• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 25
  • 5
  • 4
  • 3
  • 1
  • 1
  • 1
  • Tagged with
  • 45
  • 45
  • 23
  • 17
  • 8
  • 8
  • 8
  • 7
  • 7
  • 7
  • 7
  • 6
  • 6
  • 6
  • 6
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Regras de verificação e validação de modelos BIM para sistemas prediais hidráulicos e sanitários. / Rules of verification and validation of BIM models for sanitary hydraulic building installations.

Takagaki, Carolina Yumi Kubo 10 June 2016 (has links)
A complexidade das atuais edificações e, consequentemente, a divisão dos projetos em especialidades e subsistemas evidenciam as dificuldades do coordenador de projetos em gerenciar todo o processo de projeto. Há necessidade de um fluxo contínuo de troca de informações e de comunicação entre os envolvidos. A prática do BIM (Building Information Modeling) e o emprego de suas ferramentas computacionais propiciam aos projetistas a agilidade e precisão no desenvolvimento do projeto, uma vez que possibilita, por exemplo, uma visualização da interação de todos os subsistemas do edifício. No entanto, o cenário atual da tecnologia não provê ferramentas para todos os fluxos de trabalho necessários, e quando fornece, nem sempre o software disponível segue as normas específicas para determinada aplicação em certo país. As normas técnicas estabelecem requisitos e recomendações relativos ao projeto e devem ser observadas por projetistas para a segurança e qualidade das edificações. Neste sentido, o objetivo desta pesquisa é desenvolver regras de verificação e validação de modelos BIM para sistemas prediais com base em normas técnicas brasileiras, tais como a de sistemas prediais de água, de esgoto sanitário e de águas pluviais. O método empregado considera o levantamento das recomendações normativas e suas respectivas transformações em regras que possam ser verificadas automaticamente por meio de programas de computador. O programa adotado foi o software Solibri Model Checker (SMC), que faz uso de modelos em Industry Foundation Classes (IFC). Os resultados mostram que regras simples de comparação e relacionadas a propriedades de cada elemento são possíveis de serem parametrizadas no SMC e têm resultados sólidos de fácil visualização, o que permite uma correção mais rápida e dinâmica por parte dos projetistas e coordenadores de projeto. Para regras mais complexas, necessitou-se da criação de ferramentas paralelas ao SMC. Constata-se que o SMC ainda é incompleto quando se trata da análise de projetos de sistemas prediais hidráulicos e sanitários, porém é possível desenvolvê-las uma vez que o modelo em IFC pode conter todas as informações necessárias às análises. Assim, verifica-se a necessidade de que os projetos BIM contenham as informações e obedeçam a padrões de modelagem para que possam ser utilizados na verificação de regras de modo eficiente. Por fim, os resultados desta pesquisa contribuem para o emprego do BIM no desenvolvimento e análise de projeto de sistemas prediais hidráulicos e sanitários com maior precisão, agilidade e qualidade. / The complexity of existing buildings and, consequently, the division of projects and sub-specialties highlight the difficulties the project coordinator to manage the entire design process. There is a need for a continuous flow of information exchange and communication among stakeholders. The practice of BIM (Building Information Modeling) and the use of their computational tools provide designers the speed and accuracy in the development of the project, as it enables, for example, a preview of the interaction of all building subsystems. However, the current technology landscape does not provide tools for all to workflows required, and when it does, they do not always follow standards a specific application in a given country. The technical standards contain requirements and recommendations relating to the project and must be observed by designers for the safety and quality of the buildings. In this sense, the objective of this research is to develop procedures for verification and validation of BIM models for building systems based on Brazilian technical standards, such as building systems for water, sanitary sewer and storm water. The employed method considers the collection of policy recommendations and their changes in rules that can be automatically checked using computer programs. The adopted program was Solibri Model Checker software (SMC), which makes use of models in Industry Foundation Classes (IFC). The results show that simple comparison rules and related properties of each element are able to be parameterized in the SMC and have solid results for easy viewing, allowing faster correction and dynamic on the part of designers and design engineers. For more complex rules the creation of parallel tools to SMC is needed. It appears that the SMC is still incomplete when it comes to the analysis of hydraulic and sanitary building systems projects, but you can develop them as the model in IFC can contain all the necessary information to the analysis. Thus, there is a need that the BIM projects contain the information and comply with standards for modeling which can be used to verify rules efficiently. Finally, the results of this research contribute to the use of BIM in the development and design analysis of hydraulic building systems and toilets with greater accuracy, speed and quality.
12

Modelo conceitual para comissionamento de sistemas prediais. / Conceptual model for building systems commissioning.

