• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 54
  • 44
  • 25
  • 19
  • 3
  • 1
  • 1
  • 1
  • Tagged with
  • 161
  • 161
  • 52
  • 47
  • 43
  • 41
  • 38
  • 24
  • 23
  • 22
  • 21
  • 21
  • 21
  • 20
  • 20
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
141

Estudo do gerenciamento do tempo em projetos de construção civil enxuta através da simulação de eventos discretos. / Study of Project time management in lean construction problems through discrete event simulation.

Diego Cesar Cavalcanti de Andrade 20 December 2012 (has links)
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / O gerenciamento do tempo nos projetos de construção civil usualmente utiliza algoritmos determinísticos para o cálculo dos prazos de finalização e algoritmos PERT para avaliação da probabilidade de o mesmo terminar até uma determinada data. Os resultados calculados pelos algoritmos tradicionais possuem defasagens nos prazos se comparados aos encontrados na realidade o que vem fazendo com que a simulação venha se tornando uma ferramenta cada vez mais utilizada no gerenciamento de projetos. O objetivo da dissertação é estudar o problema dos prazos de finalização dos projetos desenvolvendo novas técnicas de cálculo que reflitam melhor os prazos encontrados na vida real. A partir disso é criada uma ferramenta prática de gerenciamento do tempo de atividades de projetos de construção enxuta baseada em planilha eletrônica onde serão utilizadas técnicas de simulação a eventos discretos, com base em distribuições de probabilidade como, por exemplo, a distribuição beta. / Time management in construction projects usually use deterministic algorithms to calculate the time of fulfillment, and PERT algorithms to evaluate the probability of such project ending by a certain date. The results achieved by traditional algorithms are not accurate when compared to those found in the field, which is increasing the use of simulation as a tool in project management. The aim of this dissertation is to study the deadline fulfillment problems of projects, developing new calculation techniques that better represent the deadlines found in real life. For such study is developed a practical tool for time management of lean construction projects based on spreadsheet which will be used discrete event simulation techniques based in probability distributions, such as, the beta distribution.
142

Avaliação de indicadores de planejamento e controle da produção na construção : boas práticas, eficácia e prazo / Evaluation indicators planning and production control for construction: good practice, efficiency and deadline

Oliveira, Carla Barroso de 30 July 2010 (has links)
Made available in DSpace on 2016-06-02T20:09:13Z (GMT). No. of bitstreams: 1 3235.pdf: 3513094 bytes, checksum: ebdbdf688fd22706055522794f8e30c8 (MD5) Previous issue date: 2010-07-30 / Financiadora de Estudos e Projetos / The effective implementation of appropriate development plans to the reality of the work becomes a crucial issue for a good construction companies performance. The ability to presage potential barriers in implementation enterprise enables companies to work in uncertain environments and solve any problems prior to the execution tasks, thereby protecting the production. The emergence of a new concept for management construction has been widely discussed, the Lean Construction. Given a set of practices linked to concepts and basic principles of Lean Construction and considered essential for effective planning, evaluation was made in 33 plans prepared by a consulting planning firm. Thus it was possible to achieve the main goal of this research: assessing the impact of good practices of PCP in the planning construction effectiveness. Other objectives were: evaluate the impact of effective planning and control in enterprise performance, analyze the causes for the non-completion of work packages, verify variations in indicators of production performance according to the type of company, and check for correlation between indicators studied. The results hasn t shown a direct relationship between the indicators. It was observed that 65% of good planning practices were used by the consulting planning firm and that it, along with its contractors, may improve the effectiveness of the planning process. It was possible to determine a valid model for predicting the time deviousness. / O efetivo desenvolvimento de planos de execução adequados à realidade das obras tornase uma questão crucial para o bom desempenho das empresas construtoras. A habilidade de antever possíveis barreiras à execução de um empreendimento capacita as empresas a trabalhar em ambientes incertos e solucionar eventuais problemas antes da realização das tarefas, protegendo, assim, a produção. O surgimento de um novo conceito para a gestão da construção tem sido bastante discutido: a Construção Enxuta. Com base em um conjunto de práticas vinculadas aos conceitos e princípios básicos da Construção Enxuta e consideradas essenciais para um planejamento eficaz, foi realizada a avaliação de 33 planos elaborados por uma empresa de consultoria em planejamento. Assim, foi possível alcançar o objetivo principal desta pesquisa: avaliar o impacto de boas práticas de PCP na eficácia do planejamento de empreendimentos da construção civil. Os outros objetivos desta pesquisa foram: avaliar o impacto da eficácia do planejamento e controle no desempenho de empreendimentos; analisar as causas da não conclusão dos pacotes de trabalho; verificar se há variação nos indicadores de desempenho da produção de acordo com o tipo de empresa; e verificar a existência de correlação entre os indicadores estudados. No que diz respeito aos resultados, não foi evidenciada relação direta entre os principais indicadores estudados. Observou-se que 65% das boas práticas de planejamento são utilizadas pela empresa de consultoria e que a mesma, juntamente com seus contratantes, pode melhorar a eficácia do processo de planejamento. Foi possível determinar um modelo válido para predição do desvio de prazo.
143

