• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 54
  • 44
  • 25
  • 19
  • 3
  • 1
  • 1
  • 1
  • Tagged with
  • 161
  • 161
  • 52
  • 47
  • 43
  • 41
  • 38
  • 24
  • 23
  • 22
  • 21
  • 21
  • 21
  • 20
  • 20
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
91

Método de avaliação de prontidão para implementação da Construção Enxuta

Souza, Bruno Henrique Félix de 02 February 2016 (has links)
Submitted by Maike Costa (maiksebas@gmail.com) on 2016-04-29T13:19:13Z No. of bitstreams: 1 arquivo total.pdf: 1827584 bytes, checksum: 8e2c4699b20e87ffce14b44d0467564c (MD5) / Made available in DSpace on 2016-04-29T13:19:13Z (GMT). No. of bitstreams: 1 arquivo total.pdf: 1827584 bytes, checksum: 8e2c4699b20e87ffce14b44d0467564c (MD5) Previous issue date: 2016-02-02 / Conselho Nacional de Pesquisa e Desenvolvimento Científico e Tecnológico - CNPq / To reduce waste and increase the generation of value for customers, more and more construction companies have sought to apply the Lean Construction. However, there is no unanimous formalization of the implementation process and companies lack information about their real capacity to go through a lean transition. As stressed by the literature, one of the key factors for the success of any lean implementation is to assess the readiness of the organization. This paper assumes that this assessment should consider the technical, human and cultural dimensions and their interrelationships. Seeking ways to evaluate, an important tool based on graph theory and matrix algebra, identified in the literature as Graph Theoretic Approach (GTA), has been applied in different contexts, with desirable properties such as the ability to model interactions between criteria and generating hierarchical models for solving complex decision-making problems. Thus, this study aims to develop a readiness assessment method for implementation of Lean Construction using the GTA as a tool for its operationalization. As steps involved in building the method, it was carried out a literature review, in which it was possible to identify the readiness factors and sub-factors considered in the evaluation, and the parameterization of the model, through the establishment of inter-relations between the selected factors and sub-factors. The developed method was tested through the application in construction companies. As a result from the application, it was obtained the classification of two companies which showed insufficient and partial readiness levels. From the case studies, it was concluded that the proposed method is suitable for its purpose, meeting the criteria of feasibility, usability and utility. The method results allow to provide a diagnostic of the current situation of construction companies, which serves as a driver for change initiatives towards the Lean Construction. / Visando reduzir desperdícios e aumentar a geração de valor para seus clientes finais, cada vez mais empresas construtoras tem buscado aplicar a Construção Enxuta. O que se constata é que não há uma formalização unânime do processo de implementação e que as empresas carecem de informações sobre sua real capacidade para passar por um processo de transição enxuta. Como ressalta a literatura, um dos fatores chave para o sucesso de qualquer implementação enxuta consiste em avaliar a prontidão da organização. Esta pesquisa parte do pressuposto que essa avaliação deve considerar as dimensões de ordem técnica, humana e cultural e suas inter-relações. Na busca de meios para a avaliação, uma importante ferramenta baseada na teoria dos grafos e álgebra matricial, identificada na literatura como Graph Theoretic Approach (GTA), vem sendo aplicada em diversos contextos, apresentando propriedades desejáveis como a capacidade de modelar interações de critérios e de gerar modelos hierárquicos para resolução de problemas de tomada de decisões complexas. Desta forma, este trabalho tem como objetivo desenvolver um método de avaliação de prontidão para implementação da Construção Enxuta utilizando a GTA como ferramenta para sua operacionalização. Como etapas inerentes à construção do método foi realizada uma revisão bibliográfica, na qual foi possível identificar os fatores e os subfatores de prontidão considerados na avaliação, e a parametrização do modelo, por meio do estabelecimento das inter-relações entre os fatores e os subfatores selecionados. O método desenvolvido foi testado por meio da aplicação em empresas construtoras. Como resultado da aplicação, obteve-se a classificação de duas empresas avaliadas as quais apresentaram níveis insuficientes e parciais de prontidão. A partir dos estudos de caso, foi possível concluir que o método proposto é adequado aos fins a que se destina, atendendo aos critérios de viabilidade, usabilidade e utilidade. Os seus resultados permitem fornecer um diagnóstico da situação atual das construtoras, o qual serve de balizador para iniciativas de mudança em direção à Construção Enxuta.
92

