• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 22
  • 17
  • 8
  • 6
  • 6
  • 5
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 77
  • 77
  • 16
  • 14
  • 14
  • 12
  • 12
  • 11
  • 10
  • 9
  • 8
  • 8
  • 7
  • 7
  • 7
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

The research that project finance was applied on power plants establishment

Chao, Yi-An 14 June 2000 (has links)
First,we discussed the profile of global project finance,including definition,model,and structure of project finance.Second,we discussed the situation on power plant industry.Third,we compare the difference of highway and power plant.We used a lot tables and charts on our essay.Fianlly,we consider that power plant should be suitable on project finance.And Boo is the better development model.
2

Financial engineering for civil/structural engineering projects

Strijdom, Jan Gerhardus 10 September 2012 (has links)
M.Phil. / The provision of adequate infrastructure and the economic growth of a country's highly interrelated population growth and rapid urbanization has placed enormous pressure on existing infrastructure. The provision of new and maintenance of existing infrastructure presents a challenge to the government. In South Africa infrastructure expenditure were generally funded directly from the country's fiscal budgets. Macroeconomic instability and growing investment requirements have shown that public financing is too volatile and rarely meets crucial infrastructure expenditure requirements in a timely and adequate manner. On the other hand, private sector organisations have a larger pool of sources from which to seek funding, equity investors, capital markets, banks etc., this can be from local to international markets. Therefore, private sector involvement in infrastructure provision has been widely used as a preferred method of financing these projects. The South African government can no longer carry the financial burden in it's fiscal policy to finance all the infrastructure projects needed in this country, and it is also up to the private sector to seek funding for projects that will be economical strong enough to service its own debt. Research objectivesobjectives of this study are to give a background of project financing by addressing the risks involved, finance structures, funding alternatives and strategies.
3

Infrastructure and project finance in Asia /

Lok, Sau-lan, Rita. January 1998 (has links)
Thesis (M.B.A.)--University of Hong Kong, 1998. / Includes bibliographical references (leaf 75-76).
4

Project Finance e coligação contratual: qualificação e consequências jurídicas / Project finance and connected contracts: qualification and legal effects

Silva, Raphael Andrade 18 September 2017 (has links)
A presente dissertação se propõe à qualificação do conjunto de contratos celebrados em financiamentos organizados sob a modalidade project finance como verdadeira coligação contratual, apresentando determinadas consequências jurídicas daí decorrentes, bem como sublinhando a correlação positiva entre tal compreensão e o estabelecimento de um panorama institucional adequado, que contribua para o desenvolvimento econômico. Ocupa posição nuclear no estudo o reconhecimento de que os negócios jurídicos concluídos no âmbito de tais programas de financiamento consistem, de fato, em instrumentos aptos a operacionalizar um arranjo de alocação de riscos que reflita a racionalidade econômico-financeira do projeto, garantindo, assim, sua viabilidade. Portanto, muito embora conservem sua autonomia estrutural e desempenhem, cada um deles, sua função econômico-social individual, contribuem, simultaneamente, para a realização de um fim concreto ulterior - operação econômica subjacente -, que coincide com o desenvolvimento e operação do empreendimento financiado. Pretende-se, igualmente, oferecer subsídios para que aqueles que sejam chamados a decidir sobre questões versando a temática abordada o façam de forma crítica e coerente, sem descuidar das motivações, econômicas e jurídicas, que subjazem ao project finance. / This thesis aims to qualify the nexus of contracts entered into in project financings as connected contracts, presenting certain legal effects which hence arise, as well as highlighting the positive correlation between such qualification and the establishment of an adequate institutional framework that contributes to economic development. It is fundamental to the study the acknowledgment that contracts entered into in such financings are, in fact, mechanisms that allow for the operationalization of a given risk allocation structure which, in turn, reflects the project\'s economic and financial rationale, therefore assuring its bankability. Accordingly, even though each contract conserves its structural autonomy and plays its own economic and social function, they all simultaneously contribute towards the achievement of a further concrete goal - an underlying economic transaction -, identified with the development and operation of the financed venture. Nonetheless, it intends to offer subsidies so that those called upon to decide issues related to the subject can fulfill their duties in an argumentative and coherent manner, without neglecting project finance\'s underlying economic and legal motivations.
5