Projetos para produção de residências unifamiliares em light steel framing

Vivan, André Luiz 30 June 2011 (has links)
Made available in DSpace on 2016-06-02T20:09:13Z (GMT). No. of bitstreams: 1 3701.pdf: 4826071 bytes, checksum: f99af11a4c80ea08b67f201d33ce7f0a (MD5) Previous issue date: 2011-06-30 / Financiadora de Estudos e Projetos / This work has the aim to propose guidelines for the preparation of designs for production with the construction of single family houses of Light Steel Framing. These guidelines involve considerations about the presentation of designs and assembly sequences on the main elements of a building in Light Steel Framing, promoting higher constructability on projects. Parallel to these guidelines were developed some graphical detail, with respect to the elements discussed, based on the concept of Design for Assembly. For this, have been used the information from the literature review, which deals with concepts such as Concurrent Engineering, Lean Design and Design for Production, and information gathered in structured interviews. The product of this work contributes to the advancement of studies about the design process of Light Steel Framing, besides promoting the use of concepts just discussed or used in Construction. Being a prefabricated building system, Light Steel Framing collaborates with the modernization of the processes involved in small works and facilitates the use of management principles such as Lean Construction and tools such as Design for Assembly. / Este trabalho tem por objetivo principal a proposição de diretrizes para a elaboração de projetos para produção voltados para a construção de habitações unifamiliares de Light Steel Framing. Tais diretrizes envolvem considerações a respeito da apresentação dos projetos e sobre sequências de montagem dos principais elementos de uma edificação em Light Steel Framing, promovendo maior construtibilidade aos projetos. Paralelo a estas diretrizes, foram desenvolvidos alguns detalhes gráficos com relação aos elementos abordados baseados no conceito do Design for Assembly. Para isso, foram utilizadas as informações da revisão bibliográfica, que aborda conceitos como a Engenharia Simultânea, Lean Design e o próprio Projeto para Produção, e as informações coletadas nas entrevistas estruturadas. O produto desta dissertação contribui para o avanço dos estudos a respeito do processo de projeto do Light Steel Framing, além de promover o uso de conceitos pouco abordados ou utilizados na Construção Civil. Sendo um sistema construtivo pré-fabricado, o Light Steel Framing colabora com a modernização dos processos envolvidos em obras de pequeno porte e facilita o emprego de princípios de gestão como da Lean Construction e de ferramentas como o Design for Assembly.
144