Protocolo de auditoria do uso de práticas da construção enxuta

Etges, Bernardo Martim Beck da Silva January 2012 (has links)
A Construção Enxuta (CE) tem sido introduzida, gradativamente, na construção civil através de práticas como controle de perdas, gestão da qualidade e planejamento e controle da produção. Tendo em vista a disseminação da CE na indústria da construção, há a necessidade de medir o nível do seu uso nas empresas, o que permite identificar melhores práticas e oportunidades de melhoria. Desta forma, o presente trabalho tem por objetivo desenvolver um protocolo de auditoria do uso de práticas da CE. Esse método foi desenvolvido ao longo de quatro etapas: (a) uma revisão da literatura para identificar categorias de práticas da CE, tendo como base o material publicado nos anais dos eventos do International Group for Lean Construction (IGLC) entre 1993 e 2010; (b) definição de fontes de evidência para avaliar o uso de cada categoria de prática; (c) definição de pesos referentes à importância de cada prática, com base nas opiniões de sete especialistas em CE; e (d) aplicação do protocolo a um empreendimento da construção civil. O protocolo foi inicialmente aplicado como um estudo piloto em um canteiro de obras o que possibilitou melhorias no documento. A versão revisada do protocolo foi então aplicada no mesmo empreendimento em que ocorreu a aplicação piloto, gerando dados que possibilitaram a avaliação do protocolo segundo sua utilidade. / The Lean Construction (LC) hás been introduced gradually in construction through practices such as loss control, quality management, and production and planning control. Given the spread of the LC in the construction industry, there is a need to measure the level of use of LC in the companies, which allows us to identify best practices and improvement opportunities. Thus, this study aims todevelop a protocol for the use of audit LC practices. This method was developed over four stages: (a) a literature review to identify LC categories of practice, based on the papers published in the Annual IGLC Conferences between 1993 and 2010, (b) sources of evidences definition to evaluate the use of each category of practice, (c) definition of weights referring to the importance of each practice, based on the opinions of seven LC experts; and (d) the protocol aplication in na construction site. The protocol was initially implemented as a pilot study on a construction site which led to improvements in the audit document. The revised protocol was then applied in the same project that occurred in the pilot application, generating data that enabled the evaluation of the protocol according to its usefulness.
93

Protocolo de auditoria do uso de práticas da construção enxuta

Etges, Bernardo Martim Beck da Silva January 2012 (has links)
A Construção Enxuta (CE) tem sido introduzida, gradativamente, na construção civil através de práticas como controle de perdas, gestão da qualidade e planejamento e controle da produção. Tendo em vista a disseminação da CE na indústria da construção, há a necessidade de medir o nível do seu uso nas empresas, o que permite identificar melhores práticas e oportunidades de melhoria. Desta forma, o presente trabalho tem por objetivo desenvolver um protocolo de auditoria do uso de práticas da CE. Esse método foi desenvolvido ao longo de quatro etapas: (a) uma revisão da literatura para identificar categorias de práticas da CE, tendo como base o material publicado nos anais dos eventos do International Group for Lean Construction (IGLC) entre 1993 e 2010; (b) definição de fontes de evidência para avaliar o uso de cada categoria de prática; (c) definição de pesos referentes à importância de cada prática, com base nas opiniões de sete especialistas em CE; e (d) aplicação do protocolo a um empreendimento da construção civil. O protocolo foi inicialmente aplicado como um estudo piloto em um canteiro de obras o que possibilitou melhorias no documento. A versão revisada do protocolo foi então aplicada no mesmo empreendimento em que ocorreu a aplicação piloto, gerando dados que possibilitaram a avaliação do protocolo segundo sua utilidade. / The Lean Construction (LC) hás been introduced gradually in construction through practices such as loss control, quality management, and production and planning control. Given the spread of the LC in the construction industry, there is a need to measure the level of use of LC in the companies, which allows us to identify best practices and improvement opportunities. Thus, this study aims todevelop a protocol for the use of audit LC practices. This method was developed over four stages: (a) a literature review to identify LC categories of practice, based on the papers published in the Annual IGLC Conferences between 1993 and 2010, (b) sources of evidences definition to evaluate the use of each category of practice, (c) definition of weights referring to the importance of each practice, based on the opinions of seven LC experts; and (d) the protocol aplication in na construction site. The protocol was initially implemented as a pilot study on a construction site which led to improvements in the audit document. The revised protocol was then applied in the same project that occurred in the pilot application, generating data that enabled the evaluation of the protocol according to its usefulness.
94