Christianne dos Santos Figueiredo Ishida 19 November 2015 (has links)
Atualmente, os edifícios, em função dos avanços tecnológicos dos sistemas prediais, necessitam de maior planejamento, detalhamento de projetos, controles de execução e treinamento dos profissionais de operação e manutenção para atender os requisitos de projeto do proprietário, que têm como premissa os conceitos de sustentabilidade, qualidade e desempenho. A presença dos sofisticados sistemas de controle contribui para facilitar o gerenciamento de insumos como água e energia, porém pequenas falhas podem levar a grandes falhas de desempenho. As falhas na concepção dos edifícios têm início com a má interpretação, por parte da equipe técnica, dos requisitos dos proprietários. Assim, é necessário que na concepção do edifício sejam verificados todos os requisitos solicitados pelos proprietários para o edifício durante o seu ciclo de vida. A falha da comunicação percorre toda a cadeia produtiva do edifício gerando falhas de planejamento, projeto, execução e manutenção. O comissionamento é um processo para atender aos requisitos de projeto do proprietário, documentar as fases do ciclo de vida dos edifícios, capacitar os profissionais de operação e manutenção, com o objetivo de evitar as falhas, diminuir desperdícios e retrabalhos, melhorar a qualidade, o desempenho e a sustentabilidade dos edifícios. O comissionamento é mais difundido em sistemas prediais de ar condicionado e de iluminação tendo como meta a alta eficiência energética e a economia de água, sendo pouco utilizado no Brasil. Neste contexto, o objetivo desta pesquisa é propor um modelo conceitual de comissionamento para sistemas prediais. A metodologia adotada para o desenvolvimento do modelo, utiliza a pesquisa bibliográfica como procedimento técnico. Para elucidar em que fase o comissionamento é aplicado, este foi relacionado com os outros conceitos utilizados no ciclo de vida do edifício como a coordenação de projeto, o gerenciamento de execução, o gerenciamento de facilidades, a qualidade, o desempenho, a sustentabilidade. Para o desenvolvimento do modelo conceitual é apresentado um fluxo das fases do ciclo de vida e respectivas etapas do comissionamento e outro fluxo com a relação de documentos gerados em cada fase. O resultado, ou seja, o modelo conceitual dá as diretrizes para o desenvolvimento de um comissionamento por meio da descrição das atividades, das competências e dos produtos gerados em cada etapa do comissionamento, conforme as fases do ciclo do edifício. Este trabalho contribui para difundir o comissionamento e embasar a sua aplicação em edifícios. / The buildings of high technology, arising from technological advances in building systems, require more planning, project details, playback controls and training of operating professionals and maintenance to meet the owner\'s project requirements, which is premised on the concept of sustainability, quality and performance. The presence of sophisticated control systems helps to facilitate the management of inputs such as water and energy, however small faults can lead to major performance failures. The flaws in the design of the buildings begin to misinterpretation, by the technical staff, the requirements of the owners. Thus, it is necessary that the design of the building are checked all requirements requested by the building owners to during its life cycle. The failure of the communication runs through the entire production chain of the building generating design flaws, design, execution and maintenance. Commissioning is a process to meet the owner\'s project requirements, document the stages of the life cycle of buildings, train operating professionals and maintenance, in order to avoid failures, reduce waste and rework, improve quality, performance and sustainability of buildings. The commissioning is more widespread in building air conditioning and lighting systems with the goal of high energy efficiency and water savings, being little used in Brazil. In this context, the objective of this research is to propose a conceptual model of commissioning for building systems. The methodology used to develop the model, uses literature as a technical procedure. To elucidate what stage the commissioning is applied, this was related to the other concepts used in the building\'s life cycle, such as: project coordination, execution management, management of facilities, quality, performance, sustainability. To develop the conceptual model presented is a flow of phases of the life cycle and respective process steps and another stream with the list of documents generated at each stage. The result, i.e. the conceptual model gives guidelines for the development of a commissioning through the description of activities, skills and products generated at each stage of the commissioning, according to the phases of building cycle. This work contributes to spread the commissioning and to support its application in buildings.
13

