• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 7
  • Tagged with
  • 7
  • 7
  • 4
  • 4
  • 3
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Declividade e diferentes configurações hidráulicas no dimensionamento e custo total de sistema de irrigação por aspersão convencional / Different hydraulic settings and slope in the design and total cost of sprinkler irrigation system

Alves, Élvis da Silva [UNESP] 09 December 2016 (has links)
Submitted by ÉLVIS DA SILVA ALVES null (elvistv@gmail.com) on 2017-05-23T01:28:11Z No. of bitstreams: 1 DISSERTAÇÃO ÉLVIS DA SILVA ALVES - VERSÃO FINAL.pdf: 2394634 bytes, checksum: 81c826b47bfbc9a96c4f06f04d40a4be (MD5) / Approved for entry into archive by Luiz Galeffi (luizgaleffi@gmail.com) on 2017-05-23T17:57:07Z (GMT) No. of bitstreams: 1 alves_es_me_bot.pdf: 2394634 bytes, checksum: 81c826b47bfbc9a96c4f06f04d40a4be (MD5) / Made available in DSpace on 2017-05-23T17:57:07Z (GMT). No. of bitstreams: 1 alves_es_me_bot.pdf: 2394634 bytes, checksum: 81c826b47bfbc9a96c4f06f04d40a4be (MD5) Previous issue date: 2016-12-09 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES) / Para que as áreas irrigadas com sistemas de irrigação por aspersão convencional se tornem eficientes e lucrativas é necessário que projetistas e usuários sejam orientados sobre as diferentes variáveis e critérios que interferem no dimensionamento destes sistemas, principalmente por estes possibilitarem a disposição da instalação em diferentes configurações de tubulação. Objetivou-se com esse trabalho verificar o efeito de diferentes vazões, configurações hidráulicas e declividades do terreno no dimensionamento da rede hidráulica e no custo total de sistema de irrigação por aspersão convencional. Para a realização dos cálculos foram construídas planilhas eletrônicas e as equações de dimensionamento foram aplicadas utilizando dados reais de uma área do Departamento de Engenharia Rural da Faculdade de Ciências Agronômicas da UNESP, campus de Botucatu. As características estudadas foram: configuração hidráulica do sistema (A ou B); vazão do projeto (econômica ou prática); declividade do terreno (0, 2 ou 4%); modificação do critério de variação de vazão (10 ou 15%) e; o custo total do sistema (implantação e energia elétrica). A vazão econômica resultou em menor custo total que a vazão prática em todas as declividades avaliadas, nos dois critérios de dimensionamento baseados na variação máxima de vazão na linha lateral e nas duas configurações hidráulicas analisadas. A configuração A, com uma única linha principal e duas linhas laterais de maior comprimento com aspersores de menor vazão, apresentou menor custo que a configuração B, com uma linha principal, duas linhas secundárias e 4 linhas laterais de menor comprimento com aspersores de maior vazão, em todas as declividades avaliadas, nos dois critérios de dimensionamento baseados na variação máxima de vazão na linha lateral e nas duas vazões totais analisadas. Verificou- se efeito da declividade no custo total do sistema de irrigação por aspersão convencional apenas na Configuração B, com 15% de Δq, com a vazão prática, tendo as declividades 2 e 4% apresentado custo total anual idêntico de R$3019,50 , superior ao obtido na condição em nível (R$2687,00). Estas configurações são as de maior variação dos critérios de dimensionamento, indicando que há necessidade de amplitude de variação para passar para o diâmetro comercial superior ou para um motor de potência acima e consequentemente gerar maior custo total. / For irrigated areas with conventional sprinkler irrigation systems to become efficient and profitable, it is necessary for designers and users to be guided by the different variables and criteria that interfere in the design of these systems, mainly because they allow the layout of the installation in various configurations of the pipeline. The objective of this work was to verify the effect of different flow rates, hydraulic configurations and terrain slopes in the hydraulic network design and the total cost of a conventional sprinkler irrigation system. Spreadsheets were constructed to perform the calculations, and the design equations were applied using real data from an area of the Department of Rural Engineering of the Faculty of Agronomic Sciences of UNESP, Botucatu campus. The characteristics studied were: hydraulic system configuration (A or B); project flow (economic or practical); slope (0,2 or 4%); modification of the criterion of allowed flow variation (10 or 15%) and; the total cost of the system (fixed and variable costs). The economic flow resulted in a lower total cost than the practical in all slopes evaluated, in the two design criteria based on the maximum variation of lateral line flow and in the two hydraulic configurations analyzed. The A configuration with a single main line and two longer lateral lines with lower flow sprinklers, showed lower cost than the configuration B with the main line, two secondary lines and 4 lateral lines shorter with higher flow sprinklers, in all evaluated slopes, in the two design criteria based on the maximum variation in lateral line flow and in the two total flows analyzed. There was an effect of slope on the total cost of the conventional sprinkler irrigation system only in Configuration B, with 15% of Δq, with the practical flow, with slopes 2 and 4% showing the same annual total cost of R$ 3019.50 , higher than that obtained in the level condition (R$ 2687.00). These configurations are the ones with the greatest variation of the design criteria, indicating that there is a need for an amplitude of variation to pass to the higher commercial diameter or a power motor above and consequently generate a higher total cost.
2

Energia solar concentrada: simulação do desempenho de heliostatos de pequeno porte / Concentrated solar power: performance simulation of small heliostats

Bezerra, Pedro Henrique Silva [UNESP] 21 December 2017 (has links)
Submitted by Pedro Henrique Silva Bezerra (bezerra_ph@hotmail.com) on 2018-02-27T20:13:05Z No. of bitstreams: 1 Pedro_TESE_PhB_vFinal_End.pdf: 5319802 bytes, checksum: 94d53895ad14519618f305ca0270d507 (MD5) / Approved for entry into archive by Maria Lucia Martins Frederico null (mlucia@fca.unesp.br) on 2018-02-28T13:05:34Z (GMT) No. of bitstreams: 1 bezerra_phs_dr_botfca.pdf: 5138963 bytes, checksum: 1d8d792b9a7d21225d7957061907028b (MD5) / Made available in DSpace on 2018-02-28T13:05:34Z (GMT). No. of bitstreams: 1 bezerra_phs_dr_botfca.pdf: 5138963 bytes, checksum: 1d8d792b9a7d21225d7957061907028b (MD5) Previous issue date: 2017-12-21 / Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq) / A pesquisa apresentada nessa tese foi estruturada em quatro capítulos. O capítulo 1 apresenta, de forma introdutória, o estudo da arte da tecnologia CSP no mundo, bem como os conceitos tecnológicos e princípios físicos de funcionamento. Mais além, demonstrar o potencial solar brasileiro do ponto de vista exploratório. O capítulo 2, apresenta uma previsão de performance e rendimento energético de um sistema CSP com torre central integrado a atividades agroindustriais no Brasil, por meio de uma simulação transiente. O capítulo 3, apresenta de forma detalhada a adaptação e aplicação de uma análise paramétrica para determinação do custo mínimo por unidade de área de heliostato, o custo mínimo do primeiro heliostato produzido no Brasil, como também o custo nivelado da eletricidade gerada. No capítulo 4, foi apresentado um estudo do marco legal jurídico regulatório para sistemas CSP com torre central: geração e comercialização de energia elétrica de fonte solar no brasil. Por fim, foram apresentadas perspectivas de novas pesquisas a serem realizadas e as considerações finais. / The search for new energy sources has been driven by an international standard that limits the emission of atmospheric pollutants. The establishment of renewable energy generation technologies will consolidate the future of sustainable development. The new technologies promise to economic opportunities and social benefits to remote places of the world, or where energy is scarce. Among the new sources or alternative sources of energy, solar is the most promising in terms of availability and well accepted by popular opinion. Historically, the sun's energy is being harnessed in different productive sectors and several countries. Furthermore, the concentrated solar power (CSP) runs through well-defined and known methods, based on well-established physical principles of engineering and using available materials and conventional. In order to present the theoretical conceptions of the operation of CSP technology, the objective of this chapter was to develop the current state of the art of technology and to correlate with the brazilian solar potential.