Investigação de ações relativas à Construção Enxuta em construtoras goianas / Research actions regarding the construction in Construction Lean goianas

SOUZA, Leiliane Santana 27 August 2010 (has links)
Made available in DSpace on 2014-07-29T15:18:19Z (GMT). No. of bitstreams: 1 Dissertacao Leiliane S Souza.pdf: 1088368 bytes, checksum: 08126d917221ca7d1d0a2cd99ac26040 (MD5) Previous issue date: 2010-08-27 / In response to the needs of the building market, the model for operational management of the Lean Construction arises taking as a basis to adopt methods that seek to generate added value to the product, without resulting in significant increase in costs, deadlines or loss of quality. The aim of this study is evidence demonstrating the use of the philosophy of lean construction in the city of Goiania. A multiple case study was conducted, in the sites of eight companies of the capital, showing the features service to four principles of lean construction worked in this research. They are: increasing the transparency of the process, reducing variability, increasing flexibility and output value of the product / service from the considerations of customers (external / internal). A check list was applied to the management team in order to identify the presence or absence of the principles described. Data was collected through direct observation and photographic record. The analysis of the reports shows that participating companies seeking to reach the longing of the principles of lean construction in a particular way, even if it is not done intentionally, since no use of such methodology as a form of management. The approach takes the principles studied mainly on reducing losses from the streamlining, flexibility and transparency of processes, customer expectations and something important to consider. The paper's secondary objective disclosure of the issue in this region, for this was prepared a booklet for employees in the building, containing practical examples for use in the work. The relevance as to approach the subject is made for the originality of this study. This is an unprecedented survey in the researched region are expected to conduct the study and dissemination of results motivate these firms to develop practices that are not performed in the workplace. / Em resposta às necessidades do mercado da construção civil, o modelo de gestão operacional da Lean Construction ou Construção Enxuta surge tendo como fundamento a adoção de metodologias que busquem a geração de valor agregado ao produto, sem que isso implique no aumento significativo de custos, prazos ou perdas da qualidade. O objetivo deste trabalho é investigar indícios que comprovem a utilização da filosofia da Construção Enxuta na cidade de Goiânia. Para isso, mediante um estudo de caso múltiplo, procurou-se nos canteiros de oito empresas da capital, características que comprovem o atendimento aos quatro princípios da Construção Enxuta trabalhados nesta pesquisa. São estes: o aumento da transparência do processo, a redução da variabilidade, o aumento da flexibilidade de saída e o do valor do produto/serviço a partir das considerações dos clientes (externos/internos). Um check list foi aplicado ao corpo gerencial com o intuito de identificar a ocorrência ou não dos princípios descritos. As evidências foram coletadas através da observação direta e do registro fotográfico. A análise dos relatórios revela que as empresas participantes buscam alcançar o que anseiam os princípios da Construção Enxuta de forma particular, mesmo que isso não seja feito intencionalmente, já que não utilizam de tal metodologia como forma de gestão. A abordagem dos princípios estudados leva principalmente a redução de perdas a partir da racionalização, da flexibilidade e da transparência dos processos, sendo as expectativas dos clientes algo importante a se considerar. O trabalho tem como objetivo secundário a divulgação do tema na região, para isso foi elaborada uma cartilha destinada aos trabalhadores da construção, contendo exemplos práticos para utilização na obra. A pertinência quanto à abordagem do tema se faz pela originalidade deste estudo. Trata-se de um levantamento inédito na região pesquisada Espera-se que a realização da pesquisa e a divulgação dos resultados motivem as empresas a realizarem as práticas que ainda não são desempenhadas no ambiente de trabalho.
95