Stability-dependent Mass Isolation for Steel Buildings

Peternell Altamira, Luis E 1981- 14 March 2013 (has links)
A new seismic isolation system for steel building structures based on the principle of mass isolation is introduced. In this system, isolating interfaces are placed between the lateral-load-resisting sub-system and the gravity-load-resisting sub-system. Because of the virtual decoupling existing between the two structural sub-systems, the gravity-load resisting one is susceptible to instability. Due to the fact that the provided level of isolation from the ground is constrained by the stability requirements of the gravity-load resisting structure, the system is named stability-dependent mass isolation (SDMI). Lyapunov stability and its association with energy principles are used to assess the stable limits of the SDMI system, its equilibrium positions, the stability of the equi-librium positions, and to propose a series of design guidelines and equations that allow the optimal seismic performance of the system while guaranteeing the restoration of its undistorted position. It is mathematically shown that the use of soft elastic interfaces, between the lateral- and gravity-load-resisting sub-systems, can serve the dual role of stability braces and isolators well. The second part of the document is concerned with the analytical evaluation of the seismic performance of the SDMI method. First, a genetic algorithm is used to find optimized SDMI building prototypes and, later, these prototypes are subjected to a series of earthquake records having different hazard levels. This analytical testing program shows that, with the use of SDMI, not only can structural failure be avoided, but a dam-age-free structural performance can also be achieved, accompanied by average reductions in the floor accelerations of ca. 70% when compared to those developed by typical braced-frame structures. Since the SDMI system is to be used in conjunction with viscous energy dissi-paters, the analytical testing program is also used to determine the best places to place the dampers so that they are most effective in minimizing the floor accelerations and controlling the floors’ drift-ratios. Finally, recommendations on continuing research are made.
14

Programa computacional para a avaliação da produtividade da mão de obra na execução de sistemas prediais

