• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 9
  • Tagged with
  • 9
  • 9
  • 8
  • 7
  • 6
  • 6
  • 5
  • 5
  • 5
  • 5
  • 5
  • 5
  • 5
  • 4
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Modelo de Producción para la Reducción de Tiempos de Entrega de Pedido en una empresa metalmecánica de Lima Metropolitana basado en Six Sigma / Production Model for the Reduction of Order Delivery Time in a Peruvian Metalworking Company Based on the Six Sigma DMAIC Methodology

Espinoza Cuadros, Anelit Nelva, Criollo Marcavillaca , Miriam Rosalinda 04 April 2020 (has links)
El principal problema que enfrenta un fabricante de tableros eléctricos es la alta tasa de demora en entrega de pedidos. El factor predominante que han dado lugar al retraso de la entrega de pedidos es el cuello de botella que se genera en el proceso productivo. Para resolver este problema, se desarrolló una propuesta innovadora utilizando la metodología DMAIC (Definir, Medir, Analizar, Mejorar y Controlar), la cual esta orientada a la mejora de procesos utilizada por Six Sigma [1] [2]. Para respaldar este análisis, se realizará una simulación, buscando una reducción considerable del cuello de botella y, por consecuencia, el aumento de productividad, mejorando el tiempo de entrega de pedidos. Al implementar la metodología DMAIC Six Sigma, se mejorará el tiempo de entrega de pedidos a 96%, mejorando así la calidad del proceso de producción y generando beneficios económicos. / The main problem faced by a manufacturer of electrical panels is the high rate of late delivery of orders. The predominant factor that has led to the delay in order delivery is the bottleneck generated in the production process. To solve this problem, an innovative proposal was developed using the DMAIC (Define, Measure, Analyze, Improve and Control) methodology, which is oriented to the process improvement used by Six Sigma [1] [2]. To support this analysis, a simulation will be carried out, looking for a considerable reduction of the bottleneck and, consequently, the increase of productivity, improving the time of delivery of orders. By implementing the DMAIC Six Sigma methodology, the order delivery time will be improved to 96%, thus improving the quality of the production process and generating economic benefits. / Trabajo de investigación
2

Aplicación de la herramienta Scrum para la reducción de RFIS y No conformidades en la construcción de viviendas multifamiliares / Implementation of SCRUM to the reduction of RFI and nonconformities in the construction of residential buildings

Chumpitaz Guzmán, Brayan Ángelo, Rubio Noriega, Junior Obidio Segundo 13 May 2020 (has links)
El éxito en el desempeño de los proyectos de construcción depende de múltiples factores internos y externos y, precisamente, uno de estos principales factores se consigue a través de una adecuada gestión en la planificación de las actividades, la cual tiene como principales objetivos reducir pérdidas, sobre costos y plazos de cronograma. Debido a esto, la industria se encuentra en una constante búsqueda de modelos de gestión que permitan alcanzar dichos objetivos. Es precisamente, el modelo Agile Scrum, concebido en la ingeniería de software, el que surge como una alternativa a la gestión de proyectos tradicionales brindando una mejora exponencial en la comunicación del equipo de proyecto y potenciando la planificación de las actividades con la implementación de un marco iterativo de trabajo que permita la flexibilidad en los cambios de requerimientos, reducción de incertidumbre y confiabilidad en lo planificado. Por ello, surge la necesidad de aplicar y adaptar este modelo dentro del sector construcción con el objetivo de reducir las solicitudes de información (RFI) y No Conformidades en calidad y así contribuir a la mejora en el desempeño del proyecto. / The success of performing in construction projects depends on plenty of internal and external factors. One of them, undoubtedly, is an accurate planning of daily activities, which main objective is the reduction of over costs, time schedule and reworks. As a result, the Construction industry is now on constant search for new project management models which allow the achievement of these objectives. It is precisely, the agile SCRUM model, developed in the software industry, in which arise as an alternative of the traditional project management models. which providing an exponential improvement in communication, increasing reliability of planned activities with the incorporation of iterative framework which provides flexibility in requirement changes and reduction of uncertainty. Therefore, it is necessary the implementation and adapting of this model inside the construction industry with the objective of a reduction of requests for information (RFI) and nonconformities in quality in order to improve the performance of the construction projects. / Trabajo de investigación
3

Análisis de los principales factores que permitieron desarrollar una eficiente transformación digital en las principales empresas del sector banca múltiple peruano / Analysis of main factors that allow the development of an efficient digital transformation in the main Peruvian banking companies

