41 |
Geodetické práce v investiční výstavbě. / Surveying measurement in the capital construction.PÁLENÍKOVÁ, Lenka January 2009 (has links)
The accuracy appraisal and its evaluation with what the results of geodetic work are being achieved will be shown in this graduation thesis. As well as the related legislation and economic point of view of the price setting in comparison to other geodetic companies. One of the major surveyed area is testing of the used instruments - confrontation of achieved values with the values stated by manufacturer, accuracy analysis of the used methods and allignment of independent measurements of equal magnitude.
|
42 |
Tillämpning av träbaserat modulväggsystem för påbyggnad av efterkrigstidens flerbostadshus : Utifrån energikrav och ekonomiska förutsättningar / Application of Wood Based Module Wall System for Vertical Attic Extension of Post-war Residential Building : By Energy Demand and Economic PreconditionsSamuelsson, Jimmy, Debes, Yahya January 2017 (has links)
Syfte: Nya svenska energikrav definieras som nära-nollbyggnader för både nybyggnation och renovering, där man strävar efter en årlig balans mellan ingående och utgående energi för byggnaden. Påbyggnad genom prefabricerade modulsystem med bärande väggar av korslimmat massivträ har genom internationella studier visat sig både tids- och kostnadseffektiv vid renovering. Målet med rapporten är att undersöka möjligheten att tillämpa detta påbyggnadssystem för svenska renoveringsprojekt av efterkrigstidens flerbostadshus som både är kostnadseffektivt och som klarar nya svenska energikrav. Metod: Rapporten syftar till att besvara frågeställningarna genom en fallstudie. Inledningsvis, under en litteraturstudie, beskrivs incitament till påbyggnation vid renovering. Utefter en dokumentanalys av referensbyggnaden, utförs sedan energi- och kostnadsjämförelser mellan påbyggnation av korslimmade massivträväggar och platsbyggd träregelkonstruktion. Resultat: Svenska efterkrigstidens bostadsbestånd visar sig, via renovering och påbyggnation, ha hög potential för att positiv påverka den i Sverige genomsnittliga specifika energianvändningen samtidigt som det erbjuder snabb och kostnadseffektiv urban bostadsförtätning. Den värmeisolerande förmågan för korslimmat massivträ är, för en påbyggnad, likvärdigt det av platsbyggd träkonstruktion. Beräkningarna visar däremot hur byggnation från efterkrigstiden har svårt att uppnå krav för nära-nollenergihus. Kostnad för montering av påbyggnadsstomme och innerväggar m.m. visar på ca 2,7 % besparing för förslag av korslimmat massivträ. Konsekvenser: Rapporten lyfter fram möjligheterna kring renovering av svenska flerbostadshus från efterkrigstiden och fördelarna att göra detta i kombination med påbyggnation. Det finns goda förutsättningar för implementering av korslimmade massivträväggar även i svenska påbyggnadsprojekt och detta till något lägre pris och arbetstid gentemot platsbyggd konstruktion. Trots att detta vilar mycket på valet av prefabricering, har undersökningen lyckats exponera ett befogat alternativ för påbyggnadsprojekten i framtiden. Eventuella svårigheter i att uppnå nya energikrav vid renovering av äldre bostadsbestånd har även lyfts fram i rapporten. Begränsningar: Kontroll av bärförmåga för referensbyggnaden via konstruktionsmässiga beräkningar genomförs inte i denna rapport. Beräkning av livscykelkostnad ingår inte i detta arbete. Rapporten fokuserar istället på ekonomisk effektivitet i produktionsskedet. Rapporten fokuserar sin undersökning kring åtgärder för energianvändning och berör inte eventuella åtgärder för t.ex. högre tillgänglighet. / Purpose: New Swedish energy requirements are defined as Near Zero Energy Buildings for both new construction and renovation, with the purpose of balancing energy entering and exiting the building. Vertical attic extensions through prefabricated module system containing loadbearing walls of cross laminated timber has, by international studies, shown the potential for time and cost efficiency during renovation projects. The purpose of this inquiry is to examine the possibility to apply this extension system for Swedish renovation projects on post-war residential buildings that are both cost effective and that satisfies new Swedish energy regulations. Method: The report aims to answer the questions through a case study. Initially a literature study describes the incentives of vertical attic extensions and renovation. Then through a document analysis of a reference building, energy and cost comparisons are carried out between an attic extension of cross laminated timber and wood construction assembled on site. Findings: The Swedish post-war housing stock shows high potential through renovation and attic extension, to positively influence the Swedish