• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 6
  • Tagged with
  • 6
  • 6
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Fatores de influência na definição de modalidades de contratação em projetos. / Factors influencing the choice of contract types in projects.

Ferrari, Onevair 19 December 2011 (has links)
No contexto atual de competitividade e racionalização nos negócios, a maioria das organizações não dispõe de todos os recursos necessários para a realização de seus projetos, requerendo a participação de fornecedores de materiais, equipamentos, serviços, sistemas, soluções e, até mesmo, de todo o projeto. Isto faz com que a escolha da modalidade de contratação mais adequada a cada item ou pacote a ser adquirido no mercado tenha efeitos determinantes sobre os prazos, custos, qualidade, riscos e esforços, podendo contribuir significativamente para o sucesso do projeto. Como esta escolha geralmente é feita com base nas regras de uso das modalidades, as opções acabam se restringindo a modalidades cujas regras são mais conhecidas. É possível, porém, utilizar um conjunto de fatores que, uma vez identificados, podem facilitar a escolha de modalidades mais adequadas. Este trabalho apresenta as principais características de um espectro amplo de modalidades de contratação aplicáveis em projetos, identifica os principais fatores que influenciam na escolha das modalidades e propõe uma abordagem estruturada para a escolha da modalidade de contratação, partindo das características do projeto e do ambiente em que é realizado e não das complexas regras de uso das modalidades. A aplicação de um modelo operacional resultante desta abordagem estruturada permitiu demonstrar, através de simulações de campo, que embora existam aspectos específicos de cada projeto, é possível identificar um conjunto de fatores que possibilitam definir a modalidade de contratação mais adequada em cada aquisição do projeto. / In the current context of competitiveness and rationalization in business, most of the organizations do not have all the necessary resources to develop their projects, requiring the participation of suppliers of materials, equipment, services, systems, solutions or even the whole project. Thanks to this, the choice on contract type for each item or package to be purchased on the market has determinant effects on schedule, costs, quality, risks and efforts, and can contribute decisively to success of the project. As this choice is usually based on rules of use of the contract types, the options are frequently restricted to those contract types whose rules are known. However, it is possible to use a set of factors that, once identified, can facilitate the choice of most appropriate contract types. This thesis presents the main characteristics of a broad spectrum of contract types applicable in projects, identifies the main factors influencing the decision of contract types and proposes a structured approach for choosing the type of contract, based on project characteristics and environment instead of the complex rules of use of the contract types. Field simulations using an operational model resulting from this structured approach allowed to show that, although there are specific aspects in every project, it is possible to identify a set of factors that help define the appropriate type of contract for each project acquisition.
2

Uma Análise sobre os aditivos de contratos em obras rodoviárias no Estado do Ceará / An analysis on the additives of contracts in road works in the State of Ceará

