• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 70
  • 22
  • 20
  • 15
  • 5
  • 4
  • 4
  • 3
  • 3
  • 2
  • 2
  • 2
  • 1
  • 1
  • Tagged with
  • 160
  • 160
  • 160
  • 78
  • 77
  • 63
  • 57
  • 53
  • 51
  • 46
  • 41
  • 41
  • 39
  • 38
  • 36
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
151

Stanovení hodnoty podniku / Business Valuation

Partlová, Lucie January 2018 (has links)
This master’s thesis deals with determination of the value of Samohýl group, a. s. company at 01. 07. 2017. The theoretical part defines the basic concepts of valuation, such as business, value, strategic and financial analysis and valuation methods. In the analytical part, the analyzed company are basic information presented, strategic analysis, financial analysis including its assessment. The design part is processed by analysis and prognosis of value generators and the compilation of the financial plan and ultimately determination of the value of an enterprise using yield methods and accounting method.
152

Stanovení hodnoty obchodního závodu výnosovou metodou / Valuation of the Firm by Using Income Capitalization Approach

Jarošová, Lucie January 2018 (has links)
The thesis focuses on setting the financial value of company Agados Ltd. Two valuation methods, to be specific the methods DCF and EVA entity, have been used to value the company. The theoretical part deals with the issues of valuation and related areas. Subsequently, the company and the application of theoretical knowledge on Agados Ltd. are described. This work also contains strategic and financial analysis, individual steps for application of the income valuation method such as the proposal of a financial plan and capital expenses. The outcome of this thesis is the final valuation, for the needs of commercial establismet Agados Ltd., which is based on the income valuation method.
153

Stanovení hodnoty podniku výnosovou metodou / Valuation of the Firm by Using Income Capitalization Approach

Geletová, Miroslava January 2018 (has links)
This master´s thesis deals with the estimation of the value of company COMINFO, a.s. to the date 1.10.2016 using income based methods. Specifically using the method discounted cash flow in variant entity and economic value added in variant entity. In the theoretical part are described the basic theoretical starting points concerning the valuation of company. The practical part includes strategic analysis, financial analysis, analysis and prognosis of value drivers, financial plan and also the determination of the value of the company.
154

Stanovení hodnoty podniku výnosovou metodou / Valuation of the Firm by Using Income Capitalization Approach

Vítková, Veronika January 2020 (has links)
This diploma thesis deals with the valuation of the company STROJSTYL, s.r.o. The theoretical part defines basic concepts and methods related to the valuation of the company and mentions the procedure for performing the valuation of the company. Then follows the practical part, in which the company is introduced and theoretical knowledge is applied to the selected company in order to perform the final valuation of the company by 1 January 2019.
155

Ekonomické vyhodnocení akvizičního projektu podniku / Economic Evaluation of Acquisition Project

Nechvátal, Marek January 2020 (has links)
The diploma thesis focuses on the economic evaluation of the company acquisition project using methods of discounted cash flow, net present value and discounted payback period. The theoretical part of the thesis uses comprehensive view on modern methods of strategic and financial analysis, financial planning strategy and investment decision-making methods. The second half of the work contains practical part of strategic and financial analysis, calculated cost of equity, weighted average cost of capital and economic evaluation of the acquisition project itself.
156

Stanovení hodnoty podniku výnosovou metodou / Valuation of the Firm by Using Income Capitalization Approach

Kovaříková Oweis, Sabina January 2016 (has links)
This master thesis deals with the estimation of the value of enterprise PREFA KOMPOZITY a.s. via income based methods. Concretely determined by the methods of discounted cash flow and economical value added. In the theoretical part are described theoretical foundations and procedures used for valuation of enterprise. The practical part is pattern of theoretical part and consists of strategic analysis, financial analysis, SWOT analysis and also of the procedure determined on the basis of applied method of valuation. Result of the thesis is concrete determined value of the enterprise.
157

Ein Verfahren zur Wertermittlung von bergbaubeeinflussten Immobilien unter Verwendung des DCF-Verfahrens und der Fuzzy-Logik: Ein Verfahren zur Wertermittlung von bergbaubeeinflussten Immobilien unter Verwendung des DCF-Verfahrens und der Fuzzy-Logik

