• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 14
  • 1
  • Tagged with
  • 16
  • 16
  • 16
  • 16
  • 12
  • 12
  • 7
  • 7
  • 7
  • 5
  • 5
  • 4
  • 4
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

An evaluation of the expanded public works programme in Sekhukhune District of Limpopo Province

Ramaepadi, M. D. January 2007 (has links)
Thesis (MDev.) -- University of Limpopo, 2007 / Refer to document
12

Implementation of the Expanded Public Works Programme (EPWP) in South Africa, 2004-2014

Mkhatshwa-Ngwenya, Evelyn Nomvula Mapule 03 1900 (has links)
Most developing countries are faced with high levels of unemployment, poverty, underemployment and inadequate infrastructure. The causes of poverty and unemployment in South Africa are manifold and complex. South Africa is one of the developmental states which gained its independence in 1994. There is a high rate of unemployment, poverty, unskilled workforce, inequality and low quality service delivery in South Africa (SA). Communities across provinces are unhappy about the above mentioned issues and have, over the years, expressed their dissatisfaction through picketing, demonstrations and strikes. SA, as a developmental state, has to balance economic growth and social development. Post 1994, the African National Congress (ANC)-led government promised to address the triple challenges facing the SA economy, namely poverty, unemployment and inequality. The study pursues to identify and describe factors that necessitated the EPWP in SA. It further investigates the performance of provinces during the implementation of the EPWP inorder to understand the current implementation approach. Both qualitative and quantitative methods were used to obtain data. Published figures from the Department of Public Works (DPW) reports and on the websites of relevant organisations were analysed. The objective was to identify small-medium-micro enterprises (SMMEs) that were created, trainings supported, and work opportunities (WOs) as well as full time equivalents (FTEs) that were created. A questionnaire was disseminated to three officials per four sectors, totaling (twelve) across four provinces namely Mpumalanga, Limpopo, Gauteng and North West. The officials were from the EPWP implementing bodies and coordinating departments. The questionnaire sought information on how EPWP projects were implemented and reported in the two phases. The implementing bodies were expected to specify their roles, targets and work opportunities that they hoped to create. The correct sampling method and size were chosen based on the approved research proposal and its intention. Challenges experienced by the coordinating bodies, implementing bodies and data managers during the implementation of the EPWP were tabulated. Recommendations and remedial actions to identified challenges were also highlighted. This study proposes interventions with regard to the coordination of the EPWP, training, improved monitoring of projects, political buy-in and allocation of budget that will improve the daily wage rate. / Public Administration / D. Admin. (Public Administration)
13

The impact of the expanded public works programme on poverty in Amathole district municipality

Nkonki, Pamela January 2013 (has links)
The study aimed at analysis the South African government’s attempt to reduce poverty through alleviation and reduction of unemployment. The study analyses this using Ngqushwa Local Municipality in the Eastern Cape. The introduction of labour intensive projects of government in infrastructural development, under auspices of the Department of Public Works, has brought a relief in addressing unemployment and poverty in the country. While the provision of these short-term based jobs is life-saving, the question is whether or not these projects (EPWP) will provide a sustainable solution to unemployment and poverty with the skills and information they provide to the employees. To achieve this aim the study used both qualitative and quantitative research methodology. First, a literature review on the Expanded Public Works Programme was done. Secondly, policy review on poverty and conservation was done. A small sample size of sixteen people was selected using purposive sampling, targeting ten beneficiaries of EPWP, three Municipal managers and three Departmental managers that were involved in EPWP. Firstly, I wanted to know how many people participated in the EPWP initiatives in the Amathole District Municipality between 2008 and 2012. Secondly, what training was provided to people that were temporarily employed on the EPWP projects and what recruitment tools were used to recruit EPWP employees. Thirdly, to find out how many were able to find permanent employment after the EPWP projects in Amathole District Municipality communities were completed. Fourthly, has the EPWP benefited the poorest of the targeted areas and redressing racial imbalances? It is clear that EPWP is appreciated by some of the beneficiaries who do not have better school qualifications as they make significant, short-term contribution to their livelihoods and, than those who have better qualifications especially the youth, who claimed that this programme is partly wasting their time as they were looking for permanent jobs, and in South Africa age restriction is one of the problems that the people were facing when looking for a job. The study proposes that the government should make a physical relief on poverty and employment reduction by making this programme a permanent job.
14

An evaluation of the theory behind the South African Expanded Public Works Programme