average specific energy use while simultaneously providing fast and cost effective urban densification. The heat insulating performance of cross laminated timber is, for an attic extension, equivalent that of an on-site assembled wood construction. However, calculations shows difficulties for post-war housing stock to achieve the requirements for Near Zero Energy Buildings. The cost for assembling extending structure and interior walls etc. reveals approximately 2,7 % savings with cross laminated timber. Implications: The report brings forth the possibilities regarding renovation of the Swedish post-war stock of multifamily housing and the advantages of doing so in combination with vertical attic extensions. There are good conditions for implementation of cross laminated timber walls even in Swedish extension projects, while having the potential to lower costs slightly and saving time in relation to on site construction. Even though the results depend a lot on the choice of prefabrication, the study has exposed a valid alternative for future attic extension projects. The report also reveals potential difficulties in achieving new energy requirements for renovation of older housing stock. Limitations: Verification of load capacity through constructional calculations are not performed in this inquiry. Calculating the life-cycle cost is not a part of this project, which instead focuses on economic efficiency during production. The report focuses its research at energy-saving measures and doesn’t concern measures regarding for example higher accessibility.
|
43 |
Porovnání návrhu plynem izolované rozvodny ve 2D a 3D prostředí ve fázi nabídky / Comparison of a gas insulated switchgear draft in 2D and 3D interface in the offer phaseTurkovič, Matúš January 2017 (has links)
This thesis deals with the design of gas insulated switchgear produced in company ABB s.r.o. Theoretically describes the basics of project engineering in the 2D and 3D environments as well as the construction, partition and properties of the switchgear substations. In thesis is included practical designs and comparison of a gas insulated switchgear draft in 2D and 3D interface in the offer phase.
|
44 |
Kalkulace nákladů jako východisko tvorby rozpočtů ve vybrané firmě / Costing as the Principle of the Budgeting Creation in the Selected FirmPittermannová, Martina January 2010 (has links)
The diploma thesis focuses on specification of cost calculation and budgets in selected company. Specifies cost models and costing system based on analysis of costs in bachelor thesis. Defines budgets, budget types and budget method and compares theoretical knowledge with reality in selected company. It contains suggestions of costs and budgets improvement.
|
45 |
Řízení nákladů v podniku / Cost Management in the CompanyHeroudek, Jiří January 2011 (has links)
This Master‘s thesis is focused on cost analyses and cost management in FEI Company. Theoretical part describes basic and advanced cost model and their usage for efficient cost management. Practical part deals with analyses of calculation method for standard costing and life cycle costing. As a part of these analyses, some recommendations are provided to make cost calculations more accurate.
|
46 |
Kalkulace výrobních nákladů ve firmě Tomášek Milan - TOMEX / Calculation of Production Costs in the Company Tomasek Milan - TOMEXNeubauer, Ondřej January 2014 (has links)
This thesis is focused on the calculation of production costs with the introduction of licensed production of submersible sludge pumps in company Tomasek Milan - TOMEX. The aim of this work is the introduction of licensed production and determine the manufacturing cost. In the theoretical section describes the methods for determining a production layout, calculation methods and methods of return on investment. The practical part deals with the determination of a suitable arrangement of production, production calculations and evaluation of overall investment.
|
47 |
Analýza vedlejších nákladů stavebního rozpočtu / Analysis of accessory costs of budgetVacek, Jan Unknown Date (has links)
The purpose of this diploma thesis was to clarify the problematics of other costs of the construction budget and to create its own percentage tariffs for survey, geodetic and project work. The methodology used in the numerical part of the thesis was based on existing knowledge. The basis of all calculations were the budgets of civic amenities provided by the municipal authorities. The result of the work are the calculated tariffs of the relevant works and their ratio to the total ancillary and other costs of the construction budget. The work also finds out what are the most common ways of valuing work in the phase of creating an offer from the perspective of suppliers.
