• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 21
  • 2
  • Tagged with
  • 25
  • 25
  • 16
  • 14
  • 13
  • 10
  • 9
  • 9
  • 9
  • 7
  • 7
  • 6
  • 5
  • 5
  • 5
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

[en] BRAZILIAN NAVY S RESPONSE CAPACITY IN SUPPORTING DISASTERS FROM THE PERSPECTIVE OF MATURITY MODELS / [pt] CAPACIDADE DE RESPOSTA DA MARINHA DO BRASIL EM APOIO A DESASTRES SOB A ÓTICA DE MODELOS DE MATURIDADE

VINICIUS SOUZA HENRIQUES 05 February 2024 (has links)
[pt] Poucas cadeias de suprimentos demandam tanta atenção quanto àquelas voltadas para o socorro e salvamento de vítimas de desastres, como é o caso da Logística Humanitária. Dentro deste contexto, as Forças Armadas (FA) encontram-se entre os principais stakeholders envolvidos, com vasto histórico de atuação em resposta a desastres, como é o caso da Marinha do Brasil (MB). Para que essas estruturas estejam bem coordenadas, seus processos devem estar formalizados e divulgados, sendo constantemente avaliados. Neste sentido, os modelos de maturidade se mostram ferramentas eficientes, de rápido entendimento e aplicação, direcionando as organizações para identificação de suas forças e fraquezas. Isto posto, o objetivo desta dissertação é reconhecer a capacidade de resposta a desastres da MB e verificar possíveis melhorias neste processo, utilizando para isso um modelo de maturidade para processos de desastres em duas situações distintas: pandêmica (Situação 1) e geral (Situação 2). Para atingir esse objetivo, foi realizada uma revisão de literatura buscando mapear o amparo jurídico de emprego das FA nesses cenários e as instruções dele derivadas, internamente na MB. Em seguida, foi realizado um estudo de caso, onde entrevistas com especialistas, participantes em cenários reais como a COVID-19 e as inundações em Nova Friburgo em 2011, confirmaram essa documentação. A pesquisa identificou novos processos prescritos, que não haviam sido encontrados em estudos anteriores, e constatou que algumas tarefas são realizadas pelas Organizações Militares, porém não estão previstas nas publicações. Também foi definido o estágio atual de maturidade da MB para uma situação de emergência, alcançando ao grau final 4 para as duas situações investigadas. / [en] Few supply chains require as much attention as those regarding aiding and rescuing disaster victims, such as the humanitarian logistics. Within this context, the Armed Forces (AF) are among the main stakeholders involved, with a long history of working in disaster response, which is the case of the Brazilian Navy(BN). For these structures to be well coordinated, their processes must be well developed and constantly evaluated. In this sense, maturity models are efficient tools that can be quickly understood and applied, helping organizations to identify their strengths and weaknesses. That said, this dissertation aims to recognize the Navy s disaster response capacity and verify possible improvements in this process, using a maturity model for disaster processes in two different situations: the COVID-19 pandemic (Situation 1) and general (Situation 2). To achieve this goal, a literature review was conducted to outline the legal support of the AF participation in these scenarios and its internal regulations. Then, a case study was conducted, where interviews with experts, participants in real scenarios, such as COVID-19 and the floods in Nova Friburgo in 2011, confirmed this documentation. The research discovered different processes that were not identified in previous studies and found out that these Military Organizations carry out some tasks but are not prescribed in the publications. BN s current stage of maturity for an emergency was also defined, reaching a final grade of 4 for both investigated situations.
22

Uma abordagem de apoio à avaliação e melhoria de processo de software baseada em metamodelagem e transformações de modelos / An approach to support assessment and improvement of software processes based on metamodeling and model transformations