Heradien, Elde Joy 03 1900 (has links)
Thesis (MA)--Stellenbosch University, 2013. / Bibliography / ENGLISH ABSTRACT: This thesis evaluated the theory behind the South African Expanded Public Works Programme (EPWP) during its first phase from 2004-2009. The research examined how sound the EPWP theory was which explains the logic that links programme objectives and programme activities and resources. The data for this study comprised of government departmental documents on the EPWP, the context of the EPWP and the policies that informed it. Evaluation of the EPWP theory revealed that the programme was based on a sound theory if focusing solely on projected objectives, activities and resources. However, the evaluation also revealed deficiencies in the programme theory with regard to the EPWP reaching its larger policy goals. The theory construction and evaluation framework by Rossi, Freeman and Lipsey (2004) is an evaluation tool that was used to evaluate the EPWP. More theory based approach evaluations would add value to the lack in theory based programme evaluations in South Africa. In brief, the problem of unemployment is structural in South Africa and requires long term solutions. The policies and policy programmes should thus be designed with permanent employment measures in mind. However, employment through one of the largest policy programmes in South Africa, the EPWP, was short term. It is therefore recommended that this method of programme evaluation be utilised in more studies prior to implementation of a programme, because if the logic behind a programme is sound, its chances to succeed could be improved. / AFRIKAANSE OPSOMMING: Hierdie tesis evalueer die teorie agter die Suid-Afrikaanse Uitgebreide Openbare Werke Program (UPWP) tydens die eerste fase van 2004-2009. Die navorsing ondersoek hoe grondig die teorie die logika tussen program doelwitte en program-aktiwiteite en hulpbronne verduidelik. Die data vir hierdie studie bestaan uit departementele dokumente oor die konteks van die UPWP en die beleid wat die program ingelig het. Evaluering van die UPWP-teorie het aan die lig gebring dat die program gebaseer is op 'n grondige teorie, met die fokus uitsluitlik op geprojekteerde doelwitte, aktiwiteite en hulpbronne. Die evaluering van die UPWP-teorie het ook die gebrek met betrekking tot die bereik van groter beleidsdoelwitte aan die lig gebring. Die teorie konstruksie-en evalueringsraamwerk deur Rossi, Freeman en Lipsey (2004) is 'n evaluering instrument wat gebruik was om die UPWP te evalueer. Meer teoreties-gebaseerde evaluerings sal waarde toevoeg tot die gebrek van teorie-gebaseerde program evaluering in Suid Afrika. Ter opsomming, werkloosheid is n strukturele probleem in Suid Afrika en vereis langtermyn oplossings. Die beleide en die beleid programme moet dus ontwerp word met permanente indiensneming geleenthede in gedagte. Indiensneming deur een van die grootste programme in Suid-Afrika, die UPWP bied egter kort termyn indiensneming. Dit word dus aanbeveel dat die teorie-gebaseerde benadering van programevaluering in meer studies gebruik word voor die implementering van 'n program, want as die logika agter 'n program grondig is, is die kanse van sukses verhoog.
15

Performance of the expanded public works programme in a selected department of the Western Cape Provincial Government, South Africa

Sindelo, Lindi Ebegail Vivien January 2019 (has links)
Thesis (MTech (Public Management))--Cape Peninsula University of Technology, 2019. / A socio-economic problem presently facing South Africa is the rate of youth unemployment, which is among the highest in the world. The South African Government has been involved in a number of initiatives, together with the advancement of a labour-intensive Expanded Public Works Programme (EPWP) in order to reduce unemployment and poverty. The EPWP was initiated in 2004 with the aim to place the jobless into productive work in the public sector social services where these EPWP beneficiaries are provided with relevant training and transfer of appropriate skills. However, the EPWP only creates temporary work opportunities that have limited influence on the lives of the beneficiaries. The main objective of the study was to examine the performance of the Youth Work Project (YWP) as an EPWP in a selected department of the Western Cape Provincial Government in order to determine its sustainability of job creation. The secondary aims of the study were to explain the process of the YWP as implemented through the EPWP by a selected department of the Western Cape Provincial Government. A third objective was to examine whether the Public Works employment opportunities enhance subsequent employability of participants once they exit this programme. Fourthly, recommendations was forwarded as to how best the EPWP can be used as a tool for helping unemployed youth with a permanent work opportunity. The sample frame computed of thirteen (13) individuals, therefore purposive sampling was considered the most suitable technique to use in this study. The semistructured interviews were conducted with five (5) management officials responsible for the EPWP and unstructured questionnaires were administered to eight (8) available EPWP beneficiaries placed at a selected department of the Western Cape Provincial Government.
16

The investigation of the management of expanded public works programme (EPWP) towards job creation in Polokwane Local Municipality, Limpopo Province

Mphekgoana, Makhule Joseph January 2016 (has links)
Thesis (MDev.) -- University of Limpopo, 2016 / The introduction of privatisation after 1994 has left many people in Polokwane without employment. The majority of the jobs were given to few people who always provide services through tenders. Most of the departments were no longer hiring people because of the tendering process. The process has made many departments and municipalities to absorb labour force in the public sector. Due to lack of employment in different regions in Limpopo, the provincial Department of Public Works has started an Expanded Public Works Programme (EPWP) to alleviate poverty in the province. However, the management of these projects became a problem to most of the government officials in the municipalities, provincial departments and municipalities are fraught with challenges such as lack of managerial traits, technical and skills related to project management. Polokwane local municipality is not excluded from the above problems, hence the study on the investigation of the management of EPWP towards job creation in Polokwane local municipality. In order to understand the total context of the managerial flaws faced by Polokwane local municipality in Limpopo an in-depth empirical research and interviews were conducted to collect data from government official and employees in the study area. The finding of the study suggests that lack of managerial traits, technical skills, lack of participation, non-compliance with work ethics, monitoring and evaluation were regarded as the greatest challenges in the management of EPWP in Polokwane local municipality. Due to the above challenges, most of the projects are not completed on time because of the lack of qualified project managers. Lack of qualified personnel also contributed to poor quality of service delivery in the area of the study. The study revealed that the projects can alleviate poverty if can be managed and implemented by qualified managers and employees with relevant skills. Therefore, the study calls for the Department of Public Works to appoint qualified and experienced civil engineers to monitor and evaluate the implementation of EPWP projects in Polokwane local municipality.

Page generated in 0.0897 seconds