Lopes, Caio Petronios de Araújo January 2017 (has links)
LOPES, Caio Petrônios de Araújo. Uma Análise sobre os aditivos de contratos em obras rodoviárias no Estado do Ceará. 2017. 113 f. Dissertação (Mestrado em Engenharia de Transportes) – Centro de Tecnologia, Universidade Federal do Ceará, Fortaleza, 2017. / Submitted by Hohana Sanders (hohanasanders@hotmail.com) on 2017-03-24T16:42:17Z No. of bitstreams: 1 2017_dis_cpalopes.pdf: 1653754 bytes, checksum: 9159587ef48b3eb4db8abfbfa1fdadc7 (MD5) / Approved for entry into archive by Marlene Sousa (mmarlene@ufc.br) on 2017-04-27T18:48:26Z (GMT) No. of bitstreams: 1 2017_dis_cpalopes.pdf: 1653754 bytes, checksum: 9159587ef48b3eb4db8abfbfa1fdadc7 (MD5) / Made available in DSpace on 2017-04-27T18:48:26Z (GMT). No. of bitstreams: 1 2017_dis_cpalopes.pdf: 1653754 bytes, checksum: 9159587ef48b3eb4db8abfbfa1fdadc7 (MD5) Previous issue date: 2017 / In roadworks, the occurrence of contractual amendment formalizations, hereby referred to as deviations, is strong evidence of deficiencies in the project and inadequate planning done by the Public Administration. In this study, roadwork contractual amendments in the State of Ceará were analyzed, under a risk management perspective. The methodology was realized through a case study, with a sample of 220 roadwork contracts, completed in the 2008-2015 period, managed by the State Roadworks Department – DER. The data follow an unusual distribution. The documents and files of the projects were obtained in institutional websites, where the project variables were extracted for tabulation and the Spearman coefficient subsidized the measurement of its correlation with the deviations. For the evaluation of the project’s risks, a survey was created to be applied to Works Inspectors. However, its application was made nonviable. The deviations reach 55% of contracts, 45% being cost deviations with an 8.5% rate of overshoot, representing an additional R$231 million. The deadline deviations occur in 34% of contracts, with a 15,7% rate of overshoot, representing an additional 14.050 days. Results indicate a strong correlation among cost deviations and the initial value of the contract, the initial work deadline and estimated value in the public bid, in such a way that, the greater these values, the greater will be the value of the cost amendments. Larger projects show a trend of impacting the values of the deviations more pronouncedly, whereas smaller projects are the ones who impact the percentage of values more. In deadline deviations, the most significant variables are the estimated value in the bid, the percentage and the readjustment value amount, respectively. The cost estimates have not shown to become more precise over the years and the cost underestimation happens more frequently, however, an improvement in deadline estimates was observed. We remark that most projects incur more frequently in increases than in suppressions, indicating asymmetry in cost overshoot. One should note that about 60% of basic project budgets do not have adequate precision margins even to be taken to bid. As to the location of the work, particular attention is drawn to the fact that contracts show a greater tendency to cost and deadline underestimations, especially Maranguape and Sobral, which could be explained by the presence of contracts with more significant values and by the size of the highway network as well as the number of municipalities under its jurisdiction, respectively. As such, Public Administration must improve its governance mechanisms toward one that prioritizes foresight and project development, where risk assessment must be inserted at the heart of manager’s planning for decision making, so as to mitigate contractual amendments. / Em obras rodoviárias a incidência de formalização de aditivos contratuais, denominados aqui de desvios, é uma forte evidência da deficiência do projeto e do planejamento inadequado realidada pela Administração Pública. Neste trabalho analisam-se os aditivos contratuais em obras rodoviárias no Estado do Ceará, sob o viés da gestão de riscos. A metodologia foi realizada por meio de estudo de caso, com amostra de 220 contratos de obras rodoviárias, concluídos no período de 2008 a 2015, geridos pelo Departamento Estadual de Rodovias – DER. Os dados seguem uma distribuição anormal. Obtiveram-se os documentos e arquivos dos projetos em sites institucionais, na qual foram extraídas as variáveis de projeto para tabulação e o coeficiente de Spearman subsidiou a aferição de sua correlação com os desvios. Para avaliação dos riscos de projeto foi criado um questionário a ser aplicado com os fiscais de obra. Entretanto, a sua aplicação foi inviabilizada. Os desvios atingem 55% dos contratos, sendo 45% com desvios de custo e taxa de superação e 8,5%, representando um acréscimo de R$231 milhões. Os desvios de prazo ocorrem em 34% dos contratos, com taxa de superação de 15,7%, representando um acréscimo de 14.050 dias. Os resultados indicam que há uma forte correlação entre os desvios de custo com o valor inicial do contrato, o prazo inicial da obra e o valor estimado na licitação, de modo que quanto maior for esses valores, maior será o valor do aditivo de custo. Os projetos maiores apresentam uma tendência de impactar nos valores dos desvios de forma mais acentuada, enquanto que os projetos menores são os que mais impactam nos percentuais dos valores de desvios. No desvio de prazo as variáveis mais significativas é o valor estimado na licitação, o percentual e o montante do valor do reajuste, respectivamente. As estimativas de custo não se mostraram mais precisas ao longo dos anos e a subestimação dos custos ocorre com maior frequência, no entanto foi observada uma melhora nas estimativas de prazo. Observa-se que a maioria dos projetos incorre com maior frequência em acréscimos que em supressões, indicando assimetria na superação de custo. Ressalta-se que cerca de 60% dos orçamentos do projeto básico não apresentam margem de precisão adequada para, sequer, serem licitados. Quanto à localização da obra verifica-se que os contratos apresentam uma maior tendência de subestimativas de custo e de prazo, com destaque para Maranguape e Sobral, que pode ser explicado pela presença de contratos com valores mais expressivos e pelo tamanho da malha rodoviária assim como no número de municípios sob sua jurisdição, respectivamente. Assim, a Administração Pública deve melhorar os mecanismos de governança para uma que priorize a previsão e desenvolvimento de projetos, em que a análise de riscos deve ser inserida no centro do planejamento para tomada de decisão dos gestores, de forma a mitigar os desvios contratuais.
3

Fatores de influência na definição de modalidades de contratação em projetos. / Factors influencing the choice of contract types in projects.

