• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 6
  • Tagged with
  • 6
  • 6
  • 6
  • 5
  • 5
  • 5
  • 5
  • 5
  • 5
  • 5
  • 4
  • 4
  • 4
  • 4
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Aplicación de la herramienta Scrum para la reducción de RFIS y No conformidades en la construcción de viviendas multifamiliares / Implementation of SCRUM to the reduction of RFI and nonconformities in the construction of residential buildings

Chumpitaz Guzmán, Brayan Ángelo, Rubio Noriega, Junior Obidio Segundo 13 May 2020 (has links)
El éxito en el desempeño de los proyectos de construcción depende de múltiples factores internos y externos y, precisamente, uno de estos principales factores se consigue a través de una adecuada gestión en la planificación de las actividades, la cual tiene como principales objetivos reducir pérdidas, sobre costos y plazos de cronograma. Debido a esto, la industria se encuentra en una constante búsqueda de modelos de gestión que permitan alcanzar dichos objetivos. Es precisamente, el modelo Agile Scrum, concebido en la ingeniería de software, el que surge como una alternativa a la gestión de proyectos tradicionales brindando una mejora exponencial en la comunicación del equipo de proyecto y potenciando la planificación de las actividades con la implementación de un marco iterativo de trabajo que permita la flexibilidad en los cambios de requerimientos, reducción de incertidumbre y confiabilidad en lo planificado. Por ello, surge la necesidad de aplicar y adaptar este modelo dentro del sector construcción con el objetivo de reducir las solicitudes de información (RFI) y No Conformidades en calidad y así contribuir a la mejora en el desempeño del proyecto. / The success of performing in construction projects depends on plenty of internal and external factors. One of them, undoubtedly, is an accurate planning of daily activities, which main objective is the reduction of over costs, time schedule and reworks. As a result, the Construction industry is now on constant search for new project management models which allow the achievement of these objectives. It is precisely, the agile SCRUM model, developed in the software industry, in which arise as an alternative of the traditional project management models. which providing an exponential improvement in communication, increasing reliability of planned activities with the incorporation of iterative framework which provides flexibility in requirement changes and reduction of uncertainty. Therefore, it is necessary the implementation and adapting of this model inside the construction industry with the objective of a reduction of requests for information (RFI) and nonconformities in quality in order to improve the performance of the construction projects. / Trabajo de investigación
2

Mejora de la productividad por medio de la herramienta cartas balance en un edificio multifamiliar en la ciudad y provincia de Chiclayo, departamento de Lambayeque

Tullume Uceda, Felix Alejandro January 2019 (has links)
La presente tesis tiene como finalidad mejorar la productividad en los diferentes procesos de construcción de una edificación multifamiliar, mediante la aplicación de la herramienta Cartas Balance bajo un enfoque Lean Construction, con la cual realizando una medición continua se identificarán los tiempos productivos, contributorios y no contributorios en cada partida analizada, realizando con esto las propuestas de mejoras correspondientes a cada proceso. Al finalizar la implementación de la herramienta Cartas Balance, se podrá comparar la forma tradicional de construir con la implementación de la filosofía Lean Construction, viendo los beneficios que trae consigo ésta.
3

Implementación de Gestión BIM para una constructora de Edificios Multifamiliares como soporte del área de planificación de una obra en ejecución

Briceño Ynfante, Maikol Giancarlo, Cabanillas Risco, Jhonatan Antonio, Campos Canchucaja , Jhon Wilfredo, Munayco Pineda, Hernando Luis 10 January 2020 (has links)
El tema de la presente tesis busca implementar la gestión BIM en una empresa constructora. La investigación busca conocer el impacto que hubiese generado el implementar al inicio de la ejecución una gestión BIM, nuestro proyecto en estudio no implementó esta herramienta, con esto se quiere conocer el impacto positivo que se hubiese generado en el tiempo del proyecto de haberse implementado esta herramienta. Para nuestra investigación se empleará el análisis cuantitativo y cualitativo. El primer capítulo corresponde al planteamiento metodológico el cual está conformado por la formulación del problema, objetivos, justificación del problema, delimitación y la metodología de estudio. El segundo capítulo corresponde al marco teórico el cual está conformado por los antecedentes de investigación, marco para la implementación de Gestión BIM, Last Planner System y contratos colaborativos. El tercer capítulo corresponde al desarrollo de la investigación el cual está conformado por antecedentes del proyecto, evaluación de los entregables, cronología de la obra, cronogramas, RFI’s y conclusiones. El cuarto capítulo corresponde a la propuesta de solución el cual está conformado por la Implementación PEB, análisis de RFI’s en sesiones ICE, modelamiento de RFI’s, modelamiento BIM, desarrollo 4D con naviswork, cronogramas finales con uso BIM, Análisis Impacto Costo y Análisis impacto pandemia covid-19. El quinto capítulo corresponde a las conclusiones. El sexto capítulo corresponde a las recomendaciones. / The subject of this thesis seeks to implement BIM MANAGEMENT in a construction company. The research seeks to know the impact that was generated by implementing the BIM MANAGEMENT at the beginning of the execution of our project, our project under study did not implement these tools, with this we want to know the positive impact that had been generated in the time of perform implemented these tools. Part of our research, quantitative and qualitative analysis will be used. The first chapter corresponding to the methodological approach which is made up of the formulation of the problem, objectives, justification of the problem, delimitation and the study methodology. The second chapter corresponding to the theoretical framework which is made up of the research background, framework for the implementation of BIM Management and collaborative contracts. The third chapter corresponds to the development of the research which is made up of the executive summary of the project, evaluation of the deliverables, chronology of the work, schedules and RFIs. The fourth chapter corresponds to the solution proposal which is made up of the PEB Implementation, RFI's analysis, RFI's modeling, 4D development, and final schedule. The fifth chapter corresponds to the conclusions. The sixth chapter corresponds to the recommendations. / Trabajo de investigación
4

