomföra test med nya ytkombinationer har ett antal resultat genererats. Två test där Docol 200 band som skulle levereras med bandyta 23 valsades med en grövre yta i Tandem (valsyta 48 istället för 34) än vad som är brukligt och sedan trimvalsades med ordinarie valsyta visade att det är möjligt att klara kraven på Ra-värde för bandyta 23 även på band som kallvalsats med en grövre valsyta än i vanliga fall. Dock är det inte säkerställt att kraven för yta 23 alltid kan uppnås på band kallvalsade med grövre valsyta. Trimvalsning med valsyta 57 i den kontinuerliga glödgningslinjen har ingen betydande påverkan på ytjämnheten för Docol 600 & 800 DP, dock påverkar den ytan för Docol 200 eftersom att dessa band har mindre spridning i Ra-värde efter trimvalsning jämfört med innan. Trimvalsning med valsyta 57 höjer toppantalet på bandens yta. Band av en högre hållfasthetsklass får lägre Ra-värde jämfört mot mjukare stålsorter. Band med stor tjockleksreduktion i Tandem får lägre Ra-värde, detta gäller speciellt Docol 200 där trenden är tydligast. Ra-värdet på de texturerade valsarna i Tandem sjunker mycket i början när de används, test har visat att redan under kalibreringen kan Ra-värdet minska med 0,8 µm – 1,3 µm.
2

SSAB Tunnplåts strategikommunikation 2005-2007 : en studie av strategispelet

Sjöstrand, Jakob, Sundgren, Maria January 2007 (has links)
<p>SSAB Tunnplåts ledning utarbetade under 2004/2005 fram en ny strategiplan. Denna kommunicerades ut i olika steg under 2005 och 2006. Ett av stegen var projektet Strategispelet.</p><p>Syftet med denna uppsats är att analysera SSAB Tunnplåts genomförande av den strategikommunikation som utfördes 2005-2007 i Borlänge och Luleå, med fokusering på Strategispelet. Fanns det brister i projektet Strategispelet och kunde de i så fall ha undvikits?</p><p>Vi har genom intervjuer vid SSAB Tunnplåt skapat en bild av strategikommunikationen. Kompletterande information har hämtats från SSAB Tunnplåts dokumentation kring kommunikationen. Med samma tillvägagångssätt har sedan planering och genomförande av Strategispelet kartlagts. Denna kartläggning har sedan analyserats utifrån perspektiven strategiimplementering, projekt och enkät.</p><p>Vi fann att det vid projektet Strategispelet funnits brister i målformulering, ansvarsfördelning och enkätens konstruktion. Beroende på det genomförandesätt som valdes vid SSAB Tunnplåt blev det svårt att sammanställa informationen från spelets frågor. Vi kommer i slutsatsen fram till att grundligare förberedelser av projektet och enkäten förmodligen hade kunnat förebygga de brister som uppstod.</p>
3

SSAB Tunnplåts strategikommunikation 2005-2007 : en studie av strategispelet

Sjöstrand, Jakob, Sundgren, Maria January 2007 (has links)
SSAB Tunnplåts ledning utarbetade under 2004/2005 fram en ny strategiplan. Denna kommunicerades ut i olika steg under 2005 och 2006. Ett av stegen var projektet Strategispelet. Syftet med denna uppsats är att analysera SSAB Tunnplåts genomförande av den strategikommunikation som utfördes 2005-2007 i Borlänge och Luleå, med fokusering på Strategispelet. Fanns det brister i projektet Strategispelet och kunde de i så fall ha undvikits? Vi har genom intervjuer vid SSAB Tunnplåt skapat en bild av strategikommunikationen. Kompletterande information har hämtats från SSAB Tunnplåts dokumentation kring kommunikationen. Med samma tillvägagångssätt har sedan planering och genomförande av Strategispelet kartlagts. Denna kartläggning har sedan analyserats utifrån perspektiven strategiimplementering, projekt och enkät. Vi fann att det vid projektet Strategispelet funnits brister i målformulering, ansvarsfördelning och enkätens konstruktion. Beroende på det genomförandesätt som valdes vid SSAB Tunnplåt blev det svårt att sammanställa informationen från spelets frågor. Vi kommer i slutsatsen fram till att grundligare förberedelser av projektet och enkäten förmodligen hade kunnat förebygga de brister som uppstod.
4