Implantação de sistema de produção ritmada em obra de infraestrutura. / Implementation of rythmical production system in a infrastructure project.

Thomás Migliorini Covello 16 February 2018 (has links)
A Construção Civil responde por grande consumo de recursos humanos, materiais e equipamentos, porém o modelo tradicional de gestão das construtoras baseia-se em processos simples de conversão associados a grandes desperdícios, perdas de produtividade e atrasos. A adoção de fluxo contínuo de atividades é uma alternativa para melhorar os processos de um projeto e pode ser alcançada através da utilização de um sistema de produção ritmada, gerando vantagens competitivas às construtoras. Em obras de infraestrutura, devido à complexidade dos projetos e a dificuldade em estabelecer elementos repetitivos, a implantação de tal sistema de produção é pouco comum. Este trabalho tem como objetivos: avaliar criticamente a implantação de um sistema de produção ritmada em uma obra de infraestrutura, relacionar os desafios encontrados no processo, verificar evoluções de produtividades e de aderência ao planejamento ao longo do projeto e demonstrar que a produção ritmada é capaz de atender diversos princípios da filosofia lean construction. A metodologia adotada foi a de revisão bibliográfica de sistemas de produção, filosofia lean e lean construction, com alguns exemplos de aplicações práticas, seguida do estudo de caso da obra de construção de uma estação de Metrô em São Paulo. Na obra em questão foi adotado um método consistindo em levantamento de informações, identificação de elementos repetitivos, definição de seções de construção, determinação de ritmo de trabalho, planejamento de atividades, programação, acompanhamento e controle. Este trabalho conclui que o sistema de produção ritmada, assim como o método apresentado, pode ser implantado em outras obras de infraestrutura. As vantagens do sistema estão no aumento da produtividade das equipes de armação e forma, crescimento da aderência ao planejamento, melhoria de acompanhamento e controle da execução, melhor integração entre os diferentes departamentos da construtora e nova organização de trabalho com encarregados multidisciplinares. Como avanços a serem implantados têm-se: adoção do sistema em fases anteriores do empreendimento, uso do Building Information Modeling (BIM) e desenvolvimento da integração da construtora com fornecedores e clientes. / Civil construction industry responds to a high consumption of human, material and equipment resources, but the traditional model of construction management is based on simple conversion processes associated with large wastes, productivity losses and delays. The adoption of continuous flow of activities is an alternative to improve the processes of a project and can be achieved by using a rhythmic production system, creating competitive advantages to construction companies. In infrastructure, due to the complexity of the projects and the difficulty in establishing repetitive elements, the implementation of such system is uncommon. The objective of this work is to critically evaluate the implementing of a rhythmic production system in an infrastructure project, to relate the challenges faced during the process, to verify evolutions of productivities and of adherence to the planning throughout the project and to show that this system can meet various principles of lean construction philosophy. The methodology adopted was literature review of production systems, lean philosophy and lean construction, with some examples of practical application, followed by a case study of the construction of a subway station in São Paulo. In the project studied a method was adopted consisting in information gathering, identification of repetitive elements, definition of construction sections, determination of work rhythm, activities planning, programming, monitoring and control. This work concludes that the rhythmic production system, as well as the presented method, can be implemented in other infrastructure projects. The advantages of the system are increased productivity of steel assembly and framing teams, growth of adherence to planning, improved follow-up and control of execution, better integration between different departments of the construction company and new work organization with multidisciplinary managers. As advances to be implemented are: adoption of the system in previous phases of the project, use of Building Information Modeling (BIM) and development of the contractor\'s integration with suppliers and customers.
96

Redesenho do sistema de gestão da produção em Empresa Construtora: estudo de caso com foco no planejamento físico de obra. / The redesign of the production management system in a construction company: case study with focus on planning engineering.