Propuesta de mejora de la gestión de procura de encofrado metálico para la construcción de edificios multifamiliares en Lima Metropolitana

Chamorro Rodríguez, Julio Ernesto, Ríos Alzamora, Thomas Guido 16 July 2021 (has links)
El presente trabajo de investigación tiene como objetivo elaborar un plan de mejora de la gestión de procura del encofrado metálico con la finalidad de reducir la variabilidad en el costo final del alquiler de encofrado y apuntalamiento durante la etapa constructiva de edificios multifamiliares ejecutados en la ciudad de Lima metropolitana. Se analizaron datos de cinco proyectos ejecutados en Miraflores, Jesús María, Barranco y Lima Cercado en los cuales se registraron diferencias económicas negativas respecto al presupuesto inicial de alquiler de encofrado. Se realizo encuestas a las personas involucradas en el proceso de procura de encofrado para identificar las causas de estas variaciones de costo y mediante herramientas de gestión se determinaron cuáles fueron las de mayor incidencia. Finalmente se estableció un plan de mejora del proceso tomando en cuenta los defectos y omisiones encontrados en las gestiones de procura de los proyectos que se tomaron como objeto de estudio y además se incorporaron algunas herramientas que permitan mejorar la comunicación entre el constructor y los proveedores de los equipos de encofrado. / The objective of this research work was to elaborate a plan to improve the management of the metallic formwork procurement in order to reduce cost overruns in the formwork rental and shoring during the construction stage of multifamily buildings executed in the city of metropolitan Lima. Data from five projects executed in Miraflores, Jesús María, Barranca and Lima Cercado were analyzed, in which negative economic differences were registered with respect to the initial formwork rental budget. Surveys were carried out among the people involved in the formwork procurement process to identify the causes of these cost variations and through management tools it was determined which were the ones with the highest incidence. Finally, a process improvement plan was established, taking into account the errors and omissions found in the projects that were taken as the object of study, and some tools were also incorporated to improve communication between the constructor and the companies that rent the formwork equipment. / Tesis
5

Propuesta de aplicación de elementos prefabricados de concreto armado para mejorar la productividad en la construcción de edificios multifamiliares en Lima / Proposal for the application of precast reinforced concrete elements to improve productivity in the construction of multifamily buildings in Lima