Improving construction processes in Nigeria using the Last Planner® System

Ahiakwo, Ograbe A. January 2015 (has links)
This thesis describes a research investigation into the implementation of the Last Planner System (LPS) in Nigeria, to improve construction processes within the Nigerian construction industry. LPS is known to be the most developed practical use of Lean Construction. It focuses on minimising the negative impacts of variability, uncertainties, buffers, making projects more predictable, creating reliable work plans and convalescing collaborative planning. However, the Nigerian construction industry is associated with a number of challenges which impair its performance. These challenges were grouped and classified into six major barriers: these include: supervision and quality control, fluctuation and variations, subcontractor involvement, resistance to change, cultural issues, and lengthy approvals. Consequently, a Design Science Research (DSR) approach is adopted to evaluate the effectiveness of implementing LPS in construction projects in Nigeria. In order to achieve this aim, an Action Research strategy is adopted and three case studies are reported; two of these cases describe how LPS was successfully implemented in construction projects within Nigeria. While the third case involved an investigation into the state of production plan reliability, of a successful project in Nigeria. These projects were selected based on non-probabilistic sampling from different geographical locations in Nigeria to represent different kinds of construction projects within the country. The first and second cases involved the implementation of LPS within the construction of a prototype student’s hostel and the construction a 4 Kilometre single carriageway road respectively. The third on the other hand involved the construction of a multipurpose hydro-power dam project; where comparisons were made between typical LPS projects and the project management techniques applied within the project. Data was collected through observation site activities, interviews, documentary analysis and questionnaire survey. The data generated was subsequently analysed by means of content analysis and evaluated in terms of its reliability, validity, representativeness, flexibility, rigour and reflexivity. In view of the LPS implementation within the two case studies, six barriers were identified and classified together with the six barriers associated with the Nigerian Construction industry. These barriers were linked, measured and ranked in averages of their degrees of occurrences. It was revealed that the major barriers were cultural issues and resistance to change, while the others include; lengthy approval, subcontractor’s involvement, poor supervision and quality, fluctuations and variations. Hence, a framework was developed to mitigate these barriers, when implementing LPS in construction projects in Nigeria. The main steps of the framework include: the need to identify purpose; the need to identify stakeholders impact; the need to obtain Sponsorship; the need to build a cross functional team; the need to create measurement indices; the need for training on Lean techniques and LPS; and finally the need to create a right working climate. Furthermore a focus group between construction practitioners was organised to test and evaluate the framework developed. It was revealed from the focus group that the framework has the potential to facilitate the implementation process as proposed.
145

Aplicação dos princípios da construção enxuta em canteiros de obras suportada por simulação computacional

