• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 27
  • Tagged with
  • 28
  • 11
  • 11
  • 11
  • 11
  • 11
  • 11
  • 9
  • 9
  • 9
  • 8
  • 8
  • 5
  • 4
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Informe de competencias y actividades desarrolladas como asistente de supervisión y el área costos metrados y valorizaciones, en la construcción del Hospital Tingo María - Huánuco

Bernabe Torres, Herson Pedro 07 November 2018 (has links)
Hoy en día la universidad se convierte en un ente muy importante en la formación del alumno, ya que con los conocimientos adquiridos en teoría y práctica en las aulas y laboratorios de la carrera universitaria pasa el alumno al campo laboral para aplicar a la realidad los conocimientos de las diversas materias aprendidas. Los Hospitales al considerarse una de las edificaciones más complejas debido a que para su concepción, diseño y ejecución agrupa a muchos profesionales y especialistas como Ingenieros geotécnicos, estructurales, de costos, eléctricos, electrónicos, mecánicos, sanitarios, ambientales; arquitectos, médicos y otros. Además, las normas Técnicas de Salud Vigentes en el Perú, los mismos que ponen parámetros y consideraciones mínimas a tomar en cuenta según el nivel y categoría de las infraestructuras que brindan salud, tomando como base la Norma Técnica de Edificaciones. A fin de garantizar la buena práctica de construcción e inversión por ser el Hospital Tingo María una obra pública, el Gobierno Regional de Huánuco, bajo las normas de contrataciones públicas, asigna a la Supervisión de obra para el proyecto: “Mejoramiento de la capacidad resolutiva del hospital Tingo María - provincia Leoncio Prado - Región Huanuco”; con un contrato por el sistema de suma alzada, con un plazo de 660 días calendarios para su ejecución. El manejo de los costos, metrados y valorizaciones de los proyectos de infraestructura es de vital importancia, considerando que la obra cuenta con un presupuesto inicial, el cual debe ser pagado al contratista según los avances en la ejecución; Por otro lado, las ejecuciones de trabajos no contratados originan prestaciones adicionales de obra el cual debe ser evaluado de acuerdo a sustentos, costos y plazos. Del mismo modo el plazo contractual de la obra se puede modificar debido a ampliaciones de plazo por causas no atribuibles al contratista; la aprobación de ampliaciones de plazo origina actualizar los cronogramas vigentes de obra y el pago de mayores gastos generales de ser el caso, así también contratista puede solicitar adelanto por materiales e insumos. Los controles de calidad de la ejecución, con el fin de cumplir lo señalado en los Planos, Especificaciones Técnicas y Normas Vigentes; se realiza mediante protocolos de calidad o listas de Chequeo; considerándose un documento de control y verificación del cumplimiento de los requisitos básicos de ejecución.
2

Saneamiento y reasentamiento de edificaciones afectadas ante la ejecución de obras en la carretera Catac-Huari – Pomabamba Tramo: San Marcos Km. 78+400 – Huari Km. 110+000

Basilio Valqui, José Manuel January 2007 (has links)
Por lo general, en el interior de nuestro País los pobladores desconocen las limitaciones para construir viviendas cerca de la vía principal que atraviesa un poblado, ellos tienden a construir sus viviendas cerca de la vía principal sin tener en cuenta que en un futuro se realizaran mejoras y/o ensanchamiento en la vía; por tal motivo el presente estudio esta orientado en dar a conocer éstas limitaciones para futuras construcciones y proponer nuevas técnicas de construcción con material propio de la zona como es el adobe.
3

BIM, para asegurar el costo contractual de obra y su implementación en un proyecto multifamiliar

Viñas Villa, Valerie 10 February 2016 (has links)
La presente investigación, estudia el comportamiento y los resultados que se obtienen durante la construcción de edificios multifamiliares en Lima. Los proyectos analizados, corresponden a 2 empresas del rubro, una constructora y una gerencia de proyectos. El mercado actual promueve, proyectos más complejos con entregas en menor tiempo, acompañados de una serie de exigencias y soluciones cada vez más complejas. Esto genera que muchos de estos proyectos se desarrollen sin los controles de calidad y exigencias que ameritan los proyectos para su construcción. Generando numerosas incompatibilidades e interferencias. A consecuencia de estas deficiencias, los proyectos son castigados, por penalidades, sobre costos, perdidas sobre las utilidades, etc. Con la finalidad de lograr el mejor desempeño y agilizar los procesos, garantizando un mayor control y mejora continua para la construcción de edificios multifamiliares, se pretende mostrar los beneficios de BIM, para el control de interferencias, incompatibilidades de manera oportuna, así como otros beneficios que aporta a los proyectos. El estudio ha recolectado información de 5 proyectos. Presupuestos, información técnica, costo de adicionales, listado de RFI, programaciones, plazos de entrega, etc. El análisis de la Información ha mostrado, ratios, tendencias, porcentajes, lo que ha permitido, mapear la situación real de los proyectos tradicionales y aquellos que utilizan BIM. Esta fotografía nos ha entregado, el sin número de bondades “teóricas” ofrecidas por BIM, en cifras tangibles que fundamentan la importancia del uso de esta tecnología y como estas cifras, pueden servir de referencia para la toma de decisiones dentro de una empresa. Es importante concluir que con la implantación de BIM, se genera un mejor desempeño de los procesos, se obtienen beneficios positivos para la construcción de la obra y para el aseguramiento de las ganancias proyectadas en la propuesta económica inicial. / Tesis
4