3

Recursos operativos no planejamento de expansão de sistemas de potência. / Operation procedures in power systems expansion planning

Magalhães, Cecilia Helena Negri de 23 March 2009 (has links)
O requisito de continuidade de fornecimento de energia elétrica tem sido crescente na medida em que a sociedade de modo geral e os processos industriais em particular apresentam forte dependência desse insumo que assegura a todos satisfação e conforto. O consumidor é um agente econômico e ele faz parte do sistema elétrico (carga). No âmbito da análise de sistemas de potência são abordados temas, desde modelos de representação da rede e da carga até conceitos de custo da continuidade e técnicas de otimização da aplicação de investimentos para priorizar aqueles que trazem maior benefício tanto para o consumidor como para o controlador da concessão. No entanto, as técnicas usuais e convencionais de Planejamento podem conduzir a soluções pouco econômicas, porquanto consideram apenas a otimização dos investimentos em obras, ou seja, reforços da rede para atender a condição normal e em emergência (critério n-1), respeitando, naturalmente, critérios técnicos (limites de tensão, sobrecargas etc). Não raro estas instalações recomendadas pela técnica convencional serem utilizadas apenas em algumas contingências, algumas com baixa probabilidade de ocorrência. Esta pesquisa desenvolve como alternativa às soluções convencionais, um modelo que considera a otimização dos investimentos, lançando mão de recursos operativos como: corte de carga, despacho ou modificações topológicas por meio de chaveamentos, quando operando em contingência. O modelo proposto prevê que a representação da geração inclua funções que relacionam a intensidade de despacho com seus custos, bem como funções que associam custo à intensidade e duração do corte de carga a cada barra do sistema. O modelo também permite a reconfiguração da rede quando operando em contingências, por meio de alterações do estado das chaves, mudando a topologia. As funções de custo do corte de carga também são modeladas neste trabalho, considerando métodos analíticos e agregados para o cálculo do prejuízo sócio-econômico resultante da interrupção. A busca da solução ótima, que pode envolver corte de carga, despachos de geração e reconfiguração da rede, substituindo reforços realizados por obra, é obtida por um algoritmo genético evolutivo. Os procedimentos do modelo proposto representam um avanço do processo de planejamento convencional, porquanto introduz a componente continuidade de serviço de forma quantitativa, caracterizando o atendimento dos requisitos de sensibilidade das cargas de cada barra do sistema, lançando mão de recursos operativos, através de possíveis despachos e alterações topológicas. Um estudo de caso ilustra a aplicação do modelo proposto. / The need for reliable electrical energy supply continuity, the industrial demand and its dependence has been growing worldwide. Besides, it also concerns society and assures satisfaction and comfort of consumers. The consumer is the economic agent since he takes part in the system. On analyzing an electrical system, models are needed to represent the network and the load and optimization frameworks in order to make better investments and prioritize those which can benefit the consumer and the concession holder. The usual Planning Models commonly provide us with uneconomical solutions since the optimization is carried out through active investments or network reinforcements to attend the normal and the emergency condition (n-1 criteria), based on technical criteria, like voltage and overload . Frequently, these techniques recommended by the conventional analysis can be applied only in some contingencies, some of them with a small probability of occurrence.. This research develops an alternative to the conventional solutions, considering the investment optimization and using operative resources, such as: load shedding, generation rescheduling or network change operation (circuit breaker, e.g.) when operating in contingency. In this model, the generation is represented by a function that relates the intensity rescheduling and its costs and functions that relates load shedding cost, the intensity and duration of curtailment on each system bus. The model sets a network contingency reconfiguration, changing the circuit break situation (open or closed) and altering the topology. The calculation of cost of load discontinuity or social cost functions (damage cost) is shown in this thesis, considering analytical and aggregating methods. The search for an optimized solution can involve load shedding, generation rescheduling and topology changes as substitutes for network reinforcements, and may be obtained by genetic- evolutive algorithm. The procedures of the proposed model represent an advancement over the conventional Planning Process as it introduces, quantitatively, the consumer service continuity, meeting the sensibility criteria of the load characterization of each consumer class connected to the system bus, through operative resources, rescheduling, load shedding and topology changes. A case study illustrates the application of the proposed model.