Nascimento, Thiago Augusto do 26 October 2012 (has links)
Submitted by Luciana Sebin (lusebin@ufscar.br) on 2016-09-23T13:53:26Z No. of bitstreams: 1 DissTAN.pdf: 7913701 bytes, checksum: 1109dfa7d7adceed68ed88c1415ffc0f (MD5) / Approved for entry into archive by Marina Freitas (marinapf@ufscar.br) on 2016-09-27T19:23:40Z (GMT) No. of bitstreams: 1 DissTAN.pdf: 7913701 bytes, checksum: 1109dfa7d7adceed68ed88c1415ffc0f (MD5) / Approved for entry into archive by Marina Freitas (marinapf@ufscar.br) on 2016-09-27T19:23:48Z (GMT) No. of bitstreams: 1 DissTAN.pdf: 7913701 bytes, checksum: 1109dfa7d7adceed68ed88c1415ffc0f (MD5) / Made available in DSpace on 2016-09-27T19:23:53Z (GMT). No. of bitstreams: 1 DissTAN.pdf: 7913701 bytes, checksum: 1109dfa7d7adceed68ed88c1415ffc0f (MD5) Previous issue date: 2012-10-26 / Não recebi financiamento / The increased productivity of labor is an important factor for businesses in general face a scenario of competitiveness. In Construction there is a great opportunity for improving the productivity of labor and among the services that deserve attention in this issue, we highlight the implementation of Building Systems Hydraulic and Fuel Gas Piping (SPHSGC). However, few studies addressing the productivity of these systems have been conducted, mainly due to the difficulty of data collection, this difficulty compounded by the fact that its implementation be very fragmented, divided into several tasks and subtasks with different efforts, and happen simultaneously at different floors. In this context, justifies the development of a comptational tool that integrates the design of building systems, with the differential use graphical interface, procedures for data collection to assess the productivity of labor in the execution of these building systems, goal this work. To achieve it, initially proceeded to the understanding of the concept of productivity and indicators for its measurement as well as the procedures for collecting data in order to measure them, understanding the parts compose the SPHSGC and the process of implementation, evaluation and choice of programming language for the development of the software and ultimately their development, with testing to verify its applicability and reliability. As contributions stand out initially using the graphical interface of the projects of building systems to o stain quantitative data regarding the performance of these services, linking this information to the man-hours defendants, in their various tasks and subtasks involved in their implementation . Besides this factor facilitator, the program offers the user, which can be the manager of services or even responsible for implementation, indicators of productivity of labor and the current stage of its implementation over the floors of the building. Finally, it is noteworthy that the current use of this tool will provide managers with a database on the productivity of labor that can be used for prediction of these values for future works, feasibility study, correct sizing of work teams, lifting costs among other benefits. / O incremento da produtividade de mão de obra é um fator importante para as empresas em geral diante de um cenário de competitividade. Na Construção Civil verifica-se uma grande oportunidade para a melhoria da produtividade da mão de obra e, dentre os serviços que merecem uma atenção nesta questão, destaca-se o de execução dos Sistemas Prediais Hidráulicos e Sanitários e Gás Combustível (SPHSGC). No entanto, poucos trabalhos abordando a produtividade destes sistemas foram realizados, principalmente em função da dificuldade de coleta de dados, dificuldade esta agravada pelo fato de a sua execução ser muito fragmentada, dividida em diversas tarefas e subtarefas com esforços distintos, além de acontecer simultaneamente em pavimentos distintos. Neste contexto, justifica-se a elaboração de uma ferramenta computacional que integre o projeto de sistemas prediais, tendo como diferencial a utilização da interface gráfica, aos procedimentos de coleta de dados para avaliação da produtividade da mão de obra na execução destes sistemas prediais, objetivo deste trabalho. Para atingi-lo, inicialmente procedeu-se ao entendimento do conceito de produtividade e indicadores para sua mensuração, assim como os procedimentos necessários para a coleta de dados com o intuito de se mensurá-los, entendimento das partes de compõem os SPHSGC, bem como seu processo de execução, avaliação e escolha da linguagem de programação para a elaboração do programa computacional e, finalmente, sua elaboração, com a realização de testes para verificar sua aplicabilidade e confiabilidade. Como contribuições, destacam-se, inicialmente, o uso da interface gráfica dos projetos de sistemas prediais na obtenção dos dados relativos ao quantitativo da execução destes serviços, associando esta informação aos homens-horas demandados, nas suas diversas tarefas e subtarefas inerentes à sua execução. Além deste fator facilitador, o programa oferece ao usuário, que pode ser o gestor dos serviços ou até mesmo o responsável pela execução, os indicadores de produtividade da mão de obra e o estágio atual da sua execução ao longo dos pavimentos da edificação. Finalmente, destacase que o uso corrente desta ferramenta proporcionará aos gestores um banco de dados relativo à produtividade da mão de obra que poderá ser utilizado para fins de predição destes valores para obras futuras, estudo de viabilidade, dimensionamento correto das equipes de trabalho, levantamento de custos entre outros benefícios.
15

Estudo comparativo entre a aplicação de sistemas dedicados e a utilização de controladores lógico-programáveis na automação de sistemas prediais. / Comparative study between among application os dedicated systemas and the use of programmable logic controllers on building automations systems.