Cabrera Vergara, Cristian Jesús, Castillo Bravo, Solange Beatriz 11 November 2019 (has links)
Las organizaciones reconocen la necesidad de cambiar el modelo de negocio tradicional por uno cada vez más digital y ágil. Por ello, han empezado a transformarse digitalmente, buscando ser más competitivos en un entorno cambiante. Sin embargo, este proceso es relativamente nuevo, y en el Perú son pocos los que han logrado implementarlos positivamente. Por ello, cada vez hay más empresas que reconocen la necesidad de transformarse, pero que desconocen cómo hacerlo. Esta investigación comprende la recopilación bibliográfica, realización de entrevistas, procesamiento de encuestas a los 4 principales bancos, y el análisis estadístico de los resultados para desarrollar estimaciones que permitirían conocer los principales factores que pudieron priorizarse para tener un desarrollo eficiente en este proceso. Esta investigación reúne información y analiza las percepciones de sus trabajadores para realizar estimaciones exploratorias acerca de los factores que permiten obtener un desarrollo eficiente de transformación digital. Se realizaron entrevistas a expertos de diversos sectores y a 4 trabajadores del sector bancario. Finalmente, se realizaron 70 encuestas, de los cuales 59 fueron válidas para su procesamiento. Sin embargo, debido a las limitaciones de tiempo y confidencialidad, no se pudo obtener un tamaño mayor, impidiendo hacer un análisis concluyente a nivel estadístico que pudiera extrapolarse el resto de las empresas. Finalmente, se identificaron 2 enfoques que permiten obtener un desarrollo eficiente en el proceso de transformación: centrarnos en el cliente y colaborador, tomando en cuenta las limitaciones externas e internas durante proceso y reconociendo el objetivo o razón que los lleva al cambio. / Organizations recognize the need to change the traditional business model for a more digital and agile one. Therefore, companies have begun to transform digitally, seeking to be more competitive in a changing environment. However, this process is relatively new, and in Peru few have managed to implement it positively. This research includes bibliographic compilation, interviews, processing surveys to workers of the 4 main banks in Peru, and the analysis to develop statistical estimations that could make us recognize the main factors that should be prioritized to have an efficient development in their digital transformation process. By this way, this research collect data from the main banks in Peru and analyze opinions and perceptions of their employees in order to make exploratory and descriptive estimates about the process. Research considered interviews of experts from different sectors, including members of the analyzed banks and finally 70 surveys were carried out, of which 59 were validated for processing. However, due to the time and confidentiality limitations, it was not possible to reach a larger sample size, so it did not allow us to make a conclusive analysis at a statistical level that can be used as a model for the other companies. Finally, two approaches were identified in the investigation in order to obtain an efficient development of the transformation process: putting the client and the collaborator as center, considering limitations in the process and recognizing the objective that leads the change. / Tesis
4

Gestión de proyectos de tecnologías de la información / Information technology project management

Morales Agüero, Lisset Karen, Ramírez Perales, Placida Nataly 17 July 2020 (has links)
Las tecnologías de la información (TI) son consideradas por diversos autores como facilitadores tecnológicos que permiten a las organizaciones responder de manera rápida y oportuna a los constantes cambios de su entorno interno y externo. Los proyectos de tecnologías de la información, desde su implementación en las organizaciones, presentaron dificultades para ser exitosos, debido a que, por su naturaleza cambiante, no podían basarse en procesos rígidos tal como lo establece el denominado método cascada o gestión tradicional de proyectos. En ese sentido, este tipo de proyectos empezó a hacer uso de metodologías ágiles que le permiten desenvolverse mejor y responder más rápido a los cambios del entorno externo. Todo ello generó que en las organizaciones se implementase la agilidad estratégica y la estrategia comercial digital. En este orden de cosas, el presente trabajo tiene como finalidad presentar investigaciones relevantes sobre la gestión de proyectos de tecnologías de la información y el cambio que se genera con su implementación en las organizaciones. / Information technologies (IT) are considered by various authors as technological facilitators that allow organizations to respond quickly and in a timely manner to the constant changes in their internal and external environment. Information technology projects since their implementation in organizations that have difficulties to be successful, due to the fact that due to their changing nature, they do not have to be based on rigid processes as established by the cascade method or traditional project management. In this sense, this type of project began to make use of agile methodologies, which allow it to perform better and respond faster to changes in the external environment. All this, generated in organizations, will implement strategic agility and digital business strategy. The purpose of this work is to present relevant research on the management of information technology projects and the change that is generated with their implementation in organizations. / Trabajo de Suficiencia Profesional
5