4

Recursos operativos no planejamento de expansão de sistemas de potência. / Operation procedures in power systems expansion planning

Cecilia Helena Negri de Magalhães 23 March 2009 (has links)
O requisito de continuidade de fornecimento de energia elétrica tem sido crescente na medida em que a sociedade de modo geral e os processos industriais em particular apresentam forte dependência desse insumo que assegura a todos satisfação e conforto. O consumidor é um agente econômico e ele faz parte do sistema elétrico (carga). No âmbito da análise de sistemas de potência são abordados temas, desde modelos de representação da rede e da carga até conceitos de custo da continuidade e técnicas de otimização da aplicação de investimentos para priorizar aqueles que trazem maior benefício tanto para o consumidor como para o controlador da concessão. No entanto, as técnicas usuais e convencionais de Planejamento podem conduzir a soluções pouco econômicas, porquanto consideram apenas a otimização dos investimentos em obras, ou seja, reforços da rede para atender a condição normal e em emergência (critério n-1), respeitando, naturalmente, critérios técnicos (limites de tensão, sobrecargas etc). Não raro estas instalações recomendadas pela técnica convencional serem utilizadas apenas em algumas contingências, algumas com baixa probabilidade de ocorrência. Esta pesquisa desenvolve como alternativa às soluções convencionais, um modelo que considera a otimização dos investimentos, lançando mão de recursos operativos como: corte de carga, despacho ou modificações topológicas por meio de chaveamentos, quando operando em contingência. O modelo proposto prevê que a representação da geração inclua funções que relacionam a intensidade de despacho com seus custos, bem como funções que associam custo à intensidade e duração do corte de carga a cada barra do sistema. O modelo também permite a reconfiguração da rede quando operando em contingências, por meio de alterações do estado das chaves, mudando a topologia. As funções de custo do corte de carga também são modeladas neste trabalho, considerando métodos analíticos e agregados para o cálculo do prejuízo sócio-econômico resultante da interrupção. A busca da solução ótima, que pode envolver corte de carga, despachos de geração e reconfiguração da rede, substituindo reforços realizados por obra, é obtida por um algoritmo genético evolutivo. Os procedimentos do modelo proposto representam um avanço do processo de planejamento convencional, porquanto introduz a componente continuidade de serviço de forma quantitativa, caracterizando o atendimento dos requisitos de sensibilidade das cargas de cada barra do sistema, lançando mão de recursos operativos, através de possíveis despachos e alterações topológicas. Um estudo de caso ilustra a aplicação do modelo proposto. / The need for reliable electrical energy supply continuity, the industrial demand and its dependence has been growing worldwide. Besides, it also concerns society and assures satisfaction and comfort of consumers. The consumer is the economic agent since he takes part in the system. On analyzing an electrical system, models are needed to represent the network and the load and optimization frameworks in order to make better investments and prioritize those which can benefit the consumer and the concession holder. The usual Planning Models commonly provide us with uneconomical solutions since the optimization is carried out through active investments or network reinforcements to attend the normal and the emergency condition (n-1 criteria), based on technical criteria, like voltage and overload . Frequently, these techniques recommended by the conventional analysis can be applied only in some contingencies, some of them with a small probability of occurrence.. This research develops an alternative to the conventional solutions, considering the investment optimization and using operative resources, such as: load shedding, generation rescheduling or network change operation (circuit breaker, e.g.) when operating in contingency. In this model, the generation is represented by a function that relates the intensity rescheduling and its costs and functions that relates load shedding cost, the intensity and duration of curtailment on each system bus. The model sets a network contingency reconfiguration, changing the circuit break situation (open or closed) and altering the topology. The calculation of cost of load discontinuity or social cost functions (damage cost) is shown in this thesis, considering analytical and aggregating methods. The search for an optimized solution can involve load shedding, generation rescheduling and topology changes as substitutes for network reinforcements, and may be obtained by genetic- evolutive algorithm. The procedures of the proposed model represent an advancement over the conventional Planning Process as it introduces, quantitatively, the consumer service continuity, meeting the sensibility criteria of the load characterization of each consumer class connected to the system bus, through operative resources, rescheduling, load shedding and topology changes. A case study illustrates the application of the proposed model.