Marco Antonio Baptista de Sousa 30 March 2004 (has links)
O trabalho enfoca a automação predial, procurando analisar, comparativamente, a utilização de tecnologias convencionais e equipamentos empregados na automação de processos industriais. Através de um estudo de caso, efetuou-se uma descrição dos principais sistemas prediais possíveis de serem automatizados em um edifício, efetuando-se uma avaliação comparativa entre os sistemas convencionais e os baseados na automação de processos, permitindo o uso mais eficiente dos insumos prediais, além de aumentar o conforto e a segurança de seus ocupantes. Verificou-se um grande potencial de aplicação dos sistemas de automação de processos industriais, para implementação alternativa nos sistemas de automação predial. / This research focuses building automation, analyzing comparatively the use of conventional technologies and other equipments commonly applied in industrial processes. Through a case study, a description of mainly building systems that are feasible to be automated in high technology buildings has been made, including a comparative evaluation of mainly building systems based on conventional systems and automation process, allowing the most efficient use of building resources, beyond to increase the users’ comfort and security. It was verified a great potential for applications of industrial processes automation systems, as an alternative implementation in building automation systems.
16

Operação de sistemas de aquecimento solar de água com controle de vazões em coletores planos. / Operation of solar water-heating systems with flow control on flat plate collectors.

Laerte Bernardes Arruda 01 July 2004 (has links)
O presente trabalho consiste em um estudo experimental sobre o efeito do controle de vazões em sistemas de aquecimento solar de água em instalações com grande número de coletores, onde o gradiente de temperatura não é suficiente para circular a água por termossifonagem. Foi avaliado o desempenho de todo o sistema sob diferentes condições de insolação, de vazão, de diferenciais de temperatura entre os coletores e o reservatório, em regime não permanente. Os resultados experimentais foram comparados com a equação de rendimento dos coletores, para condições de regime quase permanente, obtida segundo a norma da ABNT - NBR 10184/1988. Os ensaios foram realizados em duas baterias de testes, cada uma composta de dois coletores industrializados e um reservatório isolado termicamente. Em uma destas baterias, o fluxo de água entre os coletores e o reservatório ocorreu por termossifonagem, isto é, sem nenhuma restrição à vazão; na outra bateria, a vazão foi controlada por um registro e uma bomba hidráulica. Um sistema de automação coletou e processou os dados de forma a permitir a execução dos controles desejados, inclusive a simulação de consumo de água quente. O sistema com circulação natural, isto é, por termossifão, demonstrou ter uma grande habilidade de se adaptar à disponibilidade de energia com as temperaturas da água armazenada, por meio da otimização da velocidade da troca de calor. Foi desenvolvido, tomado como referência o escoamento por termossifão, um modelo de operação para sistemas diretos ativos que calcula a vazão com base no monitoramento das temperaturas das extremidades das tubulações que interligam o reservatório e os coletores, temperatura do ar, radiação solar disponível e vazão no instante anterior. O modelo foi testado experimentalmente e a operação do sistema ativo resultou em significativa melhora a eficiência. / The focus of this work is the experimental study of the effect of water control discharge in solar water-heating systems with a large number of collectors where the temperature gradient is not sufficient for thermosiphon water circulation. The performance of the system was evaluated under different conditions of solar radiation, flow rate, temperature differential between solar collectors and the storage tank and under transient conditions. The results were compared to a collector\'s performance equation of the quasi-steady-state model according to ABNT-NBR 10184/1988 standard. The tests were carried out on two systems each one constituted of two manufacturing collectors and one thermal tank. In one of these systems the flow between the collectors and storage occurred by thermosiphoning, i.e., by natural convection and without discharge restrictions. In the other, the flow control was done by means of a valve and a pump. In order to allow the execution of the desired controls, including hot water consumption, data were colleted and controlled through an automation system. The system of natural circulation shows a great ability to adaptation of disposal energy with water temperature stored, through velocity of heat exchange optimization. An operation model was developed, having thermosiphoning water circulation as reference, for active direct circulation systems that calculate the discharge taking into consideration the monitoring of the differential temperature between solar collectors and the storage tank, the air temperature, solar radiation available and the flow rate on previous time interval. This model was experimentally tested and resulted in a significant improvement in performance of the system operation.
17

Estudo das variaveis determinantes no consumo de agua em escolas : o caso das unidades municipais de Campinas, São Paulo / Study of determinants variables of water consumption in schools : the case of the public schools in Campinas, São Paulo