Riscos de um investimento de Project Finance sob a ótica do financiador

Damasceno, Michele Cristina 31 July 2015 (has links)
Made available in DSpace on 2016-03-15T19:32:54Z (GMT). No. of bitstreams: 1 Michele Cristina Damascenoprot.pdf: 897011 bytes, checksum: 0acf261216bde1bfcca0b4b558dcd1c8 (MD5) Previous issue date: 2015-07-31 / In recent years we have witnessed an economic boom in the country through the expansion of its infrastructure covering roads, railways, ports, sanitation and energy. Through much of government concessions of infrastructure projects passed to the private sector, leaving private companies to construction, expansion, maintenance and / or operation of such enterprises. To make them feasible, companies had to make large investments and it resorted to financing from banks and investment funds. Such loans were only viable through the Project Finance modality, a financial engineering that divides risks among the sponsors of large projects. Thus, the research objective was to raise the main risks of financing the Project Finance modality in infrastructure projects in Brazil, not only those known and used in analysis models, but those that have been presented beyond the molds. To develop this study interviews were conducted with Caixa executives, literature review and questionnaire distributed to analysts who work in the market. Through the results we can infer that the risks go far beyond the existing listed in the bibliography. You can not treat a Project Finance as a commercial credit line with a list of pre-established premises where once were all fulfilled ensure the success of the financing. Such assumptions are conditions without which a Project Finance would not be granted, but by no means exhausted its risks, and market professionals should develop a critical sense more accurate, should look more carefully the conditions behind the premises. Thus, it is believed that the Project Finance funding model, respecting the risks found, can be used intensively for funders in order to continue providing development conditions to the national infrastructure. / Nos últimos anos temos testemunhado um crescimento econômico no país através da ampliação de sua infraestrutura que abrange rodovias, ferrovias, portos, saneamento e energia. Por meio das concessões do governo grande parte dos projetos de infraestrutura passaram para o âmbito privado, cabendo as empresas privadas a construção, ampliação, manutenção e/ou operação de tais empreendimentos. Para viabilizá-los as empresas precisaram fazer investimentos de grande porte e para isso recorreram a financiamentos junto a bancos e fundos de investimentos. Tais financiamentos só foram viáveis por meio da modalidade Project Finance, uma engenharia financeira que permite dividir os riscos entre os patrocinadores de projetos de grande porte. Assim, o objetivo da pesquisa foi levantar os principais riscos de um financiamento na modalidade Project Finance em projetos de infraestrutura no Brasil, não somente aqueles já conhecidos e utilizados em modelos de análise, mas aqueles que vêm se apresentando além dos moldes. Para o desenvolvimento deste estudo foram realizadas entrevistas com executivos da Caixa, análise bibliográfica e questionário distribuído a analistas que atuam no mercado. Por meio dos resultados podemos inferir que os riscos vão muito além dos elencados na bibliografia existente. Não se pode tratar um Project Finance como uma linha de credito comercial com uma lista de premissas pré-estabelecidas onde uma vez que foram todas cumpridas garantem o sucesso do financiamento. Tais premissas são condições sem as quais um Project Finance não seria concedido, entretanto de maneira alguma esgotam seus riscos, e os profissionais de mercado devem desenvolver um senso critico mais apurado, devem olhar com mais cuidado as condições que se encontram atrás das premissas. Deste modo, acredita-se que o modelo de financiamento Project Finance, respeitando os riscos encontrados, possa ser utilizado de forma intensa por financiadores, de modo a continuar proporcionando condições de desenvolvimento à infraestrutura nacional.
6

A study of project finance in Asia with emphasis on private infrastructure project finance

Kathri, Achchige Kapila Devapriyaa. January 2003 (has links)
published_or_final_version / Real Estate and Construction / Doctoral / Doctor of Philosophy
7

Techno-economic analysis of nuclear project management in South Africa / Kit Fung Jeffrey Chan

Chan, Kit Fung Jeffrey January 2014 (has links)
This research report is a techno-economic analysis of the nuclear project management capacity in South Africa. It will focus on the project development phases of the nuclear expansion programme. The author has nuclear engineering training background and also currently involved in the Eskom new build programme (Medupi & Kusile) and the coal refurbishment projects. The following thinking philosophy is used to structure this research report: * Project management practise for nuclear projects globally * Project management practise for major Eskom projects in South Africa * The differences between South Africa and international project management practises * Guideline for project management in the nuclear environment for possible implementation of the nuclear expansion programme. The project life cycle has different phases, namely, project setup and planning phase, project design and engineering phase, and project execution phase. The first two phases were discussed and analyzed in detail. The project execution phase was also discussed, however, due to the limited time, the execution phase will not be analyzed in detail. Further research is recommended on the execution phase. At the end of this research report, a guideline for nuclear project management is developed and associated with some recommendations. This guideline can certainly assist Eskom or other potential NPP developer to understand all the critical aspects in a nuclear expansion programme. / MIng (Mechanical Engineering), North-West University, Potchefstroom Campus, 2014
8