Onevair Ferrari 19 December 2011 (has links)
No contexto atual de competitividade e racionalização nos negócios, a maioria das organizações não dispõe de todos os recursos necessários para a realização de seus projetos, requerendo a participação de fornecedores de materiais, equipamentos, serviços, sistemas, soluções e, até mesmo, de todo o projeto. Isto faz com que a escolha da modalidade de contratação mais adequada a cada item ou pacote a ser adquirido no mercado tenha efeitos determinantes sobre os prazos, custos, qualidade, riscos e esforços, podendo contribuir significativamente para o sucesso do projeto. Como esta escolha geralmente é feita com base nas regras de uso das modalidades, as opções acabam se restringindo a modalidades cujas regras são mais conhecidas. É possível, porém, utilizar um conjunto de fatores que, uma vez identificados, podem facilitar a escolha de modalidades mais adequadas. Este trabalho apresenta as principais características de um espectro amplo de modalidades de contratação aplicáveis em projetos, identifica os principais fatores que influenciam na escolha das modalidades e propõe uma abordagem estruturada para a escolha da modalidade de contratação, partindo das características do projeto e do ambiente em que é realizado e não das complexas regras de uso das modalidades. A aplicação de um modelo operacional resultante desta abordagem estruturada permitiu demonstrar, através de simulações de campo, que embora existam aspectos específicos de cada projeto, é possível identificar um conjunto de fatores que possibilitam definir a modalidade de contratação mais adequada em cada aquisição do projeto. / In the current context of competitiveness and rationalization in business, most of the organizations do not have all the necessary resources to develop their projects, requiring the participation of suppliers of materials, equipment, services, systems, solutions or even the whole project. Thanks to this, the choice on contract type for each item or package to be purchased on the market has determinant effects on schedule, costs, quality, risks and efforts, and can contribute decisively to success of the project. As this choice is usually based on rules of use of the contract types, the options are frequently restricted to those contract types whose rules are known. However, it is possible to use a set of factors that, once identified, can facilitate the choice of most appropriate contract types. This thesis presents the main characteristics of a broad spectrum of contract types applicable in projects, identifies the main factors influencing the decision of contract types and proposes a structured approach for choosing the type of contract, based on project characteristics and environment instead of the complex rules of use of the contract types. Field simulations using an operational model resulting from this structured approach allowed to show that, although there are specific aspects in every project, it is possible to identify a set of factors that help define the appropriate type of contract for each project acquisition.
4

Aquisições, contratações e suprimentos em projetos: um modelo para avaliação das práticas de gestão. / Procurement, contracting and supplying in projects: a model for management practices assessment.