Romańska-Sobol, Anna 23 April 2013 (has links)
Die vorliegende Arbeit beschäftigt sich mit der Entwicklung einer Methode zur Wertermittlung von bergbaubeeinflussten Immobilien, welche die wesentlichen Bergbaurisiken berücksichtigt. Die Untersuchungen ergaben, dass das Risiko von Investitionen in bergbaubeeinflusste Immobilien durchschnittlich dreimal größer ist als das Risiko von Investitionen in Immobilien ohne Bergbaueinflüsse. Für die Ermittlung des Risikos kamen eine immobilien- und eine bergbauspezifische Komponente zum Einsatz. Letztere umfasst Prognosen zu potentiellen Oberflächenvernässungen, zur Sickerwassergefahr und zu bergbaubedingten Wertminderungen von Gebäuden unter besonderer Berücksichtigung der Gebäudeempfindlichkeit gegenüber bergbauinduzierten Bodenbewegungen. Für die Wertermittlung von Immobilien kam das Discounted Cash Flow-Verfahren zur Anwendung. Der Diskontfaktor wurde mit Hilfe eines speziell entwickelten Fuzzy-Modells bestimmt. Die erstellte Bewertungsmethode kann als relevante Entscheidungshilfe für Investitionen in Bergbaugebiete dienen.
158

Tržní oceňování podniku jako podklad pro strategická rozhodnutí / Estimation of the Company Market Value

Procházka, Tomáš January 2008 (has links)
The thesis assesses market value of company CENTA, spol. s r.o. for strategic decision purposes. The crucial method is income-based valuation method, which is assisted by asset-based valuation method. The first part of the thesis includes strategic, financial and SWOT analysis. Afterwards particular valuation methods are applied. In conclusion statement of value as at 31.12.2006 is reported.
159

Modelling of input data uncertainty based on random set theory for evaluation of the financial feasibility for hydropower projects / Modellierung unscharfer Eingabeparameter zur Wirtschaftlichkeitsuntersuchung von Wasserkraftprojekten basierend auf Random Set Theorie

Beisler, Matthias Werner 24 August 2011 (has links) (PDF)
The design of hydropower projects requires a comprehensive planning process in order to achieve the objective to maximise exploitation of the existing hydropower potential as well as future revenues of the plant. For this purpose and to satisfy approval requirements for a complex hydropower development, it is imperative at planning stage, that the conceptual development contemplates a wide range of influencing design factors and ensures appropriate consideration of all related aspects. Since the majority of technical and economical parameters that are required for detailed and final design cannot be precisely determined at early planning stages, crucial design parameters such as design discharge and hydraulic head have to be examined through an extensive optimisation process. One disadvantage inherent to commonly used deterministic analysis is the lack of objectivity for the selection of input parameters. Moreover, it cannot be ensured that the entire existing parameter ranges and all possible parameter combinations are covered. Probabilistic methods utilise discrete probability distributions or parameter input ranges to cover the entire range of uncertainties resulting from an information deficit during the planning phase and integrate them into the optimisation by means of an alternative calculation method. The investigated method assists with the mathematical assessment and integration of uncertainties into the rational economic appraisal of complex infrastructure projects. The assessment includes an exemplary verification to what extent the Random Set Theory can be utilised for the determination of input parameters that are relevant for the optimisation of hydropower projects and evaluates possible improvements with respect to accuracy and suitability of the calculated results. / Die Auslegung von Wasserkraftanlagen stellt einen komplexen Planungsablauf dar, mit dem Ziel das vorhandene Wasserkraftpotential möglichst vollständig zu nutzen und künftige, wirtschaftliche Erträge der Kraftanlage zu maximieren. Um dies zu erreichen und gleichzeitig die Genehmigungsfähigkeit eines komplexen Wasserkraftprojektes zu gewährleisten, besteht hierbei die zwingende Notwendigkeit eine Vielzahl für die Konzepterstellung relevanter Einflussfaktoren zu erfassen und in der Projektplanungsphase hinreichend zu berücksichtigen. In frühen Planungsstadien kann ein Großteil der für die Detailplanung entscheidenden, technischen und wirtschaftlichen Parameter meist nicht exakt bestimmt werden, wodurch maßgebende Designparameter der Wasserkraftanlage, wie Durchfluss und Fallhöhe, einen umfangreichen Optimierungsprozess durchlaufen müssen. Ein Nachteil gebräuchlicher, deterministischer Berechnungsansätze besteht in der zumeist unzureichenden Objektivität bei der Bestimmung der Eingangsparameter, sowie der Tatsache, dass die Erfassung der Parameter in ihrer gesamten Streubreite und sämtlichen, maßgeblichen Parameterkombinationen nicht sichergestellt werden kann. Probabilistische Verfahren verwenden Eingangsparameter in ihrer statistischen Verteilung bzw. in Form von Bandbreiten, mit dem Ziel, Unsicherheiten, die sich aus dem in der Planungsphase unausweichlichen Informationsdefizit ergeben, durch Anwendung einer alternativen Berechnungsmethode mathematisch zu erfassen und in die Berechnung einzubeziehen. Die untersuchte Vorgehensweise trägt dazu bei, aus einem Informationsdefizit resultierende Unschärfen bei der wirtschaftlichen Beurteilung komplexer Infrastrukturprojekte objektiv bzw. mathematisch zu erfassen und in den Planungsprozess einzubeziehen. Es erfolgt eine Beurteilung und beispielhafte Überprüfung, inwiefern die Random Set Methode bei Bestimmung der für den Optimierungsprozess von Wasserkraftanlagen relevanten Eingangsgrößen Anwendung finden kann und in wieweit sich hieraus Verbesserungen hinsichtlich Genauigkeit und Aussagekraft der Berechnungsergebnisse ergeben.
160

