• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 95
  • 1
  • Tagged with
  • 96
  • 96
  • 73
  • 51
  • 51
  • 51
  • 51
  • 51
  • 30
  • 26
  • 21
  • 21
  • 18
  • 16
  • 16
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
91

El seguimiento de proyectos como generador de evidencia para las reformas en la gestión pública: una experiencia desde el Ministerio de Transportes y Comunicaciones

Lazarte Castillo, Paola Pierina 28 September 2021 (has links)
Las evidentes deficiencias en la provisión oportuna de bienes y servicios públicos por parte del Estado, así como las brechas tangibles de infraestructura pública, no hacen más que reforzar la percepción de que la gestión pública se encuentra en crisis. El Estado no ha sido capaz de mejorar la regulación y procedimientos subyacentes en la producción de bienes públicos indispensables para la mejora de la calidad de vida de los ciudadanos o de la competitividad. Por ello, el presente Trabajo de Suficiencia Profesional (en adelante, TSP), tiene por objeto presentar a partir de la experiencia profesional ganada como asesora de alta dirección y directora en el Ministerio de Transportes, una aproximación de las principales razones por las que los grandes proyectos de infraestructura en el país presentan constantes dilaciones y problemas en su ejecución. Este diagnóstico se obtuvo a partir del seguimiento y monitoreo de proyectos, siendo también objetivo de este documento demostrar que a partir seguimiento y monitoreo de proyectos es posible generar evidencia para la formulación de reformas sustanciales en la gestión de la infraestructura pública en el país. En particular, este TSP se centrará en la experiencia lograda en dicho ministerio durante los años comprendidos desde el 2018 al 2020, encontrando como principales hallazgos la necesidad de contar con equipos de alto nivel especializados para el destrabe de proyectos y la necesidad de estandarizar procedimientos para mejorar la gestión de infraestructura en el sector transportes y en los demás sectores.
92

Seguimiento y cumplimiento de compromisos y planes de inversión para el aporte de la paz social en el corredor vial sur

Quiñones Huayna, Carlos Alfredo 18 January 2023 (has links)
El presente es un Trabajo de Suficiencia Profesional (TSP) elaborado a fin de obtener el Título de Licenciado en Economía, en base a los estándares establecidos por la Facultad de Ciencias Sociales de la PUCP. Hace un recuento general sobre mi experiencia como especialista de seguimiento y gestión de compromisos entre los años 2017 y 2022, desenvuelto en la Secretaría de Gestión Social y Diálogo de la Presidencia del Consejo de Ministros, entidad responsable a nivel nacional de la gestión y solución de conflictos sociales. El TSP presenta los resultados de la sistematización de los compromisos asumidos por el Estado, en sus diferentes niveles de gobierno, a fin de apaciguar los controversias o conflictos sociales en las zonas aledañas al Corredor Vial Sur, también conocido como Corredor Minero. Tarea de suma importancia a fin de contar con cifras certeras sobre la magnitud del costo total adquirido por el Estado a fin de mantener la paz social en lugares propensos a la conflictividad y estratégicos por ser parte del área de influencia directo o indirectas de grandes yacimientos mineros.
93

Fortalecimiento de capacidades en gestión municipal y fondo soberano de inversión para enfrentar la reducida eficacia y eficiencia de la inversión pública financiada con los fondos provenientes del canon gasífero en la Municipalidad Provincial de la Convención durante los años 2007-2019

Baca Gómez Sánchez, Rodolfo 05 August 2021 (has links)
En el Perú, la explotación de recursos naturales no renovables (minería, gas y petróleo, principalmente) genera al Estado recursos tributarios, que se transfieren a los gobiernos subnacionales en calidad de Canon; para invertirse en el financiamiento o cofinanciamiento de proyectos u obras de infraestructura. Sin embargo, dicha inversión parece no haber tenido un impacto deseado. El presente proyecto busca plantear alternativas de solución al problema: Reducida eficacia y eficiencia de la Inversión Pública financiada con los fondos provenientes del canon gasífero en la Municipalidad Provincial de La Convención durante los años 2007- 2019. Al analizar las causas del problema definido, se han encontrado que éstas se deben principalmente a tres motivos: i) corrupción; ii) clientelismo; y iii) débil capacidad institucional. En ese sentido, en el presente documento se presenta tres mecanismos como alternativas de solución al problema encontrado: Un Programa de Fortalecimiento de Capacidades, la implementación de un Fondo de Soberano de Inversión (FSI) con recursos del canon y la implementación de un modelo de Integridad; que busca mitigar el riesgo de corrupción. Si bien el estudio de caso presentado, es sobre una Provincia del Departamento del Cusco; pero debido a que la normativa de uso y distribución del Canon tiene alcance a todos los gobiernos subnacionales; las conclusiones del Proyecto tienen alcance nacional. Respecto al análisis de factibilidad, se ha determinado que existen capacidades organizativas e infraestructura virtual y de E-learning en el Estado, para implementar las diferentes soluciones propuestas en lo relacionado a la generación de capacidades; así como respecto del modelo de Integridad. Sin embargo, del análisis de deseabilidad se han determinado algunos obstáculos iniciales, como es un aparente recorte de las transferencias de recursos del Canon; que podrían generar protestas de algunas poblaciones afectadas, por lo que el Fondo Soberano se podrá implementar, cuando el escenario económico así lo permita. / In Peru, the exploitation of non-renewable natural resources (mining, gas and oil, mainly) generates tax resources to the State, which are transferred to subnational governments as Canon to invest in the finance or co-finance of infrastructure projects. However, this investment does not appear to have had a desired impact. This project seeks to propose alternative solutions to the reduced effectivity and efficiency of Public Investment financed with funds from the gas canon in the Provincial Municipality of La Convencion during the years 2007-2019 When analyzing the causes of the defined problem, it has been found that these are mainly due to three reasons: i) corruption; ii) clientelism; and ii) weak institutional capacity. In this sense, this document presents three mechanisms as alternative solutions to the problem encountered: A Program to Build Capacities, a Sovereign Wealth Fund (SWF) with canon resources and the implementation of an Integrity model; that seeks to mitigate the risk of corruption. Although the case study presented is about a Province of the Department of Cusco; but because the regulations for the use and distribution of the Canon are applicable to all subnational governments; the conclusions of the Project are national in scope. Regarding the feasibility analysis, it has been determined that there are organizational capacities and virtual infrastructure and E-learning in the Government, to implement the different solutions proposed in relation to the generation of capacities; as well as with respect to the Integrity model. However, the desirability analysis has identified some initial obstacles, such as an apparent cutback in Canon's resource transfers; that could generate protests from some affected populations, so that the Sovereign Wealth Fund may be implemented, when the economic scenario allows it.
94