|
48 |
Kapitalkostnadsberäkning för investeringar : En kvantitativ studie av svenska börsnoterade bolag / Cost of capital calculation for investments : A quantitative study of Swedish listed companiesKarlsson, Johan, Nicklasson, Robin January 2023 (has links)
Titel: Kapitalkostnadsberäkning för investeringar - En kvantitativ studie av svenska börsnoterade bolag Frågeställningar: Hur beräknas kapitalkostnad primärt i svenska börsnoterade bolag? Skiljer sig beräkningen av kapitalkostnad i svenska börsnoterade bolag beroende på faktorer som företagsstorlek, sektor och företagsmognad? Syfte: Syftet med undersökningen är att få svar på hur beräkning av kapitalkostnad faktiskt går till i börsnoterade bolag i Sverige och huruvida beräkningen varierar i förhållande till faktorerna företagsstorlek, sektor och företagsmognad. Metod: Genom att använda av de nämnda faktorerna kunde företags olikheter lyftas på ett bra sätt. Det studerade urvalet bestod av 25 respondenter som besvarade en enkät. Med hjälp av enkätsvaren kunde hypoteser formas och testas. Slutsats: Undersökningen visar att det finns vissa statistiskt signifikanta samband mellan kapitalkostnadsberäkning och företagsstorlek samt en studerad sektor. Vidare lyfter studien vissa olikheter i riskhantering mellan olika företagsstorlekar. Studien presenterar också vilka metoder som används mest för beräkning av kapitalkostnad, kostnad för eget kapital samt kostnad för lånefinansiering i Sverige. De är Weighted average cost of capital, Capital asset pricing model respektive genomsnittlig kostnad. / Title: Cost of capital calculation for investments - A quantitative study of Swedish listed companies Research questions: How is cost of capital generally calculated in Swedish listed companies? Are there any differences in cost of capital calculation methods in Swedish listed companies depending on company size, sector and company maturity? Purpose: This quantitative study intends to highlight how capital cost calculations are made in Swedish companies. Another part of the aim is to investigate connections between cost of capital calculation and the factors company size, sector and company maturity. Method: By using the factors, different company disparities could be projected in a useful way. The examined sample of 25 companies answered a survey. With these answers hypotheses were formed and tested. Conclusion: This study shows that there are some statistically significant connections between cost of capital calculation and company size and one examined sector. Furthermore, the study also highlights the differences in consideration of risk in different company sizes. This study also presents a result about the most common methods for calculating cost of capital,cost of equity and cost of debt in Sweden. These are Weighted average cost of capital, Capital asset pricing model respectively average cost.
|
49 |
Vlastní výrobky, jejich obchodování v podniku / Products dealing in the firmŘEHOUŠEK, Jan January 2008 (has links)
Analysis of sales and level of stocks of finished products. Analysis of structure of selling and assessment of turnover and dealing finished products in the firm. Inventory management, ABC analysis, optimisation and materials norm. Cost calculation, pricing and sales condition. The proposal for formation the stocks of finished goods in the warehouse. Implementation the method Kanban for finished goods. The proposal for addition of in-house directives and guidelines
|
50 |
Návrh financování rezidenční výstavby v lokalitě Nupaky / Proposal of Residental Development Financing in Locality NupakyD´Ambrosová, Lucie January 2008 (has links)
This master´s thesis deals with problems of development financing. Part of this thesis is a description of development activity and risks, which it may bring. The thesis is focused on financing and credits provided by banking institution. Analysis of different financing methods of properity purchase confronts their convenience for both development companies and clients. Practical part of this thesis is a proposal of financing of housing and family houses construction in the locality of Nupaky for the company CANABA, wich is focused on cost calculation and cash-flow of the whole project.
|
Page generated in 0.0307 seconds