Modelling of input data uncertainty based on random set theory for evaluation of the financial feasibility for hydropower projects

Beisler, Matthias Werner 25 May 2011 (has links)
The design of hydropower projects requires a comprehensive planning process in order to achieve the objective to maximise exploitation of the existing hydropower potential as well as future revenues of the plant. For this purpose and to satisfy approval requirements for a complex hydropower development, it is imperative at planning stage, that the conceptual development contemplates a wide range of influencing design factors and ensures appropriate consideration of all related aspects. Since the majority of technical and economical parameters that are required for detailed and final design cannot be precisely determined at early planning stages, crucial design parameters such as design discharge and hydraulic head have to be examined through an extensive optimisation process. One disadvantage inherent to commonly used deterministic analysis is the lack of objectivity for the selection of input parameters. Moreover, it cannot be ensured that the entire existing parameter ranges and all possible parameter combinations are covered. Probabilistic methods utilise discrete probability distributions or parameter input ranges to cover the entire range of uncertainties resulting from an information deficit during the planning phase and integrate them into the optimisation by means of an alternative calculation method. The investigated method assists with the mathematical assessment and integration of uncertainties into the rational economic appraisal of complex infrastructure projects. The assessment includes an exemplary verification to what extent the Random Set Theory can be utilised for the determination of input parameters that are relevant for the optimisation of hydropower projects and evaluates possible improvements with respect to accuracy and suitability of the calculated results. / Die Auslegung von Wasserkraftanlagen stellt einen komplexen Planungsablauf dar, mit dem Ziel das vorhandene Wasserkraftpotential möglichst vollständig zu nutzen und künftige, wirtschaftliche Erträge der Kraftanlage zu maximieren. Um dies zu erreichen und gleichzeitig die Genehmigungsfähigkeit eines komplexen Wasserkraftprojektes zu gewährleisten, besteht hierbei die zwingende Notwendigkeit eine Vielzahl für die Konzepterstellung relevanter Einflussfaktoren zu erfassen und in der Projektplanungsphase hinreichend zu berücksichtigen. In frühen Planungsstadien kann ein Großteil der für die Detailplanung entscheidenden, technischen und wirtschaftlichen Parameter meist nicht exakt bestimmt werden, wodurch maßgebende Designparameter der Wasserkraftanlage, wie Durchfluss und Fallhöhe, einen umfangreichen Optimierungsprozess durchlaufen müssen. Ein Nachteil gebräuchlicher, deterministischer Berechnungsansätze besteht in der zumeist unzureichenden Objektivität bei der Bestimmung der Eingangsparameter, sowie der Tatsache, dass die Erfassung der Parameter in ihrer gesamten Streubreite und sämtlichen, maßgeblichen Parameterkombinationen nicht sichergestellt werden kann. Probabilistische Verfahren verwenden Eingangsparameter in ihrer statistischen Verteilung bzw. in Form von Bandbreiten, mit dem Ziel, Unsicherheiten, die sich aus dem in der Planungsphase unausweichlichen Informationsdefizit ergeben, durch Anwendung einer alternativen Berechnungsmethode mathematisch zu erfassen und in die Berechnung einzubeziehen. Die untersuchte Vorgehensweise trägt dazu bei, aus einem Informationsdefizit resultierende Unschärfen bei der wirtschaftlichen Beurteilung komplexer Infrastrukturprojekte objektiv bzw. mathematisch zu erfassen und in den Planungsprozess einzubeziehen. Es erfolgt eine Beurteilung und beispielhafte Überprüfung, inwiefern die Random Set Methode bei Bestimmung der für den Optimierungsprozess von Wasserkraftanlagen relevanten Eingangsgrößen Anwendung finden kann und in wieweit sich hieraus Verbesserungen hinsichtlich Genauigkeit und Aussagekraft der Berechnungsergebnisse ergeben.

Page generated in 0.0315 seconds