Araujo, Alexandre Vicentini de 30 August 2016 (has links)
Submitted by Alison Vanceto (alison-vanceto@hotmail.com) on 2017-02-17T12:11:12Z No. of bitstreams: 1 DissAVA.pdf: 5462126 bytes, checksum: dd39f79a2b4214655f4466707c8f0fab (MD5) / Approved for entry into archive by Ronildo Prado (ronisp@ufscar.br) on 2017-03-09T19:27:15Z (GMT) No. of bitstreams: 1 DissAVA.pdf: 5462126 bytes, checksum: dd39f79a2b4214655f4466707c8f0fab (MD5) / Approved for entry into archive by Ronildo Prado (ronisp@ufscar.br) on 2017-03-09T19:27:26Z (GMT) No. of bitstreams: 1 DissAVA.pdf: 5462126 bytes, checksum: dd39f79a2b4214655f4466707c8f0fab (MD5) / Made available in DSpace on 2017-03-09T19:39:36Z (GMT). No. of bitstreams: 1 DissAVA.pdf: 5462126 bytes, checksum: dd39f79a2b4214655f4466707c8f0fab (MD5) Previous issue date: 2016-08-30 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES) / This research aims to propose and simulate various scenarios based on the principles of Lean Construction aiming to run a reticulated structure of reinforced concrete residential building with multiple floors within the stipulated time in its planning, taking as within seven days (takt time) to completion. The research strategies adopted included a literature review, identification of application opportunities of the principles of Lean Construction, the development of computational model that represented the studied structure, as well as the various scenarios and their simulation. The opportunities of application of the Lean Construction principles were identified through evaluation of Value Stream Mapping (VSM) and Line of Balance (LB). Five scenarios were prepared, the first being the reference, from which were simulated improvements with the use of simulation software ProModel® in 2014. Each version simulation carried out with consideration of an improvement based on the principles of Lean Construction, resulted in the reduction of lead time, converging in the simulation of the latter scenario, for a little higher than the takt time. As a partial indicator of simulation scenarios were evaluated the average cycle times, drive, hold and conversion data they extracted the software used. A comparison of time between the first scenario, depicted as representing the simple observation of the site plus the inherent variability and the latter scenario, characterized by cumulative application of the principles of lean construction, showed that the cycle time returned a reduction in the order of 29% handling increased by 105%, the expected reduced by 54% and the conversion time reduced by 26%. The main result achieved in the fifth scenario was a Lead Time 66.2 hours production. It can be seen that the use of the VSM and simulation provides a clear and concise communication on lean approaches and thus allows the understanding and continuing evolution of Lean concepts. / Este trabalho tem por objetivo propor e simular vários cenários com base nos princípios da Construção Enxuta objetivando executar uma estrutura reticulada de concreto armado de uma edificação residencial de múltiplos pavimentos dentro do prazo estipulado no seu planejamento, tendo-se como prazo de sete dias (takt time) para sua finalização. As estratégias de pesquisa adotadas incluíram a revisão bibliográfica, a identificação das oportunidades de aplicação dos princípios da Construção Enxuta, a elaboração do modelo computacional que representou a estrutura estudada, assim como os vários cenários e sua simulação. As oportunidades da aplicação dos princípios da Construção Enxuta foram identificadas por meio da avaliação do Mapeamento do Fluxo de Valor (MFV) e Linha de Balanço (LB). Foram elaborados 5 cenários, sendo o primeiro o de referência, a partir do qual foram simuladas as melhorias com uso do software de simulação ProModel® na versão 2014. Cada simulação realizada, com a consideração de uma melhoria com base nos princípios da Construção Enxuta, resultou na redução do lead time, convergindo, na simulação do último cenário, para um valor pouco superior ao takt time. Como indicador parcial dos cenários da simulação, foram avaliados o valor médio dos tempos de ciclo, movimentação, espera e conversão, dados estes extraídos do software utilizado. A comparação dos tempos entre o primeiro cenário, caracterizado como a representação da simples observação do canteiro acrescido sua variabilidade inerente, e o último cenário, caracterizado pela aplicação cumulativa dos princípios da construção enxuta, mostrou que o tempo de ciclo retornou uma redução na ordem de 29%, a movimentação aumentou em 105%, a espera reduziu em 54% e o tempo de conversão reduziu em 26%. O principal resultado alcançado no quinto cenário, foi um Lead Time de produção de 66,2 horas. Pode-se observar que o uso do MFV e da simulação fornece uma comunicação clara e concisa sobre abordagens enxutas e, desta forma, permite a compreensão e a evolução contínua dos conceitos Lean.
146

Análise da gestão do processo de personalização de imóveis considerando os princípios da construção enxuta

