The aim of this study is to ensure the tender phase in its total price in a construction project. Today many construction projects is unmanageable and rejected mainly because of the price. By developing controlling key figures the companies can be more secure of the future costs during the project and therefore set a fair price. This study is committed in corporation with an industrialized construction company. The company has a building system that is predefined which includes the heavy part in the total costs of the project. The key figures are developed based on the actual price data from previous project that is divided in different cost items. Every cost item will have a control key figure. For the development of the figures a statistical method is used called regression analysis. The method requires a parameter that has a correlation to the cost items. The method will then generate a fitted function that can predict the costs of each item due to the parameter or parameters. And from the function a key indicator will be produced to function as an indicator to each cost item.
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:hh-34991 |
Date | January 2017 |
Creators | Meri, Halit, Johansson, Emma |
Publisher | Högskolan i Halmstad, Akademin för ekonomi, teknik och naturvetenskap, Högskolan i Halmstad, Akademin för ekonomi, teknik och naturvetenskap |
Source Sets | DiVA Archive at Upsalla University |
Language | Swedish |
Detected Language | English |
Type | Student thesis, info:eu-repo/semantics/bachelorThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.0017 seconds