Maria Letícia Bassoli Chirinéa 06 December 2017 (has links)
Sobretudo no período de 2007 a 20141, a construção civil brasileira atravessou uma de suas melhores épocas. A partir de 2015 essa situação começou a se reverter e, não obstante o dinamismo das atividades e o enorme crescimento dos negócios realizados anteriormente, a concorrência entre as construtoras do setor tornou-se mais acentuada. Diante desse cenário, o Planejamento Estratégico da Produção tornou-se ferramenta poderosa para se sobressair nessa disputa, não somente por suas características de aumento de desempenho do processo de produção, mas também devido ao grande potencial de diferenciação frente a concorrentes em um mercado cada vez mais competitivo. Nesse contexto, em que se buscam ganhos de produtividade, redução do desperdício e aumento de qualidade; metodologias e ferramentas baseadas em princípios e conceitos de Lean Construction mostram-se como alternativas aos métodos tradicionalmente utilizados na gestão da produção de edifícios. O presente trabalho tem como objetivo registrar e analisar criticamente o processo de redesenho do Sistema de Gestão da Produção (SGP), com foco no processo de planejamento físico de obra, em uma empresa construtora por meio do estudo de duas obras. A análise inclui ferramentas empregadas, dificuldades enfrentadas e soluções adotadas. Visa-se com isso a ajudar a suprir uma carência de registros de tal natureza, que possam servir de orientação para outras empresas que queiram trilhar caminho semelhante. Os principais referenciais teóricos são oriundos da Lean Construction, assim como da teoria de planejamento físico de obra. Com base nos objetivos estabelecidos, foram definidos os métodos de pesquisa; estes são de duas naturezas: estudo de referências e levantamento de dados, sendo o último composto por observação em campo (diagnóstico da empresa e obras estudadas) e entrevistas com especialistas em planejamento de obras da empresa. Com base no estudo das referências e nos dados levantados, foram realizados os registros e análises, bem como confronto dos resultados alcançados com a teoria estudada. Espera-se contribuir para a difusão de conceitos relacionados a boas práticas, levando conhecimento aos profissionais do mercado brasileiro, focando na melhoria contínua não somente das rotinas de obra, mas também da Organização como um todo, ajudando a demonstrar que um sistema de gestão da produção que adote os fundamentos estudados e esteja alinhado à estratégia da empresa, pode trazer resultados, demonstráveis ponto de vista qualitativo em um primeiro momento e quantitativo, após seu amadurecimento na empresa. / Especially from 2007 to 2014, the Brazilian construction industry has gone through one of its best times. From 2015 on, the situation began to reverse and, despite the dynamism of activities and the enormous growth of transactions made, competition among sector construction has become more pronounced. In order to change this backdrop, the Strategic Construction Planning became a powerful tool to excel in this dispute, not only for their features increase performance of the production process, but also because of the great potential for differentiation against competitors in a market increasingly more competitive. In this context, in which they seek productivity gains, reduce waste and increase quality, methodologies and tools based on principles and concepts of Lean Construction show themselves as alternatives to the methods traditionally used in the construction management of buildings. This study aims to record and review the implementation process of Production Management System (SGP) innovator in a construction company, including tools used, difficulties encountered and solutions adopted, with emphasis on the planning process physical work. The goal is to help it overcome the lack of records of such a nature that can serve as a guide for other companies that want to tread a similar path. The main theoretical references are from Lean Construction, as well as physical planning theory. The present research aims to register and critically analyze the process of redesign of the Production Management System, focusing on the process of physical planning of work, in a company through two case studies. The analysis is based on tools employed, difficulties faced and solutions adopted. It aims to help to fulfill a gap of records of construction knowledge, which can serve as a guide for other companies that want to change the way they work in jobsite. Therefore has as its main method of research the Lean Construction, as well as the physical planning platform. Based on established objectives, the research methods were defined. These are of two natures: bibliographical review and data collection, the last being composed by observation in the jobsite, company diagnosis, and of interviews with planning works experts of the company. Based on the bibliographical review and the data collected were performed with records and analyzes, as well as comparing the results achieved with the theory studied. It is expected to contribute to the dissemination of concepts related to practices used in other countries, bringing knowledge to professionals in the Brazilian market, focusing on continuous improvement not only of the work routines, but also the organization as a whole, helping to demonstrate that a production management system that adopts the grounds studied and is aligned with the company\'s strategy can bring results, to be shown of the qualitative or quantitative points of view.
97