Gestión de la producción del casco estructural en el proyecto Miragolf y su impacto económico

Alvarez Flores, Gilmer Anguelo, Pérez Garavito, Carlos Jordy, Rojas Flores, Paul Christian 02 January 2015 (has links)
La importancia de realizar una planificación o gestión de la producción en una obra como proyecto de Tesis, finalizó con la entrega de este documento. El cual brindó un significativo aporte hacia nuestras expectativas. El tema de Tesis se origina de los problemas encontrados en la obra “Miragolf” de la empresa constructora C & J. Nuestro proyecto de Tesis determinó el cumplimiento del objetivo que define: “Demostrar que mediante el uso de herramientas del sistema de gestión de producción se genera mayor rentabilidad al proyecto”. Además de cumplir con los objetivos específicos que define: • Presentar el marco teórico de las herramientas de gestión de producción. • Presentar el diagnóstico del desarrollo del proyecto. • Presentar la aplicación del sistema de gestión de producción. • Presentar el análisis económico mediante la propuesta de valor. • Presentar el análisis de resultados.
5

Implementación de metodologías para la gestión de residuos de construcción y demolición en edificaciones de vivienda de material noble en Lima

Medina Hinojosa, Marco A. January 2015 (has links)
Los fenómenos del desarrollo de megaciudades ha afectado a todo el mundo incluyendo al Perú, esto se ve reflejado en el crecimiento del sector construcción en Lima, su capital. La acumulación de desechos frente a un crecimiento sostenible en nuestra ciudad es de gran importancia es así como el tema del manejo de los desechos de construcción y demolición ha motivado esta investigación sugiriendo la implementación de mejoras en los procesos bajo las filosofías Just in Time y Lean Construction.
6

Proyecto de construcción de “Edificio Barcelona 209”

Palomino, Marcel, Sanz Sanz, Laura, Cabrejos Pesantes, Tatiana, Noél Cordova, Melissa 10 1900 (has links)
El presente trabajo tesis tiene como objetivo mostrar los procesos de: Inicio, planificación, ejecución, monitoreo y control y cierre de los entregables de gestión y construcción dentro del proyecto inmobiliario, Edificio Barcelona 209. El esquema de desarrollo de la tesis se ejecutará en cinco capítulos en los que se pasa por todas los procesos la Guía del PMBOK 5ª edición, partiendo de la configuración del Caso de negocio del proyecto desde el marco referencial de la empresa; marco conceptual en el que se exponen las bases que rigen la dirección de proyectos basada en la Guía del PMBOK 5ª edición; identificando la documentación en los grupos de proceso de: inicio, planificación, ejecución control y cierre y por último se cierra con las conclusiones y recomendaciones. Esta tesis servirá de guía para los proyectos de la empresa aumentando los activos de procesos de la organización. / Tesis
7

Determinación de los índices de vulnerabilidad estructural de edificaciones de albañilería confinada, empleando el método japonés

Retis Jiménez, Ricardo Andrés January 2015 (has links)
La actividad sísmica presente en el Perú tiene su origen en el proceso de convergencia de la placa de Nazca bajo la sudamericana, el mismo que se produce con una velocidad promedio del orden de 7-8 cm/año. Este proceso es responsable de la ocurrencia de los sismos que con diversas magnitudes se producen frente a la línea costera y a profundidades menores de 60km.
8

Reforzamiento antisísmico en hospitales utilizando amortiguadores de fluido viscoso

