111 |
Nonstop27 October 2015 (has links) (PDF)
No description available.
|
112 |
Comparative assessment of large dam projects a challenge for multi-criteria decision analysisPetersson, Elke Unknown Date (has links)
Techn. Univ., Diss., 2006--Darmstadt
|
113 |
Thirsting for credible commitments : how secure land tenure affects access to drinking water in Sub-Saharan Africa /Sjöstedt, Martin. January 2008 (has links) (PDF)
Univ., Diss.--Göteborg, 2008.
|
114 |
Neue Disparitäten durch Infrastruktur? der Wandel der Wasserwirtschaft in ländlich-peripheren RäumenNaumann, Matthias January 2008 (has links)
Zugl.: Potsdam, Univ., Diss., 2008 u.d.T.: Naumann, Matthias: Zwischen Kommerzialisierung und ungleicher Entwicklung
|
115 |
Auswirkungen des Klimawandels auf die Wasserwirtschaft – Potenziale möglicher Flutpolder an der ElbeHorlacher, Hans-Burkhard, Kopp, Thomas, Carstensen, Dirk, Stamm, Jürgen 11 May 2010 (has links)
Im Rahmen des Forschungsverbundvorhabens „Veränderung und Management der Risiken extremer Hochwasserereignisse in großen Flussgebieten – am Beispiel der Elbe“ wurden verschiedene Handlungsstrategien zur Verringerung potenzieller Hochwasserrisiken unter Berücksichtigung des Klimawandels untersucht. Risiko wird als Produkt aus Schaden und Eintrittswahrscheinlichkeit definiert. Eine Möglichkeit zur Minderung des Risikos infolge von Hochwasserereignissen besteht demnach in der Beeinflussung der Eintrittswahrscheinlichkeit bzw. aus wasserwirtschaftlicher Sicht des damit einhergehenden Hochwasserabflusses. Der vorliegende Beitrag zeigt Möglichkeiten der Hochwasserscheitelabsenkung mithilfe potenzieller, gesteuerter Flutpolder an der Elbe als Reaktion auf eine mögliche Erhöhung der Hochwasserrisiken infolge des Klimawandels auf. Diesbezüglich werden die angewendeten Modelle zur numerischen Berechnung der hydrologischen und hydraulischen Verhältnisse, die Auswahl von Standorten, wasserbauliche Grobkonzeptionen sowie Besonderheiten bei der Bemessung potenzieller Flutpolder an der Elbe erläutert. / As part of the integrated research project “Changes and management of risks of extreme flood events in large river basins – the example of the Elbe River”, various strategies to reduce potential flood risks, including climate change considerations, have been investigated. Risk is defined as a product of injury and probability of occurrence. With regard to hydraulics, one way to reduce the risk resulting from floods is to manage the discharge during the flood’s peak. This paper introduces the possibility of managing flood peak reduction using controllable flood polders along the Elbe in response to the possible risk of increased flooding due to climate change. The numerical models used to calculate the hydrological and hydraulic conditions are explained, alongside discussion of the site selection and preliminary hydraulic designs for potential flood polders.
|
116 |
Lagebericht ...: Kommunale Abwasserbeseitigung im Freistaat Sachsen08 June 2022 (has links)
No description available.
|
117 |
Lagebericht ...: Kommunale Abwasserbeseitigung im Freistaat Sachsen08 June 2022 (has links)
No description available.
|
118 |
Lagebericht ...: Kommunale Abwasserbeseitigung im Freistaat Sachsen08 June 2022 (has links)
No description available.
|
119 |
Lagebericht ...: Zur Beseitigung von kommunalem Abwasser und Klärschlamm im Freistaat Sachsen08 June 2022 (has links)
No description available.
|
120 |
Lagebericht ...: Zur kommunalen Abwasserbeseitigung und zur Klärschlammentsorgung im Freistaat Sachsen08 June 2022 (has links)
No description available.
|
Page generated in 0.0489 seconds