Aprimoramentos do sistema  de gestão da produção em empresa construtora utilizando lean thinking - estudo de caso / Improvements of the production management system in a construction company using lean thinking - case study.

Thomas Martin Diepenbruck 28 April 2017 (has links)
Em um ambiente altamente competitivo, as empresas construtoras buscam sua sobrevivência e o aumento do valor para o cliente cada vez mais pela melhoria de sua produtividade e pela redução de seus custos. Esta busca se dá em geral pelo uso de novas tecnologias, porém não melhorar a gestão do seu processo produtivo na mesma proporção pode comprometer todo o investimento feito em tecnologias. Além disso, é fundamental conhecer o quê é valor para cada cliente, para poder escolher com exatidão os princípios e ferramentas de gestão da produção mais aderentes às suas necessidades específicas, gerando vantagem competitiva. Este trabalho, por meio de revisão bibliográfica e de um estudo de caso em uma empresa construtora, registra o processo de implantação e a percepção de mudanças pelas equipes de suas obras após os aperfeiçoamentos feitos em seu Sistema de Gestão da Produção, baseados em princípios do Lean Thinking. Os resultados obtidos na pesquisa e as análises críticas feitas pelo autor constituem uma rica fonte de informações para retroalimentação do Sistema de Gestão da Produção da empresa estudada, bem como para o de outras empresas que pretendam trilhar caminhos semelhantes. / In a highly competitive environment, construction companies seek their survival and the increase of value for their clients by improving productivity and reducing costs. Usually this search takes place through the use of new technologies, but not improving the management of their building process in the same proportion can compromise the entire investment in technology. Besides that it is essential to know what each client takes for value for choosing the best tools and methodologies for managing them as demanded by their specific needs, to generate competitive advantage. This work, based on a review and a case study in a construction company, records the implementation process and the changes perceived by its site management team, regarding improvements done in its production management system, based on Lean Thinking principles. The results obtained in the research and the critical analyzes made by the author constitute a rich source of information for feedback for the production management system of the studied company, as well as from other companies wishing to follow similar paths.
98

Padronização de processos produtivos e melhoria contínua como fatores de aumento da produtividade na construção. / Standardization of production procedures and continuous improvement as factors of productivity increase in the construction industry.