Le partenariat public-privé en infrastructure : évaluation de la performance administrative et des effets démocratiques dans le contexte québécois

Hudon, Pierre-André 28 February 2013 (has links)
Le partenariat public-privé (PPP) est un mode d’approvisionnement gouvernemental qui combine, en une seule entente contractuelle à long terme, toutes les étapes traditionnelles de la réalisation d’une infrastructure : la conception, la construction, l’exploitation, l’entretien et le financement. Au Québec, la décision d’utiliser le mode PPP a été accompagnée d’une série de réformes légales, réglementaires et institutionnelles. Ces réformes ont profondément bouleversé la manière de réaliser les grands projets d’infrastructure. Or, il semble que peu d’analyses aient été effectuées quant aux impacts de ces changements sur la gouvernance démocratique de l’approvisionnement en infrastructure. Cette thèse se penche donc sur le PPP en tant que mécanisme d’approvisionnement, mais aussi en tant que point de départ d’une série de réformes administratives venant influencer considérablement la gouvernance de l’approvisionnement gouvernemental. Le document propose d’abord une relecture et une redéfinition de la gouvernance démocratique à partir de la théorie des études critiques en management et de la théorie des instruments d’action publique. Les réformes récentes de l’administration publique québécoise y sont examinées à la lumière de cette redéfinition. Les politiques d’approvisionnement, ainsi que les critères d’appréciation qui leur sont propres, sont aussi étudiés à la lumière de la théorie critique. Ensuite, de façon plus précise, le mode PPP est étudié en partant de ses origines et des raisons qui ont mené à son adoption. D’un point de vue empirique, trois cas pratiques sont examinés afin de produire, d’une part, une évaluation de la performance administrative du mode PPP et, d’autre part, une caractérisation de ses effets démocratiques. Une attention particulière est portée au mécanisme du « comparateur public », qui fait l’objet d’une analyse financière critique. La thèse en arrive aux conclusions suivantes : D’abord, au niveau micro, soit celui du fonctionnement interne des PPP, les conséquences suivantes sont observables : une définition des besoins plus rigoureuse, mais contraignante à long terme; des économies difficiles à démontrer; une dynamique de confrontation et non de partenariat entre acteurs privés et publics; un entretien contractuellement garanti qui présente un avantage réel étant donné la tendance bien documentée des gouvernements à mal entretenir les infrastructures; et des risques financiers réels, mais pouvant être atténués notamment par le montage financier. Ensuite, au niveau meso, soit celui de l’arrimage avec les principes de la gouvernance démocratique, les conséquences de la mise en œuvre de la politique québécoise des PPP sont les suivantes : un discours trompeur sur les économies réelles, notamment par l’utilisation d’une méthodologie d’analyse financière ambiguë; un modèle de prise de décision laissant place à l’intervention politique illégitime; des difficultés quant à la gestion à long terme des incertitudes; et une imputabilité rendue plus difficile par la contractualisation. Finalement, au niveau macro, soit celui de la redéfinition du rôle de l’État induit par la mise en œuvre de la politique sur les PPP, les conséquences sont les suivantes: une dérive de la gouvernance vers une forme illégitime de contrôle politique; un modèle néolibéral de partenariat non-observable dans la pratique et s’effaçant plutôt au profit d’une logique de compétition classique; et une modernisation inachevée, reposant sur les principes de la gouvernementalité managériale plutôt que sur ceux de la rationalité communicationnelle. La thèse se conclut, au dernier chapitre, par une redéfinition critique de la gouvernance de l’approvisionnement gouvernemental. Cette redéfinition s’appuie sur un certain nombre de propositions de recherche pouvant servir de base à une réforme de la politique d’approvisionnement en infrastructure.
9

Techno-economic analysis of nuclear project management in South Africa / Kit Fung Jeffrey Chan