Pagliaroni, Marco Aurellio Polenghi 27 August 2013 (has links)
Submitted by Aelson Maciera (aelsoncm@terra.com.br) on 2017-05-02T17:59:18Z No. of bitstreams: 1 DissMAPP.pdf: 30190250 bytes, checksum: 3a6f16b69af7213486c2a38154ed616b (MD5) / Approved for entry into archive by Ronildo Prado (ronisp@ufscar.br) on 2017-05-04T18:58:35Z (GMT) No. of bitstreams: 1 DissMAPP.pdf: 30190250 bytes, checksum: 3a6f16b69af7213486c2a38154ed616b (MD5) / Approved for entry into archive by Ronildo Prado (ronisp@ufscar.br) on 2017-05-04T19:47:05Z (GMT) No. of bitstreams: 1 DissMAPP.pdf: 30190250 bytes, checksum: 3a6f16b69af7213486c2a38154ed616b (MD5) / Made available in DSpace on 2017-05-04T19:52:52Z (GMT). No. of bitstreams: 1 DissMAPP.pdf: 30190250 bytes, checksum: 3a6f16b69af7213486c2a38154ed616b (MD5) Previous issue date: 2013-08-27 / Não recebi financiamento / The builders are looking to adopt measures to remain profitable due to increasing market competition. These measures involve not only the improvement of the production process, as well as meeting the needs and requirements of customers. The customization has been used to adapt the residential property to customer needs, thus improving the performance of the built environment and the value of the product. One of the reasons why the implementation of personalization on the world stage was increased socioeconomic pattern of the population which is now able to meet individualized expectations, being stimulated also by the tendency to customize, present in other sectors of the economy. However due to lack of planning and an effective system of communication and information management aimed at adoption of customization, there are delays and rework for the completion of construction stages. Lean Construction emerges as a methodology of workflows that aims to reduce non-value added activities. This study aimed to determine what types of customization are offered, which principles of the Lean Construction are applied and the information flow in building companies of residential buildings that offer customization to customers. As research methodology were conducted four case studies with the use of questionnaires and interviews that allowed the observation of the types of customization offered by the companies studied and the principles of Lean Construction that are being applied. Similarly, it was possible to answer the research question of how the internal processes of these companies that offer customization of residential properties are organized, outlining flowcharts of each company, that show the communication between the involved, from the sale of the property to the client to the delivery of materials required for execution of the work and customizations, and propose a template flowchart. / As construtoras procuram adotar medidas para se manterem rentáveis devido à crescente competitividade do mercado. Estas medidas envolvem não somente a melhoria do processo de produção, como também o atendimento às necessidades e exigências dos clientes. A personalização vem sendo utilizada para adaptar o imóvel residencial às necessidades dos clientes, melhorando assim o desempenho do ambiente construído e o valor do produto. Um dos motivos que levaram a implantação da personalização no cenário mundial foi o aumento do padrão socioeconômico de parte da população que passou a ser capaz de satisfazer anseios relativamente individualizados, sendo estimulada também pela tendência de personalizar, presente em outros setores da economia. Entretanto, devido à falta de um planejamento e um eficaz sistema de comunicação e de gestão de informações voltadas a adoção da personalização, observam-se atrasos e retrabalhos para a finalização de etapas construtivas. A Construção Enxuta surge como uma metodologia de fluxos de trabalho que visa a redução das atividades que não agregam valor. Este trabalho teve como objetivo verificar quais os tipos de personalização oferecidos, quais os princípios da Construção Enxuta aplicados e o fluxo de informações em construtoras que realizam obras de edificações residenciais e oferecem a personalização aos clientes. Como metodologia de pesquisa foram realizados quatro estudos de caso com a aplicação de questionários e entrevistas que possibilitaram a constatação dos tipos de personalização oferecidos pelas empresas estudadas e dos princípios da Construção Enxuta que estão sendo aplicados. Do mesmo modo, foi possível responder a questão de pesquisa de como são organizados os processos internos destas empresas que oferecem a personalização de imóveis residenciais, esquematizando os fluxogramas de cada empresa, que mostram a comunicação entre os envolvidos, desde a venda do imóvel para o cliente, até a entrega dos materiais necessários para a execução da obra e das personalizações, e propor um fluxograma modelo.
147

