Return to search

Propuesta para optimizar el tiempo de ejecución en edificaciones multifamiliares de nivel socioeconómico A y B ubicados en Lima Top y Lima Moderna en base al control de avance de las subcontratas utilizando herramientas tecnológicas en la etapa de acabados / Proposal to optimize the execution time in residentials buildings of socioeconomic level A and B located in Lima Top and Modern Lima Moderna based on the progress control of subcontractors using technological tools in the architecture stage

En Lima, la construcción de edificios multifamiliares está creciendo de forma exponencial y muchas constructoras tienen problemas para cumplir con el plazo establecido. Además, los proyectos de edificios multifamiliares cuentan con un alto número de partidas, en la cual se necesita mano de obra especializada por lo que las empresas subcontratan algunas actividades. Para esto, es necesario llevar un control de avance en la etapa de ejecución, de tal manera que la constructora pueda manejar de forma óptima, rápida y sencilla el avance de las diversas especialidades. La propuesta busca optimizar el tiempo de ejecución en edificios multifamiliares de nivel socioeconómico A y B ubicados en Lima top y Lima moderna en base al control de avance de las subcontratas utilizando herramientas tecnológicas en la etapa de acabados. En este sentido, la presente investigación desarrolla una propuesta consistente en la que se utiliza la aplicación Plan Grid para la recolección de información en obra, el software Power Bi para el procesamiento automático de la data y la visualización de un tablero de control que contiene indicadores y gráficos que reflejen el avance y rendimiento real de las partidas ejecutas, así como las principales causas de incumplimiento. La propuesta queda plasmada en una guía para el control de avance de subcontratistas y oriente a la correcta implementación. Con esto, se pueden tomar mejores decisiones y de tal manera, decidir rápidas y eficientes acciones correctivas y preventivas en base al tablero de control de avance. / In Lima, the construction of residential buildings is growing exponentially, and many construction companies are having problems meeting the established deadline. In addition, residential building projects have a high number of items, in which specialized labor is needed, which is why companies subcontract some activities. For this, it is necessary to keep track of progress in the execution stage, in such a way that the construction company can optimally, quickly and easily handle the progress of the different specialties. The proposal seeks to optimize the execution time in residential buildings of socioeconomic level A and B located in Lima top and Lima modern based on the progress control of subcontractors using technological tools in the architecture stage. In this sense, this research develops a consistent proposal in which the Plan Grid application is used to collect information on site, the Power Bi software for automatic data processing and the visualization of a dashboard that contains indicators and graphs that reflect the progress and the real performance of the executed activities, as well as the main causes of non-fulfillment. The proposal is reflected in a guide for the control progress of subcontractors and directs to the correct implementation. With this, better decisions can be made and in such a way, decide fast and efficient corrective and preventive actions based on the progress control dashboard. / Tesis

Identiferoai:union.ndltd.org:PERUUPC/oai:repositorioacademico.upc.edu.pe:10757/655738
Date12 March 2021
CreatorsPrat Lizier, Joaquín Ramon, Romero Navarro, Alvaro William
ContributorsFarje Mallqui, Julio Enrique
PublisherUniversidad Peruana de Ciencias Aplicadas (UPC), PE
Source SetsUniversidad Peruana de Ciencias Aplicadas (UPC)
LanguageSpanish
Detected LanguageSpanish
Typeinfo:eu-repo/semantics/bachelorThesis
Formatapplication/pdf, application/epub, application/msword
SourceUniversidad Peruana de Ciencias Aplicadas (UPC), Repositorio Académico - UPC
Rightsinfo:eu-repo/semantics/openAccess, Attribution-NonCommercial-ShareAlike 4.0 International, http://creativecommons.org/licenses/by-nc-sa/4.0/

Page generated in 0.0031 seconds