¿Maldición o bendición de los recursos naturales? : los efectos del Canon minero sobre los resultados educativos en los distritos del Perú

Calle Falcón, Franco Antonio 20 September 2017 (has links)
La literatura peruana sobre la maldición de los recursos (MDR) ha descuidado la dimensión del capital humano. El presente estudio aporta evidencia para la discusión sobre los retornos de la actividad minera sobre la formación de capital humano en las localidades desde una perspectiva institucional. Argumentamos que es altamente probable que los efectos del Canon minero sobre la educación sean heterogéneos y que la dirección del efecto dependa del contexto institucional, en particular, de la democracia participativa y la competencia política. Para evaluar ello utilizamos un modelo de clase latente que define regímenes de formación de capital humano y la probabilidad de pertenecer a cada uno de ellos. Los resultados sostienen, de manera significativa, la hipótesis de que la democracia participativa y la competencia electoral contribuyen a mitigar los síntomas de la MDR.
95

Estudio de caso : problemas en la implementación del proyecto Puente Chilina por el gobierno regional de Arequipa

Arias Quito, Alberto Alonso 04 March 2017 (has links)
La presente investigación es un estudio de caso: El Puente Chilina. Este proyecto de infraestructura era parte de una política pública que pretendía dar solución a la problemática descrita líneas arriba. Pero también era un controvertido proyecto por su costo y la ingeniería requerida. Su anhelada ejecución empezaría a mediados del año 2009, no obstante esta no se llevó a cabo. Por lo que se plantea la siguiente pregunta: ¿Cuáles fueron las causas y consecuencias de los problemas de implementación del Proyecto Puente Chilina por el Gobierno Regional de Arequipa?
96

Propuesta de mejora para enfrentar la baja eficiencia en la ejecución de obras públicas en el Gobierno Regional de Junín

Callupe Casaño, Francisco, Turco Quinto, Joel Jovani 13 April 2022 (has links)
La limitada ejecución de inversiones y paralizaciones de obras públicas se constituyen en una problemática constante en el sector público del Perú. Entre 2009 y 2020, la tasa de ejecución promedio del presupuesto para inversiones a nivel nacional fue de 69 por ciento, alcanzando un 67 por ciento a nivel de gobiernos regionales, y un 71 por ciento en el Gobierno Regional de Junín, particularmente. Al 2020, a nivel nacional se registraron 395 obras paralizadas en todos los niveles de gobierno, los que suman inversiones por S/ 3,3 mil millones, de los cuales el 20 por ciento de obras pertenecían a gobiernos regionales. En dicho año, el Gobierno Regional de Junín reportó 9 obras paralizadas, cuyo monto de inversión ascendía a S/ 210,3 millones. El presente estudio plantea como problema público a las demoras en la ejecución de obras públicas en el Gobierno Regional de Junín en el periodo 2018-2020, encontrando entre sus principales causas a la deficiencia en la formulación de expedientes técnicos, ineficiente gestión en el desarrollo de los proyectos, déficit de personal técnico especializado, y una baja capacidad técnica de empresas consultoras. Luego de realizar una jerarquización de causas, y el análisis de las medidas previas adoptadas por el Estado, se determinó que el “ineficiente seguimiento de proyectos”, como parte de la deficiente gestión de proyectos, se constituye en la causa a abordar en el estudio. La propuesta de innovación para hacer frente al desafío, plantea un sistema de seguimiento de obras públicas colaborativo durante su fase de ejecución en el Gobierno Regional de Junín, a través de dos componentes: Organización y fortalecimiento de capacidades y ii) plataforma de seguimiento de proyectos. Este sistema de seguimiento servirá como instrumento para reducir el tiempo de demoras y paralizaciones, desde la elaboración de los términos de referencia relacionados al expediente técnico hasta la finalización de la ejecución física de la obra, a través de la disposición de una base de información confiable y oportuna que permita una mejor toma de decisiones.

Page generated in 0.1189 seconds