5

Viabilidade do uso do biogás da bovinocultura e suinocultura para geração de energia elétrica e irrigação em propriedades rurais / The viability of using Biogas from bovine culture and swine culture to the generation of electric power and irrigation for rural proprieties

Coldebella, Anderson 20 July 2006 (has links)
Made available in DSpace on 2017-07-10T19:25:03Z (GMT). No. of bitstreams: 1 Anderson Coldebella.pdf: 3099764 bytes, checksum: d62674c1adb9dfbfbdf63d0ce7fcd744 (MD5) Previous issue date: 2006-07-20 / The present work had as an objective to evaluate the viability of the use of biogas proceeding from the activities of bovine culture of milk and swine culture in sets motor generator and motor bomb to the irrigation in agricultural properties. The experiment was done in the city of Toledo/PR, in two different properties, one with its activities directed to the bovine culture of milk with 130 animals in a regimen of confinement and the other property with its activities directed to the swine culture, working as a pig producer unit with a breeding of 1,000 breeders. Both of the properties use biodigestors to the treatment of the generated effluents and they have as byproducts the biogas and the biofertilizer. To establish the consumption of biogas per HP/hour it was used a compressor to supply a bag named gas-tank. With the amount of biogas known inside the gas-tank, it was connected to the engines, which remained working until the consumption of all the biogas. To the biogas from the bovine culture the consumption was of 0,981 m3/HP/hour to the set of motor bomb and of 2,77 m3/HP/hour to the set of motor generator, while that for the biogas from swine culture the consumption was of 1,113 m3 /HP/hour and 0,791 m3/HP/hour to motor generator and motor bomb respectively. The efficiency to the power production was of 4.14% to the biogas from bovines and of 10,3% to the biogas from swines. Considering the time of amortization of 10 years, the cost of the biogas was of R$ 0,229 / m3 for bovines and of 0,063 / m3 for swines. The cost of the electrical power generated is related to the applying of the capacity of the plan and to the cost of biogas, to the biogas from the bovine culture the cost of the generated power was of R$ 465,07/MWh and to the biogas from swine culture the cost was of R$ 90,86/MWh, considering that both of the plans be operating fir 10 hours a day. The time of return for the investment depends on the initial investment and on the price of the electric power charged by the power company, with a tariff of R$ 300,00/MWh operating the generation system for four hours a day and considering the economy generated with the irrigation system, the time of return found was of 4.3 and 6.7 years to bovines and swines respectively. Besides that, the biofertilizer generated from bovines can fertilize 37 hectares a year and the biofertilizer generated from swines can fertilize 480 hectares a year. Despite the low levels of efficiency to power generation, the time of investment return is reasonable and it can become shorter if the economy generated by the use of the biofertilizer is considered. / O presente trabalho teve por objetivo avaliar a viabilidade do uso do biogás proveniente das atividades de bovinocultura de leite e suinocultura em conjuntos motor gerador e motor bomba para irrigação em propriedades rurais. O experimento foi realizado no município de Toledo/PR, em duas propriedades, uma com as atividades voltadas para bovinocultura de leite com 130 cabeças em regime de confinamento e outra com as atividades voltadas a suinocultura trabalhando como unidade produtora de leitões com um plantel de 1.000 matrizes. Ambas as propriedades utilizam biodigestores para tratamento dos efluentes gerados e tem como subprodutos o biogás e o biofertilizante. Para