Propuesta de diseño e implementación de una VMO para los Proyectos de Tecnología en una Cadena de Restaurantes / Design and Implementation Proposal of a Value Management Office for Technology Projects in a Restaurant Franchise

Diban Escaffi, Jaime Alfredo, Pineda La Serna, Oscar Alejandro, Rodriguez Urbina, Oscar Guillermo 14 April 2021 (has links)
La industria del sector de restaurantes ha venido siendo una de las de mayor crecimiento en el Perú, incrementando también de forma continua la oferta y la competencia. Las estrategias diseñadas en el sector han estado basadas principalmente en la calidad del servicio, ofertas y productos; pero los procesos detrás de estas estrategias han resultado muchas veces operativamente ineficientes, afectando directamente los márgenes del negocio; algo que ha sido observado por cada una de las empresas activas. Durante los últimos años, y sobre todo en el 2020 debido a la coyuntura presentada por el COVID-19, esta industria también se ha visto afectada por la ralentización de la economía y paralización de los mercados, evidenciando las falencias operativas y resaltando los sobrecostos, acentuando aún más la necesidad de crear economías de escala como parte de sus estrategias. Con el objetivo de optimizar costos, los restaurantes han encontrado un aliado en la transformación digital de sus procesos, incrementando de forma natural el número de proyectos de tecnología requeridos, exigiendo mejores resultados y una gestión mas eficiente, lo cual ha generado diversas oportunidades de mejora en la ejecución, sobrecostos de la gestión y procesos que conviven de forma no estandarizada. El presente trabajo de investigación propone el diseño e implementación de una oficina de gestión de valor, alineada con los valores de la organización, basada en el uso de prácticas agiles y lean para la gestión de proyectos de tecnología, con procesos definidos y la generación de valor como prioridad. / The restaurant sector industry has been one of the fastest growing in Peru, leading to the continuous increase of the offer and competition. This sector's designed strategies have been based mainly on service quality, offers, and products, but the processes behind these strategies have often been operationally inefficient, directly affecting business margins, something that the active companies have perceived. Lately, especially in 2020, due to the COVID-19 situation, this industry has also been affected by the slowdown in the economy and the paralysis of the markets; showing the operational shortcomings and highlighting cost overruns, furthermore, accentuating the need to create economies of scale as part of their strategies. To optimize costs, restaurants have found an ally in the digital transformation of their processes, increasing the number of required technology projects naturally, demanding better results and more efficient management, which has generated various improvement opportunities in the execution, cost management, and processes that coexist in a non-standardized way. This research work proposes the design and implementation of a value management office aligned with the organization's values, based on the use of agile and lean practices for the management of technology projects, with defined processes and the generation of value as a priority. / Trabajo de investigación
6

Propuesta de implementación de una PMO apoyándose en un framework Lean-Agile para una empresa de servicios compartidos / Design proposal for the implementation of a PMO based on a Lean-Agile framework for a shared services company

Calderón Pereda, Giancarlo Daniel, Chavez Rodriguez, Daymo Rodrigo, Leon Medina, Claudio Martin, Vasquez Rodríguez, Hilda Magally 15 July 2021 (has links)
En el siguiente trabajo de investigación tiene como objetivo elaborar una propuesta de implementación de una PMO apoyándose en un framework Lean - Agile para una empresa de servicios compartidos, el cual brinde el soporte en la Gestión de Proyectos en el área de TI de la empresa, debido a la cantidad de proyectos que se reciben en el área de TI; por lo cual esta propuesta permitirá mejorar el desempeño en la gestión de los proyectos en la empresa. Basado en los principios Ágiles, acompañado de las buenas prácticas Lean, el framework propuesto estará compuesto por los servicios que brindará la PMO, de acuerdo con el análisis de interesados que se realizó como parte del diagnóstico para la identificación de los mismos. Cada servicio contará con la organización necesaria a partir de entregables y lineamientos ágiles que permita a la empresa obtener una mejor planificación, desarrollo y ejecución para la realización de proyectos y lograr la concreción de los objetivos trazados y metas propuestas para cada uno de ellos. Todo esto de acuerdo a un plan de implementación de esta propuesta, así como también se realiza una evaluación financiera donde se indicará los beneficios financieros y no financieros, el cual mostrará la viabilidad de la propuesta. / The following research aims as main objective to develop a proposal for the implementation of a PMO based on a Lean - Agile framework for a shared services company, which will provide support in Project Management of the IT area of ​​the company, which is due to the several projects received by the IT area. This proposal will allow to improve performance in project management of the company. Based on Agile principles, followed by good Lean practices, the proposed framework will be composed of services that the PMO will provide, in accordance with the stakeholder analysis that was carried out as part of an identifying diagnosis. Each service will have the necessary organization, based on deliverables and agile guidelines that allow the company to obtain better planning, development and execution to carry out projects and achieve the objectives stated and goals proposed for each of them. All this according to an implementation plan for this proposal, as well as a financial evaluation is carried out indicating the financial and non-financial benefits, which will show the viability of the proposal. / Trabajo de investigación
7