Pedroso, Luciana Pereira, 1976- 29 April 2008 (has links)
Orientador: Marina Sangoi de Oliveira Ilha / Tese (doutorado) - Universidade Estadual de Campinas, Faculdade de Engenharia Civil, Arquitetura e Urbanismo / Made available in DSpace on 2018-08-11T20:07:03Z (GMT). No. of bitstreams: 1 Pedroso_LucianaPereira_D.pdf: 2946475 bytes, checksum: 08b0911a08df33b246d30034b687025c (MD5) Previous issue date: 2008 / Resumo: A questão da água nas cidades envolve a carência/escassez de recursos associada à crescente poluição e também grandes índices de desperdícios, que ocorrem tanto na fase de uso e operação, com perdas devido a vazamentos e mau uso desse insumo, quanto na fase de projeto e execução, com o emprego de indicadores de consumo e vazões de projeto inadequadas, que podem levar ao superdimensionamento dos componentes do sistema predial, vazões excessivas nos pontos de consumo, entre outros. A estimativa do consumo de água em edifícios é usualmente feita a partir da consideração do indicador de consumo (IC) que consiste na relação entre o volume de água consumido em determinado período e o número de agentes consumidores neste mesmo período. A despeito da facilidade de sua determinação, o IC não retrata a influência que determinadas variáveis têm sobre o consumo, principalmente em um país com uma extensão territorial tão grande quanto o Brasil e, com isso, o seu emprego em diferentes situações de projeto pode conduzir a valores inadequados do consumo de água. Nesse sentido, esse trabalho apresenta um estudo das variáveis determinantes do consumo em escolas públicas, tendo como objeto de estudo treze unidades da rede municipal de Campinas, São Paulo. A partir do monitoramento remoto do consumo por um período de oito meses, em média, foi efetuada uma análise de regressão múltipla para a determinação de modelos para a estimativa do consumo de água em duas categorias de escolas: creches e escolas de ensino infantil e escolas de ensino fundamental. Os resultados obtidos indicam que a temperatura máxima diária, a área impermeável total e o número de bacias sanitárias com válvula de descarga foram as variáveis mais representativas do consumo nas creches e escolas de ensino infantil. No caso das escolas de ensino fundamental, as variáveis mais representativas foram a temperatura máxima diária, as áreas permeável e impermeável total e o número de salas de aula. / Abstract: The issue of water in cities involves the lack / shortage of resources associated with growing pollution and major indices of waste, which both occur during the use and operation, with losses due to leaks and misuse of water, as at the stage of project and implementation, with the employment indicators of consumption and flow rates of inadequate design, which can lead to supersize components of the building system, excessive flow rates at the consumption point, among others. The estimative of water consumption in buildings is usually made from the use of consumption indicator(IC) which is the relationship between the volume of water consumed in a established period and the number of consumers in this same period. Despite the easy of their determination, the IC does not showy the influence that some variables have on consumption, especially in a country with a large territorial extension as Brazil and thus, its use in different situations of design can lead the inadequate values of water consumption. On this way, this work presents a study of determinants variables of consumption in public schools, having as the object of this study thirteen units of the Campinas public school. From the remote monitoring of consumption for a period of eight months, on average, it was done a multiple regression analysis for the determination of models to estimate water consumption in two categories of schools: children daycare and kindgarden and middle schools. The results indicate that the daily maximum temperature, the total impermeable area and the number of close water with sanitary waste-gate variables were the most representative of consumption in children daycare and kindgarden. In the case of middle schools, the most representative variables were the daily maximum temperature, the permeable and impermeable total areas and the number of classrooms. / Doutorado / Saneamento e Ambiente / Doutor em Engenharia Civil
18

Regras de verificação e validação de modelos BIM para sistemas prediais hidráulicos e sanitários. / Rules of verification and validation of BIM models for sanitary hydraulic building installations.