determinar o consumo de biogás por HP/hora foi utilizado um compressor para abastecer uma bolsa denominada de gasômetro. Com a quantidade de biogás conhecida dentro do gasômetro o mesmo foi conectado aos motores que permaneceram em funcionamento até consumir todo biogás. Para o biogás da bovinocultura o consumo foi de 0,981m³/HP/hora para o conjunto motor bomba e de 2,77m³/HP/hora para o conjunto motor gerador, enquanto que para o biogás de suinocultura o consumo foi de 1,113m³/HP/hora e 0,791m³/HP/hora para gerador e bomba respectivamente. A eficiência para produção de energia foi de 4,14% para o biogás de bovinos e de 10,3% para o biogás de suínos. Considerando o tempo de amortização de 10 anos o custo do biogás foi de R$ 0,229 por m³ para bovinos e de R$ 0,063 por m³ para suínos. O custo da energia elétrica gerada está em função do aproveitamento da capacidade da planta e do custo do biogás, para o biogás da bovinocultura o custo da energia gerada foi de R$ 465,07 por MWh e para o biogás de suinocultura o custo foi de R$ 90,86 por MWh considerando que ambas as plantas estejam operando durante 10 horas diárias. O tempo de retorno do investimento depende do investimento inicial e do valor da tarifa de energia elétrica cobrada pela concessionária, com uma tarifa de R$ 300,00 por MWh operando o sistema de geração por 4 horas diárias e considerando a economia gerada com o sistema de irrigação o tempo de retorno encontrado foi de 4,3 e 6,7 anos para bovinos e suínos respectivamente. Além disso, o biofertilizante gerado pelos bovinos pode fertilizar 37 ha/ano e o gerado pelos suínos 480 ha/ano. Apesar dos baixos níveis de eficiência para geração de energia o tempo de retorno do investimento é razoável e pode se tornar menor se for considerada a economia gerada pelo uso do biofertilizante.
6

Viabilidade do uso do biogás da bovinocultura e suinocultura para geração de energia elétrica e irrigação em propriedades rurais / The viability of using Biogas from bovine culture and swine culture to the generation of electric power and irrigation for rural proprieties

Coldebella, Anderson 20 July 2006 (has links)
Made available in DSpace on 2017-05-12T14:48:25Z (GMT). No. of bitstreams: 1 Anderson Coldebella.pdf: 3099764 bytes, checksum: d62674c1adb9dfbfbdf63d0ce7fcd744 (MD5) Previous issue date: 2006-07-20 / The present work had as an objective to evaluate the viability of the use of biogas proceeding from the activities of bovine culture of milk and swine culture in sets motor generator and motor bomb to the irrigation in agricultural properties. The experiment was done in the city of Toledo/PR, in two different properties, one with its activities directed to the bovine culture of milk with 130 animals in a regimen of confinement and the other property with its activities directed to the swine culture, working as a pig producer unit with a breeding of 1,000 breeders. Both of the properties use biodigestors to the treatment of the generated effluents and they have as byproducts the biogas and the biofertilizer. To establish the consumption of biogas per HP/hour it was used a compressor to supply a bag named gas-tank. With the amount of biogas known inside the gas-tank, it was connected to the engines, which remained working until the consumption of all the biogas. To the biogas from the bovine culture the consumption was of 0,981 m3/HP/hour to the set of motor bomb and of 2,77 m3/HP/hour to the set of motor generator, while that for the biogas from swine culture the consumption was of 1,113 m3 /HP/hour and 0,791 m3/HP/hour to motor generator and motor bomb respectively. The efficiency to the power production was of 4.14% to the biogas from bovines and of 10,3% to the biogas from swines. Considering the time of amortization of 10 years, the cost of the biogas was of R$ 