Cáceres Pérez, Gladys, Pichihua Alata, Natali Sheyla 16 October 2019 (has links)
En control antisísmico, se ha concluido que la adición de disipadores de fluido viscoso incrementa el amortiguamiento y controla los desplazamientos laterales de las estructuras, salvaguardándolas del posible colapso. El objetivo de este trabajo es comparar la respuesta de estructuras esenciales de albañilería confinada mayores a 50 años, con y sin amortiguadores viscosos. Adicionalmente, se analiza la estructura con una técnica de reforzamiento tradicional como son las placas de concreto armado, con el objetivo de evaluar la viabilidad de la primera propuesta. Los resultados indican que, con un reforzamiento con amortiguadores, las derivas se reducen de un 5.98%o a 3.33%o, y 4.42%o al implementar los muros de concreto armado, lo cual demuestra la viabilidad de la propuesta en respuestas estructurales. / In seismic control, it has been concluded that the addition of viscous fluid dissipaters increases the damping and controls the lateral displacements of the structures, safeguarding them from possible collapse. The objective of this work is to compare the response of essential structures of confined masonry over 50 years, with and without viscous dampers. Additionally, the structure was analyzed with a traditional reinforcement technique such as reinforced concrete plates, with the objective of evaluating the viability of the first proposal. The results indicate that, with a reinforcement with shock absorbers, the drifts are reduced by 5.98%o or 3.33%o, or 4.42%o or by implementing the reinforced concrete walls, which demonstrates the viability of the proposal. / Trabajo de investigación
9

Evaluación de las propiedades mecánicas de la madera laminada cruzada (CLT) mediante ensayos de resistencia para mejorar el comportamiento estructural de muros de madera elaborados con una especie de mediana densidad / Evaluation of the mechanical properties of cross laminated timber (CLT) through resistance tests to improve the structural behavior of wooden walls made with medium-density species

Llerena Pillaca, Wilder Leoncio, Paco Gomez, Abel 29 April 2020 (has links)
La presente investigación corresponde a la evaluación de las propiedades mecánicas de la madera contralaminada (CLT) elaborados con una especie de mediana densidad mediante ensayos de resistencia para mejorar su comportamiento como muros estructurales en edificaciones. La aplicación de la madera laminada cruzada denominada también CLT (Cross Laminated Timber) como material estructural en la construcción de edificaciones permitiría un mejor aprovechamiento del potencial forestal de muchos países, haciendo que este sector sea más sostenible. Esta aplicación es factible siempre en cuando el material a emplear cumpla con las solicitaciones de resistencia que demanda su uso estructural y su proceso industrial sea compatible con las condiciones y la oferta existente en el entorno. Para lograr este propósito, se elaboraron prototipos de paneles CLT con madera Cachimbo, especie de mediana densidad denominado científicamente como Cariniana doméstica perteneciente a la familia Lecythidaceae. Se realizaron ensayos para determinar las propiedades mecánicas de resistencia a esfuerzos de compresión perpendicular y paralela a las fibras de las capas exteriores, esfuerzo de flexión y resistencia al corte. Los procedimientos fueron realizados siguiendo normativas de madera contralaminada como la española EN16351, el EC5 y la E.010 de madera. Los resultados obtenidos dan cuenta que los paneles CLT elaborados con Cachimbo son capaces de resistir los requerimientos de carga que podría demandar una edificación de mediana altura y cumple con los requisitos básicos especificados en las normativas. Las resistencias alcanzadas son similares a las obtenidas con maderas de tipo coníferas en estudios realizados en otros países, siguiendo los mismos criterios y normatividad. / The present investigation corresponds to the evaluation of the mechanical properties of the Cross Laminated Timber (CLT) made with medium density species by means of resistance tests to improve its behavior as structural walls in buildings. The application of the cross laminated wood also called CLT (Cross Laminated Timber) as structural material in the construction of buildings would allow a better use of the existing forest potential in many countries, making this sector more sustainable. This application is feasible as long as the material to be used complies with the stresses of resistance that its structural use demands, and its industrial process is compatible with the conditions and the existing offer in the environment. To achieve this purpose, prototypes of CLT panels were made with Cachimbo wood, a medium-density species scientifically called Carinianadomestic belonging to the Lecythidaceae family. Tests were carried out to determine the mechanical properties of resistance to perpendicular and parallel compression stresses to the fibers of the outer layers, bending stress and shear strength. The procedures were carried out following norms of contra-laminated wood such as the Spanish EN16351, the EC5 and the Peruvian E.010 wood regulations. The results obtained show that the CLT panels made with Cachimbo can withstand the load requirements that a medium-height building could demand and meets the basic requirements specified in the regulations. The strengths achieved are similar to obtained with coniferous woods in studies carried out in other countries, following the same criteria and regulations. / Trabajo de investigación
10

Vulnerabilidad sísmica de edificaciones esenciales. Análisis de su contribución al riesgo sísmico