Feloni, Daniel Fernando Galego 28 March 2016 (has links)
Melhoria de processo de software (SPI) é uma prática de engenharia de software motivada pela necessidade de aumentar a qualidade e a produtividade no desenvolvimento de software. Um fato amplamente reconhecido é que a qualidade do produto de software pode ser, em grande parte, determinada pela qualidade do processo utilizado para desenvolvê-lo e mantê-lo. A avaliação do processo de software ajuda as organizações de software a amadurecerem seus processos, identificando problemas críticos para estabelecer prioridades de melhoria. Essa avaliação pode ser feita por meio da comparação do estado dos processos da organização em relação a um modelo de referência que estabeleça estágios de melhoria. Uma avaliação geralmente se baseia em um modelo de processo de software que fornece um roteiro para melhorias. Este trabalho tem como objetivo estabelecer uma abordagem que: (i) define um conjunto de modelos de abstração (metamodelos) de modelos de maturidade de processo de software para apoiar uma metodologia de avaliação/melhoria de processo de software com o objetivo de certificação; e (ii) permite avaliar os processos de uma organização em comparação com um modelo de maturidade por meio de transformações desses metamodelos. A abordagem é instanciada por meio de um estudo de caso utilizando os modelos MPS.Br e CMMI para exemplificar sua aplicação. Como resultado, é apresentado um comparativo entre as limitações encontradas nas metodologias encontradas na literatura e como a abordagem sugere superá-las. / Software process improvement (SPI) is a software engineering practice motivated by the need to increase the quality and productivity in software development. A fact widely recognized is that the quality of the software product can be largely determined by the quality of the process used to develop and maintain it. The assessment of software process helps software organizations to improve themselves, identifying their critical problems to establish priorities for improvement. This assessment can take place by comparing the state of the organization on their software processes to a reference model that shows stages of improvement in scales. An assessment is usually based on a software process model that provides a roadmap for improvement. This work aims to establish an approach that: (i) defines a set of abstraction models (metamodels) of software process maturity models to support an assessment/improvement methodology aiming software process certification; and (ii) evaluates the organization processes in comparison with the maturity models through transformations of those metamodels. The approach is instantiated through a case study using the MPS.Br and CMMI models to illustrate its application. As a result, a comparison between the limitations found in the methodologies identified in the literature and how the approach suggested overcome them is presented.
23

Identificação de variáveis que impactam o sucesso de projetos nas empresas brasileiras. / Identification of variables that impact the projects success in Brazilian companies.

Berssaneti, Fernando Tobal 12 July 2011 (has links)
Nos tempos atuais, cada vez mais as organizações têm executado projetos, seja para solucionar problemas técnicos, seja para promover mudanças e direcionar seus esforços para melhores ou novos negócios. Tradicionalmente, metas de prazo, custo e qualidade, conhecidas como triângulo de ferro, são utilizadas como critérios para medição de sucesso de projetos. Nas últimas três décadas, muitos estudos foram publicados na tentativa de entender os fatores e variáveis que levam a projetos bem sucedidos ou fracassados. Na tentativa de contribuir com esses estudos, esta tese busca analisar as relações entre aspectos organizacionais e aspectos específicos dos projetos (internos) com o sucesso dos projetos executados por organizações brasileiras, avaliado por meio da visão tradicional: conformidade com orçamento (custo); cronograma (tempo); especificações técnicas (requisitos do produto/serviço); e atendimento às demandas dos clientes. Para confirmar ou refutar as proposições de pesquisa estabelecidas, esta pesquisa adotou uma abordagem quantitativa, com um levantamento (survey) junto a 336 (trezentos e trinta e seis) profissionais da área. Para a coleta de dados, foi elaborado um instrumento de pesquisa (questionário) com base na literatura acerca do tema. Os resultados apontam diferenças estatisticamente significativas para quatro variáveis que, quando presentes, influenciam positivamente o sucesso dos projetos nas empresas brasileiras. As variáveis são: recursos necessários para o projeto disponibilizados (pela alta administração); utilização de ferramentas de gerenciamento de projetos; aplicação de atividades de coordenação em projetos; e maturidade em gerenciamento de projetos. A conclusão da pesquisa revela que as proposições de estudo não se confirmaram de forma plena. Não foram encontradas variáveis ou equações explicativas que levassem ao sucesso total dos projetos (atendimento pleno do triângulo de ferro). Os resultados confirmaram apenas diferenças estatisticamente significativas que levam ao sucesso parcial. / In present days, many organizations have been conducing projects even to solve technical problems or even to deliver changes and focus their efforts towards better and new businesses. Time, cost and quality targets, known as \"iron triangle\", have been traditionally used as projects\' success measures. During the last three decades, many studies trying to understand the factors and variables that drive well succeeded or failed projects have been published. Attempting to contribute with these studies, this thesis analyses the relations between organizational and project specific (internal) aspects, with the success of projects developed by brazilian organizations, assessed through a traditional view: achieving budget (cost); scheduling (time); technical specifications (product/service requisites); and accomplishment of clients demands. In order to confirm or deny the propositions established, this research adopted a quantitative approach, through a survey conducted with 336 professionals in the field of projects. Data collection has been supported by a research instrument (questionnaire) based on the subject literature. The results point to significant statistical differences for four variables that positively influence project success when they exist on brazilian companies. Those variables are: required resources effectively available (by high administration); using project management tools; applying project coordination activities; and project management maturity. The conclusion of the research reveals that the propositions of the study were not completely confirmed. Explanatory variables or equations have not been found to justify total project success (completely achieving the \"iron triangle\"). The results confirm only the significant statistical differences that drive to partial success.
24

Identificação de variáveis que impactam o sucesso de projetos nas empresas brasileiras. / Identification of variables that impact the projects success in Brazilian companies.