Carolina Yumi Kubo Takagaki 10 June 2016 (has links)
A complexidade das atuais edificações e, consequentemente, a divisão dos projetos em especialidades e subsistemas evidenciam as dificuldades do coordenador de projetos em gerenciar todo o processo de projeto. Há necessidade de um fluxo contínuo de troca de informações e de comunicação entre os envolvidos. A prática do BIM (Building Information Modeling) e o emprego de suas ferramentas computacionais propiciam aos projetistas a agilidade e precisão no desenvolvimento do projeto, uma vez que possibilita, por exemplo, uma visualização da interação de todos os subsistemas do edifício. No entanto, o cenário atual da tecnologia não provê ferramentas para todos os fluxos de trabalho necessários, e quando fornece, nem sempre o software disponível segue as normas específicas para determinada aplicação em certo país. As normas técnicas estabelecem requisitos e recomendações relativos ao projeto e devem ser observadas por projetistas para a segurança e qualidade das edificações. Neste sentido, o objetivo desta pesquisa é desenvolver regras de verificação e validação de modelos BIM para sistemas prediais com base em normas técnicas brasileiras, tais como a de sistemas prediais de água, de esgoto sanitário e de águas pluviais. O método empregado considera o levantamento das recomendações normativas e suas respectivas transformações em regras que possam ser verificadas automaticamente por meio de programas de computador. O programa adotado foi o software Solibri Model Checker (SMC), que faz uso de modelos em Industry Foundation Classes (IFC). Os resultados mostram que regras simples de comparação e relacionadas a propriedades de cada elemento são possíveis de serem parametrizadas no SMC e têm resultados sólidos de fácil visualização, o que permite uma correção mais rápida e dinâmica por parte dos projetistas e coordenadores de projeto. Para regras mais complexas, necessitou-se da criação de ferramentas paralelas ao SMC. Constata-se que o SMC ainda é incompleto quando se trata da análise de projetos de sistemas prediais hidráulicos e sanitários, porém é possível desenvolvê-las uma vez que o modelo em IFC pode conter todas as informações necessárias às análises. Assim, verifica-se a necessidade de que os projetos BIM contenham as informações e obedeçam a padrões de modelagem para que possam ser utilizados na verificação de regras de modo eficiente. Por fim, os resultados desta pesquisa contribuem para o emprego do BIM no desenvolvimento e análise de projeto de sistemas prediais hidráulicos e sanitários com maior precisão, agilidade e qualidade. / The complexity of existing buildings and, consequently, the division of projects and sub-specialties highlight the difficulties the project coordinator to manage the entire design process. There is a need for a continuous flow of information exchange and communication among stakeholders. The practice of BIM (Building Information Modeling) and the use of their computational tools provide designers the speed and accuracy in the development of the project, as it enables, for example, a preview of the interaction of all building subsystems. However, the current technology landscape does not provide tools for all to workflows required, and when it does, they do not always follow standards a specific application in a given country. The technical standards contain requirements and recommendations relating to the project and must be observed by designers for the safety and quality of the buildings. In this sense, the objective of this research is to develop procedures for verification and validation of BIM models for building systems based on Brazilian technical standards, such as building systems for water, sanitary sewer and storm water. The employed method considers the collection of policy recommendations and their changes in rules that can be automatically checked using computer programs. The adopted program was Solibri Model Checker software (SMC), which makes use of models in Industry Foundation Classes (IFC). The results show that simple comparison rules and related properties of each element are able to be parameterized in the SMC and have solid results for easy viewing, allowing faster correction and dynamic on the part of designers and design engineers. For more complex rules the creation of parallel tools to SMC is needed. It appears that the SMC is still incomplete when it comes to the analysis of hydraulic and sanitary building systems projects, but you can develop them as the model in IFC can contain all the necessary information to the analysis. Thus, there is a need that the BIM projects contain the information and comply with standards for modeling which can be used to verify rules efficiently. Finally, the results of this research contribute to the use of BIM in the development and design analysis of hydraulic building systems and toilets with greater accuracy, speed and quality.
19

Desempenho de sistema predial de água quente / Performance of hot water building system