Ferrari, Onevair 10 November 2006 (has links)
O gerenciamento de aquisições vem se tornando um dos aspectos mais importantes do gerenciamento de projetos, acompanhando a tendência das organizações de se dedicarem mais à sua vocação competitiva e passarem a adquirir de fontes externas os recursos, materiais, equipamentos, sistemas, soluções e serviços necessários à realização de seus projetos. Esta tendência tem feito com que, num número cada vez maior de projetos, a organização empreendedora realize grande parte e, às vezes todo o projeto, através de organizações externas. Neste contexto, a equipe do projeto gerencia, na verdade, um portfolio de fornecimentos aos quais tem que aplicar metodologias, técnicas e ferramentas de todas as demais áreas de conhecimento do gerenciamento de projetos. Não obstante sua crescente importância, o gerenciamento de aquisições em projetos é um tema relativamente pouco coberto pela bibliografia de gerenciamento de projetos e sua terminologia é pouco consensual. Este trabalho destaca a crescente importância do gerenciamento de aquisições em projetos, sintetizando os processos, técnicas e ferramentas reconhecidas atualmente como as melhores práticas nesta área de conhecimento. Foi desenvolvido um modelo de maturidade específico para gerenciamento de aquisições em projetos, com o objetivo de aferir o alinhamento entre o que é praticado nas empresas e as melhores práticas apresentadas nas principais referências bibliográficas. Através do estudo de casos de três empresas com forte atuação em projetos, foi possível aferir o alinhamento de suas práticas com um padrão previamente estabelecido, aplicando e validando o modelo desenvolvido. A pesquisa permitiu, também, avaliar o reconhecimento da importância do gerenciamento de aquisições nas empresas pesquisadas, bem como o grau de consenso na terminologia utilizada em seus processos de aquisições. / Procurement management has became one of the most important aspects in project management, accompanying the trend to focus organizations in their core business, and therefore contracting resources, materials, equipments, systems, solutions and services from external sources, to have their projects accomplished. This trend results that in a crescent number of projects, the performing organization gets a considerable part of the project, and sometimes the whole project, done by external sources. In this context, the project team manages, in fact, a portfolio of sourcing projects, to which it is necessary to apply methodology, tools and techniques from all others knowledge areas of project management. Nevertheless its increasing importance, project procurement management is a subject poor covered by project management references and its terminology is not consensual. This work emphasizes the growing importance of project procurement management and synthesizes the processes, tools and techniques actually recognized as best practices in this knowledge area. A maturity model specifically to project procurement management has been developed to evaluate the alignment level of what is being done in real world companies with the best practices presented by the most representative references. Through case studies of three companies that perform projects consistently, it was possible to evaluate the alignment of their practices with a standard previously set, applying and validating the model. The research also has allowed gauging the recognition of the procurement management importance within the researched companies, as well as the grade of consensus on the terminology used in their acquisition processes.
5

Aquisições, contratações e suprimentos em projetos: um modelo para avaliação das práticas de gestão. / Procurement, contracting and supplying in projects: a model for management practices assessment.

Onevair Ferrari 10 November 2006 (has links)
O gerenciamento de aquisições vem se tornando um dos aspectos mais importantes do gerenciamento de projetos, acompanhando a tendência das organizações de se dedicarem mais à sua vocação competitiva e passarem a adquirir de fontes externas os recursos, materiais, equipamentos, sistemas, soluções e serviços necessários à realização de seus projetos. Esta tendência tem feito com que, num número cada vez maior de projetos, a organização empreendedora realize grande parte e, às vezes todo o projeto, através de organizações externas. Neste contexto, a equipe do projeto gerencia, na verdade, um portfolio de fornecimentos aos quais tem que aplicar metodologias, técnicas e ferramentas de todas as demais áreas de conhecimento do gerenciamento de projetos. Não obstante sua crescente importância, o gerenciamento de aquisições em projetos é um tema relativamente pouco coberto pela bibliografia de gerenciamento de projetos e sua terminologia é pouco consensual. Este trabalho destaca a crescente importância do gerenciamento de aquisições em projetos, sintetizando os processos, técnicas e ferramentas reconhecidas atualmente como as melhores práticas nesta área de conhecimento. Foi desenvolvido um modelo de maturidade específico para gerenciamento de aquisições em projetos, com o objetivo de aferir o alinhamento entre o que é praticado nas empresas e as melhores práticas apresentadas nas principais referências bibliográficas. Através do estudo de casos de três empresas com forte atuação em projetos, foi possível aferir o alinhamento de suas práticas com um padrão previamente estabelecido, aplicando e validando o modelo desenvolvido. A pesquisa permitiu, também, avaliar o reconhecimento da importância do gerenciamento de aquisições nas empresas pesquisadas, bem como o grau de consenso na terminologia utilizada em seus processos de aquisições. / Procurement management has became one of the most important aspects in project management, accompanying the trend to focus organizations in their core business, and therefore contracting resources, materials, equipments, systems, solutions and services from external sources, to have their projects accomplished. This trend results that in a crescent number of projects, the performing organization gets a considerable part of the project, and sometimes the whole project, done by external sources. In this context, the project team manages, in fact, a portfolio of sourcing projects, to which it is necessary to apply methodology, tools and techniques from all others knowledge areas of project management. Nevertheless its increasing importance, project procurement management is a subject poor covered by project management references and its terminology is not consensual. This work emphasizes the growing importance of project procurement management and synthesizes the processes, tools and techniques actually recognized as best practices in this knowledge area. A maturity model specifically to project procurement management has been developed to evaluate the alignment level of what is being done in real world companies with the best practices presented by the most representative references. Through case studies of three companies that perform projects consistently, it was possible to evaluate the alignment of their practices with a standard previously set, applying and validating the model. The research also has allowed gauging the recognition of the procurement management importance within the researched companies, as well as the grade of consensus on the terminology used in their acquisition processes.
6