0,229 / m3 for bovines and of 0,063 / m3 for swines. The cost of the electrical power generated is related to the applying of the capacity of the plan and to the cost of biogas, to the biogas from the bovine culture the cost of the generated power was of R$ 465,07/MWh and to the biogas from swine culture the cost was of R$ 90,86/MWh, considering that both of the plans be operating fir 10 hours a day. The time of return for the investment depends on the initial investment and on the price of the electric power charged by the power company, with a tariff of R$ 300,00/MWh operating the generation system for four hours a day and considering the economy generated with the irrigation system, the time of return found was of 4.3 and 6.7 years to bovines and swines respectively. Besides that, the biofertilizer generated from bovines can fertilize 37 hectares a year and the biofertilizer generated from swines can fertilize 480 hectares a year. Despite the low levels of efficiency to power generation, the time of investment return is reasonable and it can become shorter if the economy generated by the use of the biofertilizer is considered. / O presente trabalho teve por objetivo avaliar a viabilidade do uso do biogás proveniente das atividades de bovinocultura de leite e suinocultura em conjuntos motor gerador e motor bomba para irrigação em propriedades rurais. O experimento foi realizado no município de Toledo/PR, em duas propriedades, uma com as atividades voltadas para bovinocultura de leite com 130 cabeças em regime de confinamento e outra com as atividades voltadas a suinocultura trabalhando como unidade produtora de leitões com um plantel de 1.000 matrizes. Ambas as propriedades utilizam biodigestores para tratamento dos efluentes gerados e tem como subprodutos o biogás e o biofertilizante. Para determinar o consumo de biogás por HP/hora foi utilizado um compressor para abastecer uma bolsa denominada de gasômetro. Com a quantidade de biogás conhecida dentro do gasômetro o mesmo foi conectado aos motores que permaneceram em funcionamento até consumir todo biogás. Para o biogás da bovinocultura o consumo foi de 0,981m³/HP/hora para o conjunto motor bomba e de 2,77m³/HP/hora para o conjunto motor gerador, enquanto que para o biogás de suinocultura o consumo foi de 1,113m³/HP/hora e 0,791m³/HP/hora para gerador e bomba respectivamente. A eficiência para produção de energia foi de 4,14% para o biogás de bovinos e de 10,3% para o biogás de suínos. Considerando o tempo de amortização de 10 anos o custo do biogás foi de R$ 0,229 por m³ para bovinos e de R$ 0,063 por m³ para suínos. O custo da energia elétrica gerada está em função do aproveitamento da capacidade da planta e do custo do biogás, para o biogás da bovinocultura o custo da energia gerada foi de R$ 465,07 por MWh e para o biogás de suinocultura o custo foi de R$ 90,86 por MWh considerando que ambas as plantas estejam operando durante 10 horas diárias. O tempo de retorno do investimento depende do investimento inicial e do valor da tarifa de energia elétrica cobrada pela concessionária, com uma tarifa de R$ 300,00 por MWh operando o sistema de geração por 4 horas diárias e considerando a economia gerada com o sistema de irrigação o tempo de retorno encontrado foi de 4,3 e 6,7 anos para bovinos e suínos respectivamente. Além disso, o biofertilizante gerado pelos bovinos pode fertilizar 37 ha/ano e o gerado pelos suínos 480 ha/ano. Apesar dos baixos níveis de eficiência para geração de energia o tempo de retorno do investimento é razoável e pode se tornar menor se for considerada a economia gerada pelo uso do biofertilizante.
7

Avaliação dos custos de água e energia elétrica para frutíferas irrigadas no Estado da Paraíba. / Evaluation of water and electricity costs for irrigated fruit trees in the State of Paraíba.