Chan, Kit Fung Jeffrey January 2014 (has links)
This research report is a techno-economic analysis of the nuclear project management capacity in South Africa. It will focus on the project development phases of the nuclear expansion programme. The author has nuclear engineering training background and also currently involved in the Eskom new build programme (Medupi & Kusile) and the coal refurbishment projects. The following thinking philosophy is used to structure this research report: * Project management practise for nuclear projects globally * Project management practise for major Eskom projects in South Africa * The differences between South Africa and international project management practises * Guideline for project management in the nuclear environment for possible implementation of the nuclear expansion programme. The project life cycle has different phases, namely, project setup and planning phase, project design and engineering phase, and project execution phase. The first two phases were discussed and analyzed in detail. The project execution phase was also discussed, however, due to the limited time, the execution phase will not be analyzed in detail. Further research is recommended on the execution phase. At the end of this research report, a guideline for nuclear project management is developed and associated with some recommendations. This guideline can certainly assist Eskom or other potential NPP developer to understand all the critical aspects in a nuclear expansion programme. / MIng (Mechanical Engineering), North-West University, Potchefstroom Campus, 2014
10

Le partenariat public-privé en infrastructure : évaluation de la performance administrative et des effets démocratiques dans le contexte québécois

Hudon, Pierre-André 28 February 2013 (has links)
Le partenariat public-privé (PPP) est un mode d’approvisionnement gouvernemental qui combine, en une seule entente contractuelle à long terme, toutes les étapes traditionnelles de la réalisation d’une infrastructure : la conception, la construction, l’exploitation, l’entretien et le financement. Au Québec, la décision d’utiliser le mode PPP a été accompagnée d’une série de réformes légales, réglementaires et institutionnelles. Ces réformes ont profondément bouleversé la manière de réaliser les grands projets d’infrastructure. Or, il semble que peu d’analyses aient été effectuées quant aux impacts de ces changements sur la gouvernance démocratique de l’approvisionnement en infrastructure. Cette thèse se penche donc sur le PPP en tant que mécanisme d’approvisionnement, mais aussi en tant que point de départ d’une série de réformes administratives venant influencer considérablement la gouvernance de l’approvisionnement gouvernemental. Le document propose d’abord une relecture et une redéfinition de la gouvernance démocratique à partir de la théorie des études critiques en management et de la théorie des instruments d’action publique. Les réformes récentes de l’administration publique québécoise y sont examinées à la lumière de cette redéfinition. Les politiques d’approvisionnement, ainsi que les critères d’appréciation qui leur sont propres, sont aussi étudiés à la lumière de la théorie critique. Ensuite, de façon plus précise, le mode PPP est étudié en partant de ses origines et des raisons qui ont mené à son adoption. D’un point de vue empirique, trois cas pratiques sont examinés afin de produire, d’une part, une évaluation de la performance administrative du mode PPP et, d’autre part, une caractérisation de ses effets démocratiques. Une attention particulière est portée au mécanisme du « comparateur public », qui fait l’objet d’une analyse financière critique. La thèse en arrive aux conclusions suivantes : D’abord, au niveau micro, soit celui du fonctionnement interne des PPP, les conséquences suivantes sont observables : une définition des besoins plus rigoureuse, mais contraignante à long terme; des économies difficiles à démontrer; une dynamique de confrontation et non de partenariat entre acteurs privés et publics; un entretien contractuellement garanti qui présente un avantage réel étant donné la tendance bien documentée des gouvernements à mal entretenir les infrastructures; et des risques financiers réels, mais pouvant être atténués notamment par le montage financier. Ensuite, au niveau meso, soit celui de l’arrimage avec les principes de la gouvernance démocratique, les conséquences de la mise en œuvre de la politique québécoise des PPP sont les suivantes : un discours trompeur sur les économies réelles, notamment par l’utilisation d’une méthodologie d’analyse financière ambiguë; un modèle de prise de décision laissant place à l’intervention politique illégitime; des difficultés quant à la gestion à long terme des incertitudes; et une imputabilité rendue plus difficile par la contractualisation. Finalement, au niveau macro, soit celui de la redéfinition du rôle de l’État induit par la mise en œuvre de la politique sur les PPP, les conséquences sont les suivantes: une dérive de la gouvernance vers une forme illégitime de contrôle politique; un modèle néolibéral de partenariat non-observable dans la pratique et s’effaçant plutôt au profit d’une logique de compétition classique; et une modernisation inachevée, reposant sur les principes de la gouvernementalité managériale plutôt que sur ceux de la rationalité communicationnelle. La thèse se conclut, au dernier chapitre, par une redéfinition critique de la gouvernance de l’approvisionnement gouvernemental. Cette redéfinition s’appuie sur un certain nombre de propositions de recherche pouvant servir de base à une réforme de la politique d’approvisionnement en infrastructure.