A medição de desempenho na construção enxuta: estudos de caso

Lorenzon, Itamar Aparecido 30 June 2008 (has links)
Made available in DSpace on 2016-06-02T19:50:06Z (GMT). No. of bitstreams: 1 2144.pdf: 3828622 bytes, checksum: 694c16ada15850620fadec0c6e2f58c6 (MD5) Previous issue date: 2008-06-30 / Currently the civil construction sector in under several internal and external pressures, including financing crisis, lack of new public constructions and increasing quality requirements demanded by the client. This environment leaded the companies of this sector to search for new solutions by adopting new organizational and production management practices. Within the alternatives, the Lean Construction, a derivation from the Lean Production, appeared as a way to manage civil construction productivity by reducing the activities that do not add value, by increasing flexibility and by increasing the transparency of the process. This new form of organizing the production brings new concepts that require new forms to measure the performance. In this context, this thesis aims to empirically investigate, applying a qualitative approach and multiple case study, how the companies which implemented the Lean Construction are using the performance measures within this form of production organization and administration. The field research was carried through four civil construction companies which applied Lean Construction principles. The empirical evidences showed that the studied companies had not incorporated all Lean Construction principles, with some of those only starting to be assimilated. Nevertheless, these companies had to modify their performance measures, mainly by creating pointers that evaluated this new form to manage the production. This theses brings a contribution to the civil construction sector by analysing the current use level of Lean Construction principles and by indicating the needed changes on how performance pointers are measured to incorporate this new management way. / A construção civil tem sofrido pressões internas e externas como crise financeira, escassez de obras públicas e aumento da importância da qualidade requerida pelo cliente. Esta conjuntura fez com que as empresas do setor buscassem soluções por meio da adoção de novas práticas de organização e gestão da produção. Dentre as várias alternativas, surgiu a Construção Enxuta (tradução livre de Lean Construction), uma derivação da Lean Production, que se apresenta como uma forma de gerir a produção na construção civil de maneira a reduzir as atividades que não agregam valor, aumentar a flexibilidade e fornecer a transparência do processo. Essa nova forma de organização da produção traz no seu bojo novos conceitos que requerem novas formas de medir o desempenho. Neste sentido, o objetivo deste trabalho foi verificar de forma empírica, numa abordagem qualitativa, por meio de estudos de caso, como as empresas estão adotando a Construção Enxuta, principalmente no que se refere à utilização de indicadores de desempenho para os processos construtivos nesta nova forma de organização e administração da produção. A pesquisa de campo foi realizada em quatro empresas da construção civil que trabalham com os princípios da Construção Enxuta. As evidências empíricas mostraram que as empresas não praticam na totalidade os princípios da Construção Enxuta, sendo alguns destes princípios tratados de forma incipiente e, com sua implantação, as empresas tiveram que adequar seu Sistema de Medição de Desempenho como forma de melhor atender essa nova realidade. Assim, esta tese contribui para o maior aprofundamento desta questão no setor da construção civil na medida em que se analisa o nível de adequação destas empresas aos princípios da Construção Enxuta e indica as mudanças na forma de medição de desempenho nesta nova forma de gestão.
148

Construção predial lean: mapeamento da cadeia de valor das estruturas metálicas / Construction land lean: mapping the value chain of metallic structures

Rodrigo Rodrigues Lyra da Silva 25 September 2005 (has links)
Este trabalho propõe uma organização para o processo de construção de um prédio comercial, encadeando a logística de abastecimento do canteiro com a montagem das estruturas metálicas. Esta foi desenvolvida a partir dos conceitos lean originários do Sistema Toyota de Produção e, posteriormente, foram aplicados em outros setores como o da construção civil. Para enfatizar problemas críticos de processo e identificar suas soluções, foi estudado um anteprojeto de obra localizada no Centro da cidade do Rio de Janeiro. A sincronização entre a atividade logística e o processo de montagem das estruturas seguiu a lógica lean de redução de tempos de espera, de eliminação de estoques em canteiro e de criação de frentes simultâneas de fechamento dos andares, como condição para a melhoria de produtividade da obra. Foi analisado o mapeamento da cadeia de valor do fluxo de materiais e operações compreendidos entre o depósito de estruturas e a obra, verificando o balanceamento de atividades de produção e os possíveis ganhos de produtividade. Os resultados obtidos evidenciariam potencial de ganho na medida em que fornece justificativas para a aplicação das ferramentas lean no estudo do anteprojeto de construção, integra a obra com o abastecimento logístico das estruturas e principalmente reduz os desperdícios de espera e estoque. Conclui-se, portanto, que o sistema lean, aplicado a este estudo, reúne condições para a melhoria de produtividade do processo construtivo e por conseguinte aumenta sua competitividade. / The aim of this work is to apply the Lean Construction plan, based on Toyota Production System, as the main strategy for the steel structure assembly in a commercial building. The Lean System target is to increase the productivity in the construction process by considering the synchronism between the logistic activities and the steel structural erection. This synchronism can be obtained by following the Lean Logic of reducing the time delay, the elimination of inventory in the building site and the organization of simultaneous teams for the assemblage of the steel parts. The material flow and the sequence of activities are represented in a value stream map, in order to identify the time wasted during the process and trying to otimize sequence of operation. At the end, by analyzing a particular project of a building at the center of Rio de Janeiro, the critical problems involved in a steel construction were identified and some alternative solutions for these problems, based on Lean System, are proposed.
149