Aplicación del marco de trabajo SCRUM para la reducción en el plazo, No Conformidades y solicitudes de información (RFI) en un conjunto residencial - Etapa de estructuras - Cercado de Lima / Application of the SCRUM framework for the reduction in time, non-Conformities and requests for information (RFI) in a residential complex - Structures stage - Cercado de Lima

Chumpitaz Guzmán, Brayan Ángelo, Rubio Noriega, Junior Obidio Segundo 02 June 2021 (has links)
Esta investigación tiene como fin aplicar un modelo Agile de gestión de proyectos con la utilización del marco de trabajo Scrum en un proyecto de conjunto residencial en el distrito del Cercado de Lima, Lima, Perú. Para esto, el estudio empleó un cuestionario completado por profesionales del sector construcción, con el fin de determinar las actividades que generan mayores sobrecostos, retrabajos y plazos dentro de las etapas de proyectos. A su vez, se realizó la propuesta de aplicación SCRUM dentro del sector construcción para finalmente desarrollar la implementación de este modelo en la capital peruana y determinar los resultados obtenidos frente al modelo tradicional Lean Construction y, a partir de este resultado, proponer una guía de aplicación del marco de trabajo SCRUM en futuros proyectos de construcción. / This research aims to apply an Agile project management model with the use of the Scrum framework in a residential complex project in the Cercado de Lima district, Lima, Peru. For this, the study used a questionnaire completed by professionals in the construction sector, in order to determine the activities that generate the highest cost overruns, rework and deadlines within the project stages. In turn, the SCRUM application proposal was made within the construction sector to finally develop the implementation of this model in the Peruvian capital and determine the results obtained compared to the traditional Lean Construction model and from this result propose an application guide on the SCRUM framework for future construction projects. / Tesis
8

Propuesta de mejora en la producción de casquillos para aumentar la eficiencia y reducir los defectos en una empresa de fabricación de municiones mediante el enfoque Lean Six Sigma y Método de Trabajo / Proposal to improve the production of cartridge case to increase efficiency and reduce defects in an ammunitions manufacturing company through the Lean Six Sigma approach and working method

Mego Aranguri, Cristhian Wilfredo, Roque Soriano, Maria Elena 17 February 2021 (has links)
El presente trabajo empieza con el marco teórico para establecer la definición de términos y conceptos específicos de investigación como Metodología Lean Six Sigma, Estudio de Métodos, Calidad, Eficiencia y Municiones. Luego, en el estado del arte, se reúne y analiza la información de diversos artículos de investigación para obtener un sustento científico y conocer el actual uso de las diferentes herramientas empleadas para dar soporte a la investigación. Después de establecer la importancia del sector en estudio, se realiza el diagnóstico de la empresa para identificar oportunidades de mejora. Empleando herramientas de ingeniería en el proceso de producción se identificó baja eficiencia, alta cantidad de productos no conformes, falta de estandarización y oportunidades de mejora. Se encontró alto porcentaje de defectos en el proceso de Formación de Copa Vaina; debido al desconocimiento de tiempo de vida útil de los utillajes, colocación errada de utillajes, desconocimiento de frecuencia de calibración, desconocimiento de frecuencia y método de set up. El proceso de lavado, el cual es indispensable a lo largo de la línea de producción, también presenta alto porcentaje de defectos debido a la mezcla errónea de los químicos empleados para lavar los casquillos. Se propone un modelo combinado de Lean Six Sigma y Métodos de trabajo para mejorar los problemas hallados en la línea de producción de casquillos, aumentando la eficiencia y reduciendo los defectos. Por último, se realizó una prueba piloto como método de validación logrando resultados óptimos al emplear el modelo combinado propuesto. / This applied research project begins with the theoretical framework to stablish the definition of specific research terms and concepts, such as Lean Six Sigma Methodology, Study of Methods, Quality, Efficiency and Ammunition. Then, in the state of the art, the information collected from various research articles is analyzed to obtain a scientific support and know the different tools used in them to support this investigation. After establishing the importance of the sector under study, the diagnosis of the company is made to identify opportunities for improvement. using different engineering tools in the production process line identified low efficiency, high quantity of non-conforming products, lack of standardization and opportunities for improvement. High percentage of defects were found in the Vaina Cup Formation process this due to lack of knowledge of useful lifetime tools, wrong placement of tolls, lack of knowledge of calibration frequency, frequency and set up method. The washing process, which is essential along the production line, also has a high percentage of defects due to the wrong mixing of the chemicals used to wash the case of the ammunition. a combined model of Lean Six Sigma and Work Methods is proposed to improve the problems found on the cartridge case production line, increasing efficiency and reducing defects. Finally, a pilot test was performed as a validation method, achieving optimal results when using the proposed combined model. / Trabajo de Suficiencia Profesional
9