Bättre utnyttjande av nya och befintliga förrådslokaler på SSAB Tunnplåt

Öberg Bustad, Gabriel January 2009 (has links)
The purpose of this assignment at SSAB Tunnplåt in Borlänge was mainly to investigate and describe the circumstances for the spare parts stored in storage facilities within the area of operation. Even new facilities which could serve as storage rooms and their opportunities for storing spare parts were an important part of the investigation. This because of the need for improved storing of spare parts. Furthermore, market offers where reviewed for storage of spare parts in more tailored designs. The work will culminate in proposals for improvement which is of importance for the development surrounding the storage and handling of spare parts. This is since the design and management of existing storage facilities is not perceived as satisfactory with regards to spare parts characteristics. Moreover, the amount of stock locations is too few in relation to the actual need. The approach used to achieve objectives of the work was an advanced mapping for collection of vital data. The mapping consisted of interviews with involved parties, both internal and external, for the most comprehensive picture of the problems as possible. In addition, a literature survey was conducted to identify possible options for the objectives of the work as well as a personal study of existing and new storage facilities. Furthermore, the market offers for improved conditions in storage rooms were examined. A clear picture of internal logistics and warehouse activities for spare parts at SSAB Tunnplåt has been obtained during this work. From this picture, it is concluded that work in and around storage facilities can be made more efficient. SSAB Tunnplåt should additionally make efforts in the storage facilities for better use of the available storage space. A number of proposals for improvement for each studied storage facility and spare parts management in general have been conducted. These proposals for improvement include presentations to improve the design of the studied storage facilities towards enabling more stock locations. The proposals also include additional equipment for handling spare parts, scrap handling, as well as expansions of the maintenance system which supports activities in the spare parts management.
5

Energy Analysis within Industrial Hydraulics and Correspondent Solar PV System Design

Absalyamova, Viktoriya January 2010 (has links)
Energy efficiency and renewable energy use are two main priorities leading to industrial sustainability nowadays according to European Steel Technology Platform (ESTP). Modernization efforts can be done by industries to improve energy consumptions of the production lines. These days, steel making industrial applications are energy and emission intensive. It was estimated that over the past years, energy consumption and corresponding CO2 generation has increased steadily reaching approximately 338.15 parts per million in august 2010 [1]. These kinds of facts and statistics have introduced a lot of room for improvement in energy efficiency for industrial applications through modernization and use of renewable energy sources such as solar Photovoltaic Systems (PV).The purpose of this thesis work is to make a preliminary design and simulation of the solar photovoltaic system which would attempt to cover the energy demand of the initial part of the pickling line hydraulic system at the SSAB steel plant. For this purpose, the energy consumptions of this hydraulic system would be studied and evaluated and a general analysis of the hydraulic and control components performance would be done which would yield a proper set of guidelines contributing towards future energy savings. The results of the energy efficiency analysis showed that the initial part of the pickling line hydraulic system worked with a low efficiency of 3.3%. Results of general analysis showed that hydraulic accumulators of 650 liter size should be used by the initial part pickling line system in combination with a one pump delivery of 100 l/min. Based on this, one PV system can deliver energy to an AC motor-pump set covering 17.6% of total energy and another PV system can supply a DC hydraulic pump substituting 26.7% of the demand. The first system used 290 m2 area of the roof and was sized as 40 kWp, the second used 109 m2 and was sized as 15.2 kWp. It was concluded that the reason for the low efficiency was the oversized design of the system. Incremental modernization efforts could help to improve the hydraulic system energy efficiency and make the design of the solar photovoltaic system realistically possible. Two types of PV systems where analyzed in the thesis work. A method was found calculating the load simulation sequence based on the energy efficiency studies to help in the PV system simulations. Hydraulic accumulators integrated into the pickling line worked as energy storage when being charged by the PV system as well.

Page generated in 0.0302 seconds