Impact of BIM/LEAN on the interaction of construction project design teams

Herrera Valencia, Rodrigo Fernando 14 December 2020 (has links)
[ES] Los equipos de diseño de los proyectos de construcción están compuestos por diferentes interesados; esto podría dificultar las interacciones. Las metodologías BIM y Lean tienen un impacto positivo en los proyectos de construcción. Además, hay pruebas de la aplicación conjunta de BIM y Lean; sin embargo, se desconoce la relación empírica entre las prácticas Lean y los usos de BIM en la fase de diseño. Tampoco existe una comprensión más profunda de los fenómenos sociales que se generan entre los equipos de diseño cuando se aplican las metodologías de gestión BIM-Lean. Por lo tanto, el objetivo de esta investigación es entender el impacto de las prácticas de gestión de diseño Lean (LDM) y los usos BIM en la interacción de los equipos de diseño de los proyectos de construcción. El método de investigación tiene dos fases: 1) la creación de herramientas para evaluar el nivel de aplicación de las prácticas LDM y los usos BIM, y para comprender las interacciones en un equipo de diseño; y 2) el análisis de las relaciones entre BIM, Lean y la interacción, basado en información empírica de proyectos de construcción en fase de diseño. Los resultados presentan un instrumento de evaluación de usos del BIM y un cuestionario de prácticas de LDM para medir la gestión del diseño, y un método para comprender los diferentes tipos de interacción en un equipo de diseño. Basados en los datos de 64 proyectos, un análisis chi cuadrado reveló 33 relaciones empíricas entre los usos del BIM y las prácticas LDM; además, la aplicación de los usos del BIM implica una mayor aplicación de las prácticas LDM. El proyecto que aplica la gestión BIM-Lean logra numerosas interacciones en su equipo de diseño; flujos de información transparentes, ordenados y estandarizados; un entorno de colaboración, confianza y aprendizaje; y una gestión del compromiso. Todos estos elementos de interacción no son visibles en el proyecto, en el que no se aplicó la gestión BIM-lean. / [CAT] Els equips de diseny dels projectes de construcción están compostos per diferents interesats; açó podría dificultar les interaccions. Les metodologies BIM i Lean tenen un impacte positiu en els projectes de construcció. A més, ni hi ha proves de l'aplicació conjunta de BIM i Lean; no obstant, es desconeix la relació empírica entre practiques Lean i els usos de BIM en fase de diseny. Tampoc existix una comprensió mes profunda dels fenómens socials que es generen entre els equips de diseny quan s'apliquen les metodologies de gestió BIM-Lean. Per tant, l'objectiu d'esta investigació es entendre l'impacte de les practiques de gestió de diseny Lean (LDM) i els usos BIM en l'interacció dels equips de diseny dels projectes de construcción. El métode de investigació te dos fases: 1) la creació de ferramentes per a evaluar el nivell d'aplicació de les practiques LDM i els usos BIM, i per a comprendre les interaccions en un equip de diseny; i 2) l'análisis de les relacions entre BIM, Lean i la interacció, basades en informació empírica de projectes de construcció en fase de diseny. Els resultats presenten un instrument d'evaluació d'usos del BIM i un questionari de practiques de LDM per a mesurar la gestió del diseny, i un método per a comprendre els diferents tipos d'interacció en un equip de diseny. Basades en les dades de 64 projectes, un análisis chi cuadrado va revelar 33 relacions empíricas entre els usos del BIM i les práctiques LDM; a més, l¿aplicació dels usos del BIM implica una major aplicació de les práctiques LDM. El projecte que aplica la gestió BIM-Lean obté nombroses interaccions en el seu equip de diseny; fluxes d'informació transparents, ordenats i estandarizats; un entorn de colaboració, confiança i aprenentatge; i una gestió del compromis. Tots estos elements d'interacció no son visibles en el projecte, en el que no es va aplicar la gestió BIM-lean. / [EN] Design teams of construction projects are composed of different stakeholders; this fact could make the interactions difficult. BIM and Lean methodologies have a positive impact on construction projects. Besides, there is evidence of the combined implementation of BIM and Lean; however, it is not known the empirical relationship between Lean practices and BIM uses in the design phase. Also, there is not a deeper understanding of the social phenomena that are generated among design teams when BIM-Lean management methodologies are implemented. Therefore, the objective of this research is to understand the impact of Lean design management (LDM) practices, and BIM uses in the interaction of construction project design teams. The research method has two phases: (1) the creation of tools to assess the level of implementation of LDM practices and BIM uses and to understand the interactions in a design team; and (2) the relationship analyses between BIM, Lean, and interaction, based on empirical information from construction projects in the design phase. The results present a BIM uses assessment tool and an LDM practices questionnaire to measure the design management and a method to understand the different types of interaction in a design team. Based on data from 64 projects, a chi-square analysis revealed 33 empirical relationships between BIM uses and LDM practices; also, the application of BIM uses implies a greater application of LDM practices. The project that applies BIM-Lean management achieves many interactions among its design team; transparent, orderly, and standardized information flows; a collaborative, trust, and learning environment; and commitment management. All these interaction elements are not visible in the project, where BIM-lean management was not applied. / Herrera Valencia, RF. (2020). Impact of BIM/LEAN on the interaction of construction project design teams [Tesis doctoral]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/158718 / TESIS
150