Os efeitos das competências no desempenho de contratos de terceirização de serviços no setor público

Bonelli, Francesco 31 March 2017 (has links)
Submitted by Biblioteca de Adminsitração (bibadm@ufba.br) on 2017-07-25T11:06:15Z No. of bitstreams: 1 FRANCESCO BONELLI.pdf: 1650250 bytes, checksum: 0a086a94dc4401e2fa69f82864059f63 (MD5) / Approved for entry into archive by Maria Angela Dortas (dortas@ufba.br) on 2017-07-25T13:39:55Z (GMT) No. of bitstreams: 1 FRANCESCO BONELLI.pdf: 1650250 bytes, checksum: 0a086a94dc4401e2fa69f82864059f63 (MD5) / Made available in DSpace on 2017-07-25T13:39:55Z (GMT). No. of bitstreams: 1 FRANCESCO BONELLI.pdf: 1650250 bytes, checksum: 0a086a94dc4401e2fa69f82864059f63 (MD5) / Esta pesquisa, de caráter exploratório e natureza quantitativa, investigou os efeitos de competências públicas –inerentes aos agentes públicos – e privadas – inerentes às empresas prestadoras de serviços – sobre o custo e a qualidade das relações contratuais envolvendo firmas e governos, com o intuito de contribuir para a literatura de Estratégia em Organizações aplicada à Gestão Pública e de auxiliar a tomada de decisão dos gestores públicos. Para tanto, foram estudados 167 contratos estipulados por uma entidade da Administração Pública Federal (neste caso, a Universidade Federal da Bahia), no período de 2002 a 2015, os quais abrangiam serviços de recepção, portaria, vigilância, limpeza, transporte e manutenção, entre outros. Os dados, organizados em uma base específica que foi construída por meio de pesquisa documental, foram analisados mediante técnicas estatísticas, como o método dos mínimos quadrados ponderados, probit e probit ordenado. Com relação às competências públicas, o estudo evidenciou que, diante de um ambiente caracterizado por incentivos modestos para os funcionários e por um baixo nível de competição entre as empresas, a remuneração, a formação e a experiência dos agentes públicos possuem efeitos nulos, limitados ou contraditórios no desempenho dos contratos de serviços, particularmente nos indicadores de custo. No tocante às competências privadas, se verificou que a experiência das empresas no seu setor de atividade e, especialmente, no setor público influencia positivamente nos indicadores de qualidade; e que as capacidades financeiras – em particular aquelas medidas pela liquidez geral – podem afetar negativamente os indicadores de custo. Esses resultados contribuem para avanços na discussão científica sobre a identificação de fatores capazes de explicar o custo e a qualidade das contratações públicas. / ABSTRACT This research, of exploratory character and quantitative nature, investigated the effects of public capabilities – inherent to public agents – and private capabilities – inherent to service providers – on cost and quality of contractual relations involving firms and governments, with the aim of contributing to Strategy literature applied to Public Management and to assist the decision-making of public managers. To do so, 167 contracts stipulated by a Federal Public Administration entity (in this case, the Federal University of Bahia), in a period ranging from 2002 to 2015, covering reception, concierge, security, cleaning, transportation and maintenance services, among others, were studied. The data, organized in a specific dataset that was constructed through documentary research, were analyzed using statistical techniques, such as the weighted least squares method, probit and ordered probit. With regard to public capabilities, the study showed that, in the face of an environment characterized by modest incentives for employees and a low level of competition between companies, public agents’ wage, background and experience have limited or contradictory effects, or no effects at all, on the performance of service contracts, particularly on cost indicators. With respect to private capabilities, the research verified that companies’ experience in their sector of activity and especially in the public sector has a positive influence on quality indicators; and that financial capacities – particularly those measured by general liquidity – can adversely affect cost indicators. These results contribute to advances in the scientific discussion about the identification of factors capable of explaining cost and quality of public contracting.

Page generated in 0.1275 seconds