Propuesta de mejora del proceso de reparación de vehículos ligeros aplicando herramientas del Lean Service en una empresa de alquiler de vehículos / Proposal for improvement to optimize the delivery times of light vehicle repairs by applying Lean Service tools in a car rental company

Licetti Villaorduña, Renato Alonso 20 March 2020 (has links)
La presente investigación realizada tiene como objetivo principal optimizar los tiempos de entrega de las reparaciones de vehículos ligeros en una empresa de alquiler de vehículos. Para ello, se aplicó la metodología del Lean Service, cuyas herramientas y métodos permitirán desplegar una propuesta de solución sólida, científica y aplicada a la problemática actual antes mencionada. En primer lugar, se realizó la revisión bibliográfica, citando fuentes y artículos científicos que sustenten y avalen la investigación. Luego, se realizó el análisis de la problemática actual y determinación de causas, para ello se aplicaron métodos y herramientas de la ingeniería industrial para la determinación de las causas raíz del problema, las cuales estaban ligadas a los métodos de la empresa. Como consecuencia de este análisis, se formula la hipótesis que la aplicación del Lean Service, a través de las herramientas 5S, Estandarización, TPM y Redistribución de planta, permitirá mitigar el impacto operativo y económico del problema principal, el cual es la demora en las entregas de las reparaciones de vehículos en el taller mecánico de la empresa. Dicha hipótesis es materia de estudio del siguiente capítulo, donde, en primer lugar, se sustenta que el Lean Service es la propuesta de mejora que mejor se ajusta a la descripción y la naturaleza de la presente investigación; para luego desplegar propiamente la metodología en sí. Dicho despliegue se realizó a través de la aplicación de las herramientas del Lean Service antes mencionadas, estructuradas bajo un diseño de propuesta basado en el ciclo de mejora continua PHVA (Planear, Hacer, Verificar y Actuar). Finalmente, para la comprobación y verificación del problema, se realizó una simulación de la propuesta a través de un software, donde se comprobó que efectivamente, luego de la aplicación de la propuesta, se lograría reducir los tiempos de entrega. Además, se realizó una evaluación económica de la propuesta para comprobar la viabilidad del proyecto, respaldando así la presente investigación. / The main objective of this research carried out is to optimize the delivery times of light vehicle repairs in a car rental company. For this, the Lean Service methodology was applied, whose tools and methods will allow to deploy a proposal for a solid, scientific solution applied to the current problems mentioned above. First, the bibliographic review was performed, citing scientific sources and articles that support and endorse the research. Then, the analysis of the current problems and determination of causes was carried out, for this, industrial engineering methods and tools were applied to determine the root causes of the problem, which were linked to the company's methods. As a consequence of this analysis, the hypothesis is formulated that the application of the Lean Service, through the 5S, Standardization, TPM and Layout Redistribution tools, will mitigate the operational and economic impact of the main problem, which is the delay in deliveries of vehicle repairs at the company's mechanical workshop. Said hypothesis is the subject of study in the next chapter, where, in the first place, it is maintained that the Lean Service is the proposal for improvement that best fits the description and nature of the present investigation; and then properly deploy the methodology itself. This deployment was carried out through the application of the Lean Service tools mentioned above, structured under a proposal design based on the PDCA cycle (Plan, Do, Check, Act). Finally, for the verification and verification of the problem, a simulation of the proposal was carried out through software, where it was verified that, effectively, after the application of the proposal, it would be possible to reduce delivery times. In addition, an economic evaluation of the proposal was carried out to verify the viability of the project, thus supporting the present investigation. / Trabajo de Suficiencia Profesional

Page generated in 0.0732 seconds