Nero Lenotti Zanotti 28 June 2018 (has links)
A Construção Civil é conhecida como uma das indústrias com mais baixa produtividade da mão de obra se comparada com as demais indústrias. Entre os diversos fatores para tal baixa produtividade, a gestão é apontada como o maior deles. Como alternativa para melhorar a produtividade da mão de obra na construção, foram estudados dois temas: padronização de processos produtivos e melhoria contínua. Este trabalho tem como objetivos: descrever o processo de implantação destes dois temas em uma obra de infraestrutura, evidenciar as vantagens de sua aplicação, propor uma metodologia prática de integração entre padronização de processos produtivos e melhoria continua, e por fim, consolidar os temas estudados. A metodologia para cumprir esses objetivos utilizou-se de uma revisão bibliográfica sobre Lean Construction, que serviu como base para aplicação dos conceitos, melhoria contínua, produtividade de mão de obra e padronização de processos de produção e uma pesquisa-ação, na qual o autor participou ativamente da pesquisa. Durante a pesquisa, foram desenvolvidos um formulário para captura de melhorias realizadas pelas equipes de produção chamado de Kaizen e procedimentos operacionais para padronizar os processos de produção. O impacto da aplicação destas ferramentas foi medido na produtividade da mão de obra em diversas equipes de produção de dutos. Como resultado houve um aumento da produtividade nas equipes, uma menor variabilidade da produção e a diminuição de interrupções da produção. Por fim, é feita uma proposta de integração prática dos conceitos apresentados. / Civil Construction industry is known as one of the less productive compared to other industries. Among many factors for such low productivity, the management is pointed as the major one. As an alternative to enhance labor productivity in the construction industry, two topics were researched: standardization of production procedures and continuous improvement. The objective of this research is: describe the process of execution of these two topics in an infrastructure construction project, to evidence the vantages of its application, propose a useful methodology to integrate the standardize production procedures and the continuous improvement, and at last, consolidate the both researched topics. The methodology to fulfill these objectives was a literature review about Lean Construction, which is the foundation to the application of the two concepts, continuous improvement, labor productivity, standardization of production procedures and an action research, that the author had an actively participation. During the research, it was developed a form to capture the improvements made by the production teams called Kaizen and operational procedures to standardize production processes. The impact of this tools´ application was measured at the labor productivity rate in different pipeline production teams. As a result, there was an increase of productivity in all teams, a decrease in the production variability and the decrease of production time interruptions. At the end, it is made a proposition of useful integration of the concepts researched.
99

Edificios industriais : soluções construtivas para a manufatura lean / Industrial buildings : constructive solutions for lean manufacture

Ghion, Ronaldo 12 August 2018 (has links)
Orientador: Flavio Augusto Picchi / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Civil, Arquitetura e Urbanismo / Made available in DSpace on 2018-08-12T06:42:45Z (GMT). No. of bitstreams: 1 Ghion_Ronaldo_M.pdf: 3177349 bytes, checksum: d62782ac8b1c26414a1fdb230d1d2a00 (MD5) Previous issue date: 2008 / Resumo: A modernização de empresas de manufatura tem apontado para a necessidade cada vez maior de flexibilidade em sua produção. O conceito de lean thinking vem sendo largamente aplicado com este e outros objetivos, implicando em constantes mudanças de layout, gerando exigências de modificações na infra-estrutura industrial. Este trabalho visa caracterizar de maneira exploratória, as soluções construtivas aplicadas em edifícios industriais, face às exigências crescentes de flexibilidade da produção. Para esta análise, parte-se do levantamento, a partir da literatura, dos princípios fundamentais e principais ferramentas do lean thinking, e das diversas definições e enfoques de flexibilidade, buscando-se identificar demandas de flexibilidade do edifício industrial. Foi realizado um estudo de caso, baseado em dados decorrentes de modificações ocorridas nas instalações de uma montadora de veículos comerciais. São identificadas situações em que a falta de flexibilidade do edifício industrial, considerado como infra-estrutura industrial (utilidades, equipamentos e dispositivos auxiliares da produção), gerou custos adicionais na adequação às mudanças do sistema de manufatura. O estudo conclui apontando soluções construtivas, exploradas ou não, para dar maior flexibilidade nas situações identificadas, gerando diretrizes para novos projetos e comprovando a utilidade do enfoque para identificar lacunas para novos estudos e inspiração para novas aplicações. / Abstract: Manufacturing companies' modernization has demanded increasing production flexibility. Lean Thinking has been applied with this and others objectives, generating frequent layout changes which require industrial infra-structure modifications. This work identifies the opportunities of Lean Thinking concepts application extended to industrial infra structure, as element of flexibility, in order to attend changing, maintenance and modifying actions requested by lean manufacture. A case is presented regarding a truck and bus manufacture. This analysis begins with a literature review, of core elements and technological applications of industrial buildings, to identify ways to obtain the industrial infra-structure flexibility. Application opportunities are analyzed crossing lean core elements; technological building applications; and applying difficulties. This research concludes pointing out application opportunities, indicating that this approach is useful to identify gaps in research and application, as well as to plan new applications. / Mestrado / Edificações / Mestre em Engenharia Civil
100