Safina Melone, Salvador 21 February 2003 (has links)
El presente trabajo se dedica al estudio de la vulnerabilidad y riesgo sísmico de las edificaciones esenciales. Se destaca la relevante función que desempeñan en la atención y gestión de la emergencia debido a sismos y la necesidad de crear un cuerpo de prescripciones específicas que permita adecuar las edificaciones existentes y construir las nuevas con requisitos compatibles a su nivel de importancia. Una revisión de los antecedentes y del estado del arte revela un balance negativo en el comportamiento sísmico de las edificaciones esenciales, inclusive ante la acción de sismos moderados, destacándose: (i) la insuficiencia de las metodologías adoptadas en los códigos sísmicos vigentes para proteger este tipo de edificaciones, (ii) la necesidad de abordar su evaluación desde un punto de vista global que considere la vulnerabilidad física (estructural y no estructural) y la vulnerabilidad funcional y (iii) la importancia de considerar la interacción entre los diferentes elementos que conforman un sistema esencial, con otros sistemas y líneas vitales. Esta interacción constituye el fundamento del llamado enfoque sistémico.Se propone una estrategia general de evaluación de la vulnerabilidad sísmica de los sistemas esenciales basado en el enfoque sistémico. Esta estrategia persigue racionalizar la toma de decisiones por vía de aproximaciones sucesivas, jerarquizando las necesidades de realizar estudios más refinados que justifiquen las medidas de intervención. En este sentido, para calificar la capacidad de respuesta de estas edificaciones es conveniente utilizar los conceptos del diseño basado en el desempeño sísmico.Sobre esta base se desarrolla un modelo simplificado para la evaluación de la respuesta sísmica del sistema sanitario regional como paradigma de edificios y sistemas esenciales en caso de desastre. El modelo permite la calificación del desempeño global del sistema sanitario y de cada uno de los hospitales que le integran en base a factores de respuesta específicamente definidos para su cuantificación.La aplicación realizada sobre el sistema sanitario de Cataluña pone en evidencia que su capacidad de respuesta es especialmente sensible a la ubicación del epicentro del evento sísmico. Se observa un deficiente condicionamiento del sistema sanitario para sismos con epicentros ubicados en las regiones norte y noroeste de Cataluña, así como en los alrededores de la ciudad de Barcelona y la franja costera vecina. Los resultados obtenidos permiten establecer una clasificación y jerarquización preliminar de los 64 hospitales de Cataluña, según la cual, 14 hospitales (22%) presentan una respuesta aceptable, 35 hospitales (55%) una respuesta intermedia y 15 hospitales (23%) una respuesta crítica distribuidos principalmente en las regiones sanitarias de Girona, Barcelonés Nord i Maresme, Barcelona Ciutat y Centre. Se concluye la necesidad de realizar estudios más refinados de vulnerabilidad sísmica sobre los hospitales que experimentan un desempeño sísmico insuficiente. / This work is addressed to the vulnerability and seismic risk study of essential buildings. The outstanding role these structures in the earthquake emergencies is emphasised and the necessity of creating a volume of specific prescriptions which allow to adequate the existing structures and to build the new ones with requirements compatible with their level of importance. A review of the background and the state of the art reveal a negative balance in terms of the seismic behaviour of the essential buildings, even under moderate actions. It should be highlighted: (i) the insufficiency of the methodologies found on the updated seismic codes in order to protect these types of buildings, (ii) the necessity of its evaluation from a global point of view that considers the seismic vulnerability (structural and non-structural) and the functional vulnerability, and (iii) the importance of considering the interaction between the elements which conform an essential system, with other systems and lifelines. This interaction is the fundamental part of the so-called systemic approach.A general strategy based on the systemic approach is proposed for the evaluation of seismic vulnerability of essential systems. This strategy is intended to rationalise the decision making, through successive approximations, prioritising the need for more accurate studies, which could justify the intervention measures. In order to measure the response capability of these structures is convenient to use the design concepts based on the seismic performance.On this basis a simplified model is developed to evaluate the seismic response of the regional health facilities as a paradigm of essential systems in case of a disaster. This model allows the qualification of the global performance of the health system and each hospital through response factors precisely defined for this purpose.The application of the method to the health system of Catalonia brings up that its response capability is especially sensitive to the location of the epicentre of the seismic event. It is observed a deficient conditioning of the health system for seismic events with epicentres located north and noth-west of Catalonia, the surroundings of Barcelona city and the neighbour coast stripe. The results obtained allow a preliminary classification and hierarchization of the 64 Catalonian hospitals. According to these result, 14 hospitals (22%) show an acceptable response, 35 hospitals (55%) show an intermediate response, and 15 hospitals (23%) mainly located in the regional health administration of Girona, Barcelona Nord and Maresme, Barcelona city and Centre. It is concluded the necessity of developing more accurate studies on seismic vulnerability on the hospitals that present an insufficient seismic performance.

Page generated in 0.0861 seconds