Benedicto, Sergio Murilo de Oliveira 28 August 2009 (has links)
Made available in DSpace on 2016-06-02T20:09:12Z (GMT). No. of bitstreams: 1 2658.pdf: 6465379 bytes, checksum: 36ddfb1a99f8afae7b94d36d1ec535cf (MD5) Previous issue date: 2009-08-28 / In Hydraulic and Sanitary Building Systems there are nonconformance issues that can occur when user begins occupying and interacting with the building. Among other systems, the Hot Water Building System is responsible to offer to user important activities to human being such as bath and dish washing. The performance of the systems that constitute the housing buildings along its life is connected to the conditions of use for it was designed, to the execution of the construction according to the technical regulations, to the use of materials and components free of imperfections and to the programs and techniques of regular auditing and building maintenance. Even though the field of nonconformance is a subject not so explored in Brazil, it can be inferred as causes of nonconformance issues in the Hot Water Building System: technical regulations out-of-date, project mistakes, inadequate specifications, manufacture problems, execution errors, lack of maintenance or inadequate maintenance. This dissertation, based on the user's requirements as established by NBR 15575-1, objects the identification of performance requirements and criteria, to multistoried residential buildings. This theoretical study was applied to two multistoried residential buildings to find out probable s nonconformance. / Nos Sistemas Prediais Hidráulicos e Sanitários (SPHS) inúmeras são as não conformidades que podem ocorrer quando o usuário passa a ocupar e interagir com a edificação. Dentre esses sistemas, o Sistema Predial de Água Quente (SPAQ) é o responsável por oferecer ao usuário as condições de conforto e higiene em atividades tão importantes para o ser humano como banho e lavagem de louças. O desempenho dos sistemas que compõem o edifício habitacional durante a sua vida útil está vinculado às condições do uso para o qual foi projetado, à execução da obra de acordo com as normas técnicas, à utilização de elementos e componentes sem defeito de fabricação e a programas e técnicas de inspeções periódicas e de manutenção predial. Apesar do estudo das não conformidades nas construções, na área de SPHS, ser um tema pouco estudado no Brasil, pode-se admitir como causas das mesmas no SPAQ: norma técnica desatualizada, erros de projeto, especificações inadequadas, defeitos de fabricação, falhas na execução, falta de manutenção ou manutenção inadequada. Esta dissertação, baseando-se nas exigências do usuário estabelecidas na NBR 15575-1, teve como objetivo a identificação dos requisitos e dos critérios de desempenho do SPAQ, em edifícios habitacionais de múltiplos pavimentos. Esse estudo teórico foi posteriormente aplicado em dois edifícios residenciais para serem encontradas possíveis não conformidades.
20

A medição setorizada como instrumento de gestão da demanda de água em sistemas prediais - estudo de caso: Programa de Uso Racional da Água da Universidade de São Paulo. / Submetering as an instrument of water demand management in building systems – case study: Water Conservation Program of the University of São Paulo.

Tamaki, Humberto Oyamada 03 April 2003 (has links)
No presente trabalho é estudada a utilização da medição setorizada como instrumento de gestão da demanda de água em sistemas prediais. Para tanto, a caracterização dos medidores e a análise das interações dos elementos de medição com o sistema de suprimento de água fria e de equipamento sanitário são realizados a partir de um enfoque sistêmico e de desempenho. Considerando a coleta de melhores informações, qualitativamente e quantitativamente acerca do consumo, essencial para a gestão da demanda de água, e especialmente em um contexto de ações de conservação, neste trabalho levantou-se os sistemas de telemedição. Apresentou-se uma proposta de planejamento de implantação da medição setorizada e quais elementos que devem ser observados para a gestão da demanda. Para subsidiar as avaliações, realizou-se o estudo de caso da medição setorizada na Universidade de São Paulo, no qual foi possível verificar a importância da sua aplicação e os resultados extremamente positivos que justificaram sua implantação. / In this work it is studied the use of submetering as an instrument of water demand management in building systems. In such way, the characterization of the meters and the analysis of the interactions of its elements with the building hydraulical system are carried on a systemic approach and performance analysis of the proposal. Considering the collection of better information of water consumption essential for the water demand management, especially in a conservation context, it was searched out the systems and the technologies of remote metering. A proposal for the planning of the submetering implantation was showed, as well as the elements that should be considered for the demand management. To make the evaluations, the case study of the submetering program in the University of São Paulo was accomplished, in which it was possible to verify the importance of its application and the extremely positive results that had justified its implantation.

Page generated in 0.487 seconds