4D-simulering som verktyg för tillämpning vid produktionsplanering

Lennartsson, Richard January 2018 (has links)
Produktionsplanering i ett projekt kan vara komplicerat eftersom den ofta inkluderar många aktiviteter som är beroende av varandra med många olika aktörer. Ett framgångsrikt projekt kännetecknas av en effektiv produktionsplanering där man styr och driver projekten med en exakt planering. I en produktionstidplan, som presenteras som ett gantt-schema med beroenden och kopplingar mellan aktiviteter, kan det vara svårt att göra bedömningar och dra konsekvenser av byggskedet och produktionssätt. Ett verktyg som inbjuder till att hitta och visualisera produktionssätt är 4D-simuleringar, som innebär att en BIM-modell kopplas till produktionstidplan och spelas upp som en animerad sekvens. Skanska Sverige är en aktör som har valt att börja utveckla och implementera användning av 4D-simuleringar i projekt. Förståelse om hur 4D-simuleringar kan bidra och komplettera i planeringsarbetet kan erhållas genom att undersöka användningsområden i produktionsfasen, vilka möjligheter och begränsningar som finns med detta samt genom att belysa nuläge och vad som kan betraktas som problemområden med produktionstidplanen som verktyg. I denna studie har intervjuer genomförts med projektrollerna tidplanerare, produktionschef och blockchef i två olika projekt, där man i produktionsfasen i projekten arbetar med att utveckla och implementera 4D och simuleringar. Detta har utförts för att empiriskt identifiera användningsområden för 4D-simuleringar i produktionsfasen, vad det kan bidra med och tillämpas för i produktionsplaneringen samt vad det finns för problemområden med produktionstidplanen. Med utgångspunkt i befintlig teori om 4D-simuleringar, produktionsplanering och produktionstidplan har den empiriskt insamlade datan analyserats för att redogöra för möjligheter och begränsningar med användning av 4D-simuleringar i produktionsfasen. Till följd av att forskning har visat att 4D/BIM kan komplettera lean construction har en analys utförts kring hur empiriskt identifierade användningsområden för 4D-simuleringar kan kombineras med planeringsmetodiken Last Planner System, som har sin utgångspunkt i lean construction. Resultatet i studien visade att jämföra olika planeringsalternativ, kvalitetskontrollera planering, planering av logistik samt visualisera ordningsföljd av aktiviteter och moment är användningsområden för 4D-simuleringar i produktionsfasen. Dessa användningsområden kan bidra i produktionsplaneringen genom att produktionstidplanen kan optimeras, planeringen i produktionstidplanen kan kontrolleras och följas upp, en tydlig plan för logistiken i ett tidigt skede kan erhållas, produktionsframdriften kan kommuniceras, yrkesgrupper kan samordnas och det kan användas i säkerhets- och arbetsmiljöarbetet. Studien visade följande: Det man i produktionsfasen i projekt identifierat som områden för användning av 4D-simuleringar tenderar att vara svårt att göra med produktionstidplanen som verktyg Användningsområdena för 4D-simuleringarna som har identifierats i projekt kan i det stora hela uppfyllas av de egenskaper som en 4D-simulering har 4D-simuleringar begränsas av detaljnivå och indelning av BIM-modell samt kopplingen Användningsområden och egenskaper för 4D-simuleringar kan relateras till lean construction principer och bidra i planeringssteg i Last Planner System, vilket påvisar att 4D-simuleringar kan komplettera och tillhandahålla grunden för lean construction

Page generated in 0.1141 seconds