• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

水庫移民政策轉變與執行:以瀾滄江為例 / Dam-induced Resettlement Along the Lancang River: Policy Change and Implementation

李泳雯, Sabrina Habich Unknown Date (has links)
中國經濟的快速成長導致電力需求的急劇增教。雖然現在主要仍是以煤炭的方式提供全國的電力,但中國政府也一直在尋找能有效降低環境污染的替代能源。因此“水力發電”在中國能源政策扮演的角色越來越重要--這時,擁有巨大水資源的雲南省就變成了中國西南的關鍵提電者之一。過去二十年之內,已有企業與政府針對該省重點的水力設施進行大量投資。然而,發展水電雖然有助於生產大量的電,也帶來眾多環境和社會層面的影響。中國政府承認這些反面的影響,因此開始了設計一系列水電發展政策來預防可能的嚴重後果。 本論文分析中國中央政府和雲南地方政府共同制定的水電移民政策,以及新政策對當地執行過程所帶來的影響。基於多元的田野調查,本論文顯示地方政府如何落實中央政府制定的政策。雖然這幾年中國的水庫移民政策有大量的改進,但因為建設大水電站涉及層面廣,時間長,安置過程久,所以中央政府政策的彈性調整,造成當地政府執行過程對不同時間的移民外置帶來不對等的安置,因此印發水庫移民的方抗。 / Policy-making of dam-induced resettlement is a dynamic process that shows how group interests have been distributed and adjusted during different stages of water resource development in China. Since 1949, China’s political direction, economic system and its national strength have been in constant flux, reflecting in the policy towards land appropriation and resettlement induced by water conservancy and hydropower projects. The present study focuses on the changes that have taken place in the area of dam-induced resettlement policy after 2006 when the first regulations on resettlement caused by water resource and hydropower projects were amended. It shows how this policy change is perceived by villagers relocated in the course of dam construction, and addresses the question of why policy improvements have not led to desired results. The paper first addresses policy change in the area of dam-induced resettlement over the past six decades. In subsequent sections, I draw on findings gathered during my doctoral fieldwork to demonstrate how the recent improvement of resettlement regulations for water resource and hydropower projects at the central level are translated into implementation strategies at the local level in Yunnan. I show that while delegating the implementation of resettlement processes to the lowest level of the administrative hierarchy allows for innovative policy experimentation and flexible adaptation, the long timespan needed for the construction of large dam projects gives rise to uneven policy implementation and resistance on the side of resettled communities.

Page generated in 0.0328 seconds