LOPES, Riuzuani Michelle Bezerra Pedrosa. 15 June 2018 (has links)
Submitted by Johnny Rodrigues (johnnyrodrigues@ufcg.edu.br) on 2018-06-15T20:28:16Z No. of bitstreams: 1 RIUZUANI MICHELLE BEZERRA PEDROSA LOPES - DISSERTAÇÃO PPGEA 2008..pdf: 44618002 bytes, checksum: 10bd1e265640cd193f330756b03247d2 (MD5) / Made available in DSpace on 2018-06-15T20:28:16Z (GMT). No. of bitstreams: 1 RIUZUANI MICHELLE BEZERRA PEDROSA LOPES - DISSERTAÇÃO PPGEA 2008..pdf: 44618002 bytes, checksum: 10bd1e265640cd193f330756b03247d2 (MD5) Previous issue date: 2008-02 / Busca-se, com a realização deste trabalho, a avaliação dos custos de água e energia elétrica para frutíferas irrigadas no Estado da Paraíba. Com este propósito se obtiveram, de início, as demandas de água e energia elétrica para as culturas do mamão, coco e banana, através do sistema de irrigação por aspersão e microaspersão. João Pessoa, Capital da Paraíba, localizada no baixo Rio Paraíba, é o município de menor consumo de água, necessitando de apenas de 37,71, 40,6 e 44,7% das demandas de água e energia elétrica do município de Desterro para as culturas do mamão, coco e banana, respectivamente. O município de Desterro, localizada na subbacia do Taperoá, apresentou a maior evapotranspiração anual e diária, combinada com as menores precipitações anuais, enquanto o município de João Pessoa, localizado no Baixo Rio Paraíba, teve a menor média de evapotranspiração, combinado com boas médias de precipitação provável a nível de 75% de probabilidade de ocorrer; desta forma, Desterro necessita de uma reposição maior de água para as plantas, o que acarreta também maior custo com água e energia elétrica. A demanda de água e energia elétrica aumenta na medida em que os municípios se afastam do litoral paraibano, devido às características hidroclimáticas dos locais do estudo. A região do Baixo Rio Paraíba, obteve as menores médias de demanda e a sub-bacia do Taperoá, obteve as maiores médias de demanda de água e energia elétrica, assim os maiores custos de água e energia elétrica ocorreram na sub-bacia do Taperoá e os menores custos no Baixo Rio Paraíba. Para a agricultura irrigada, a cobrança de água a ser implementada pelo comité da bacia do Rio Paraíba pode servir de incentivo, desde que sejam cobradas tarifas diferentes, isto é, implementar uma tarifa menor para os sistemas de irrigação mais eficientes, acarretando assim, maior economia no consumo de água e, consequentemente menor impacto na bacia, além de uma produção maior por hectare, com o mesmo volume de água captado. Palavras-chaves: Simulação, irrigação, frutíferas. / iis work deals with the evaluation of the costs of power and water for irrigated the planning áreas in Paraíba State. First, the demands of water were obtained and power electricity for cultures of papaya, coconut and banana using the irrigation system based on aspersion e microaspersion. João Pessoa, capital of Paraíba State, located in the lower Paraíba River, is the city which has the lowest water consumption and it requires only 37.71, 40.6 and 44.7% the demands of power and water of Desterro city for cultures of papaya, coconut and banana, respectively. The city of Desterro, located at the basin of Taperoá River, has presented the highest leveis for annual and daily evapotranspiration combined with the lowest rain rates. On the other hand, Jõao Pessoa, presented in the lower Paraíba River, presented the lowest leveis for average evapotranspiration and good rain rates of 75% of occurrence probability. Thus, the city of DesteiTO needs a higher reposition of water for the plants which leads a higher costs of water and electrical power. For cities located in the Paraíba State, the demand of water and electrical power increases when the distance between the cities and the offshore increases as a consequence of the precipitation and weather carachateristics of the cities used in this study. The region of the lower Paraíba River achieved the lowest average leveis for demand of water and electrical power while the sub-basin of the Taperoá River achieved the highest average leveis. Thus, the highest costs of water and electrical power occurred in sub-basin of the Taperoá River and lowest ones occurred in the lower Paraíba River. For irrigated agriculture, the taxes for the use of water should be implemented by the committe of the River Paraíba and they can be serving as a motivation for the efficient use of the water. In this case, lower taxes can be applied for efficient irrigation systems. So, a lower consumption of water should be achieved and the higher productivity by hectare can be obtained for the same volume of water. Keywords: Irrigation, simulation, planning

Page generated in 0.0671 seconds