Perez Santamaria, Sandra Pamela, Soplin Diapiz, Luz Clarita 18 February 2022 (has links)
La industria de la construcción de viviendas en Lima, tiene como principal característica la aplicación de métodos de construcción tradicionales, basados en construcción in situ. Los procesos constructivos implican una serie de actividades de gran complejidad que muchas veces alteran la producción y dificultan el eficiente empleo de los recursos. Por ejemplo, la alta demanda de mano de obra genera un entorno de incertidumbre en los procesos de producción, por una mayor probabilidad a errores que generan pérdidas. En los últimos años se han hecho importantes esfuerzos para optimizar los recursos y mejorar la eficiencia y el desempeño de la construcción convencional a través de metodologías y herramientas como Lean Construction, BIM, Last Planner entre otros; sin embargo, alcanzados sus máximos posibles, no logran incrementar la productividad ni disminuir los efectos adversos de la construcción tradicional en términos reales a través del tiempo. Por ende, este estudio propone la aplicación de los sistemas constructivos prefabricados altamente industrializados en la construcción del casco estructural de viviendas multifamiliares con el objetivo de elevar la productividad a los estándares internacionales. Del estudio se encontró una reducción del 5% en el costo por metro cuadro de construcción y una reducción en el plazo y el costo de la mano de obra del 26% y 61% respectivamente. Se puede concluir que el método de construcción por prefabricados permite incrementar la productividad dado un eficiente empleo de los recursos como la mano de obra, materiales y el tiempo de construcción. / The main characteristic of the housing construction industry in Lima is the application of traditional construction methods, based on on-site construction. Construction processes involve a series of highly complex activities that often alter production and hinder the efficient use of resources. For example, the high demand for labor generates an environment of uncertainty in the production processes, due to a greater probability of errors that generate losses. In recent years, significant efforts have been made to optimize resources and improve the efficiency and performance of conventional construction through methodologies and tools such as Lean Construction, BIM, Last Planner, among others; however, having reached their maximum possible levels, they fail to increase productivity or reduce the adverse effects of traditional construction in real terms over time. Therefore, this study proposes the application of highly industrialized prefabricated construction systems in the construction of the structural hull of multi-family homes with the aim of raising productivity to international standards. The study found a 5% reduction in the cost per square meter of construction and a reduction in the term and cost of labor of 26% and 61%, respectively. It can be concluded that the prefabricated construction method allows increasing productivity due to an efficient use of resources such as labor, materials and construction time. / Tesis
6

Propuesta de uso de la herramienta dynamo para optimizar el tiempo en el proceso de valorización de subcontratistas de acabados en edificios multifamiliares menores de 10 pisos de NSE A y B ejecutado por una Pyme constructora en Lima Metropolitana / Proposal for the use of Dynamo software to optimize time in subcontractor’s schedule of values of finishes process in less than 10-story multi-family buildings of Socioeconomic Status A & B executed by a small and medium-sized construction enterprise in Metropolitan Lima

Chavez Guerrero, Rodrigo Americo, Vilchez Chung, Sebastian Rodrigo 25 June 2021 (has links)
Lima es el principal escenario de desarrollo de proyectos de vivienda, por ello es una importante fuente de oportunidades para las empresas constructoras. Un significativo porcentaje de estas lo conforman pequeñas y medianas empresas, que buscan estrategias para competir en el mercado. Por ejemplo, la canalización de sus actividades a través de la subcontratación. En este escenario, suelen presentarse dificultades en el proceso de valorización de los subcontratistas de las partidas de acabados, dado que son tareas que requieren de mayor tiempo y detalle para validar. Estos problemas son resueltos de manera sintomática porque no se trabaja con herramientas que permitan anticiparlos ni entenderlos en su totalidad. El objetivo de la presente investigación es desarrollar una propuesta de solución frente a los problemas identificados, a través de la implementación de una herramienta de programación visual (Dynamo) dentro de un entorno de trabajo BIM, que permita optimizar el tiempo en el proceso de valorización de subcontratistas de acabados en edificios multifamiliares menores de 10 pisos de NSE A y B ejecutado por una PYME constructora en Lima Metropolitana. Se realizaron entrevistas a profesionales encargados de realizar las valorizaciones para identificar las principales deficiencias que se presentan en este proceso y de esta forma, plantear la propuesta de solución. Finalmente, se realizó la validación de la propuesta de solución a través del juicio de expertos, como resultado de las opiniones emitidas por estos y su nivel de interés percibido se concluyó que la propuesta sería de gran aporte en una posible implementación. / Lima has been the main scenario for the development of building projects, which makes it an important source of opportunities for construction enterprises. A significant percentage of these are made up of small and medium-sized enterprises (SMEs), which constantly seek strategies to compete in the construction industry. One of these is assigning their activities through subcontracting. In this common practice, difficulties often arise in subcontractor’s schedule of values of finishes process, since they are tasks that demand more time and detail to track the progress, even more critical situation in projects with a reduced site-based staff. These problems are solved symptomatically because they do not work with tools for anticipate or understand them entirely. The objective of this research is to develop a proposed solution to the problems identified, through the implementation of a visual programming tool (Dynamo) within a BIM environment, for optimize time in subcontractor’s schedule of values of finishes process in less than 10-story multi-family buildings of Socioeconomic Status A & B executed by a construction SME in Metropolitan Lima. In order to identify the main deficiencies that appears in traditional process, interviews were conducted with in-charge professionals of subcontractor’s schedule of values of finishes. Then, collected information was analyzed to propose a solution for the problem. Finally, the proposed solution was validated through expert judgment, which through the opinions expressed by the professionals and their perceived level of interest, it was concluded that the proposal would be of great contribution in a possible implementation. / Tesis

Page generated in 0.0836 seconds