Propuesta e implementación de un plan de mejora continua para incrementar el trabajo productivo de las torres grúa a partir de su análisis en tres proyectos multifamiliares en Lima / Proposal and implementation of an improvement plan to increase the productivity work of tower cranes starting from the analysis in three multi-family projects in lima

Duffóo Arévalo, Gabriel Alonso 19 June 2021 (has links)
Las torres grúa tienen una importancia muy relevante al momento de construir proyectos civiles. Con su inclusión en un proyecto esta maquinaria facilita el movimiento de materiales de construcción, ahorrando así principalmente tiempos y trabajos. Sin embargo, el costo de su instalación, gastos generales, capacitaciones, entre otros puede llegar a representar en varios casos hasta el 7% del presupuesto total en lo que respecta a proyectos inmobiliarios. Por tal motivo, es importante sacarle el mayor provecho posible a esta herramienta de construcción a fin de agilizar procesos de construcción cumpliendo con la programación establecida evitando así retrasos e incremento de costos. El presente estudio tiene como objetivo proponer un plan de mejora continua para el incremento del trabajo productivo de las torres grúa a partir de un análisis de su trabajo según la metodología Lean Construction. El procedimiento constó de recolectar datos por medio de las cartas balance de tres edificaciones cuyas etapas de construcción y ejecución de actividades deberían ser similares para estas tres obras. Luego, se procedió a identificar las posibles causas de la baja productividad para estas ser analizadas a través de una matriz de riesgo y así clasificarlas según el riesgo que conllevaría cada una. Después, se seleccionaron aquellas de criticidad media y alta esto con el objetivo final de proponer un plan de mejora que permita mitigar estos problemas. Esta propuesta fue implementada en uno de los proyectos anteriormente analizados obteniendo finalmente resultados positivos en donde el trabajo productivo tuvo un incremento mínimo de 8%. / Crane towers have a very relevant importance for building projects. With its inclusion in a project, this equipment facilitates the movement of construction materials, saving mainly time and work. However, the cost of its installation, general expenses, training, and others, can in several cases represent up to 7% of the total budget projects. For this reason, it is important to get the most value of this construction tool to speed up construction processes by fulfilling with the established schedule and avoiding delays that at the end turn into higher costs. The present study aims to propose a continuous improvement plan to increase the productive work of tower cranes based on an analysis of their work according to the Lean Construction methodology. The procedure consisted of collecting data through balance charts of three buildings whose stages of construction and execution of activities should be similar for these three projects. Then, we proceeded to identify possible causes of low productivity to be analyzed through a risk matrix and thus classify them according to the risk that each one would entail. Afterwards, those of medium and high criticality were selected with the final objective of proposing an improvement plan that would mitigate these problems. This proposal was implemented in one of the previously analyzed projects, finally obtaining positive results where the productive work had a minimum increase of 8%. / Tesis

Page generated in 0.0924 seconds