Fernando Tobal Berssaneti 12 July 2011 (has links)
Nos tempos atuais, cada vez mais as organizações têm executado projetos, seja para solucionar problemas técnicos, seja para promover mudanças e direcionar seus esforços para melhores ou novos negócios. Tradicionalmente, metas de prazo, custo e qualidade, conhecidas como triângulo de ferro, são utilizadas como critérios para medição de sucesso de projetos. Nas últimas três décadas, muitos estudos foram publicados na tentativa de entender os fatores e variáveis que levam a projetos bem sucedidos ou fracassados. Na tentativa de contribuir com esses estudos, esta tese busca analisar as relações entre aspectos organizacionais e aspectos específicos dos projetos (internos) com o sucesso dos projetos executados por organizações brasileiras, avaliado por meio da visão tradicional: conformidade com orçamento (custo); cronograma (tempo); especificações técnicas (requisitos do produto/serviço); e atendimento às demandas dos clientes. Para confirmar ou refutar as proposições de pesquisa estabelecidas, esta pesquisa adotou uma abordagem quantitativa, com um levantamento (survey) junto a 336 (trezentos e trinta e seis) profissionais da área. Para a coleta de dados, foi elaborado um instrumento de pesquisa (questionário) com base na literatura acerca do tema. Os resultados apontam diferenças estatisticamente significativas para quatro variáveis que, quando presentes, influenciam positivamente o sucesso dos projetos nas empresas brasileiras. As variáveis são: recursos necessários para o projeto disponibilizados (pela alta administração); utilização de ferramentas de gerenciamento de projetos; aplicação de atividades de coordenação em projetos; e maturidade em gerenciamento de projetos. A conclusão da pesquisa revela que as proposições de estudo não se confirmaram de forma plena. Não foram encontradas variáveis ou equações explicativas que levassem ao sucesso total dos projetos (atendimento pleno do triângulo de ferro). Os resultados confirmaram apenas diferenças estatisticamente significativas que levam ao sucesso parcial. / In present days, many organizations have been conducing projects even to solve technical problems or even to deliver changes and focus their efforts towards better and new businesses. Time, cost and quality targets, known as \"iron triangle\", have been traditionally used as projects\' success measures. During the last three decades, many studies trying to understand the factors and variables that drive well succeeded or failed projects have been published. Attempting to contribute with these studies, this thesis analyses the relations between organizational and project specific (internal) aspects, with the success of projects developed by brazilian organizations, assessed through a traditional view: achieving budget (cost); scheduling (time); technical specifications (product/service requisites); and accomplishment of clients demands. In order to confirm or deny the propositions established, this research adopted a quantitative approach, through a survey conducted with 336 professionals in the field of projects. Data collection has been supported by a research instrument (questionnaire) based on the subject literature. The results point to significant statistical differences for four variables that positively influence project success when they exist on brazilian companies. Those variables are: required resources effectively available (by high administration); using project management tools; applying project coordination activities; and project management maturity. The conclusion of the research reveals that the propositions of the study were not completely confirmed. Explanatory variables or equations have not been found to justify total project success (completely achieving the \"iron triangle\"). The results confirm only the significant statistical differences that drive to partial success.
25

Uma abordagem de apoio à avaliação e melhoria de processo de software baseada em metamodelagem e transformações de modelos / An approach to support assessment and improvement of software processes based on metamodeling and model transformations

Daniel Fernando Galego Feloni 28 March 2016 (has links)
Melhoria de processo de software (SPI) é uma prática de engenharia de software motivada pela necessidade de aumentar a qualidade e a produtividade no desenvolvimento de software. Um fato amplamente reconhecido é que a qualidade do produto de software pode ser, em grande parte, determinada pela qualidade do processo utilizado para desenvolvê-lo e mantê-lo. A avaliação do processo de software ajuda as organizações de software a amadurecerem seus processos, identificando problemas críticos para estabelecer prioridades de melhoria. Essa avaliação pode ser feita por meio da comparação do estado dos processos da organização em relação a um modelo de referência que estabeleça estágios de melhoria. Uma avaliação geralmente se baseia em um modelo de processo de software que fornece um roteiro para melhorias. Este trabalho tem como objetivo estabelecer uma abordagem que: (i) define um conjunto de modelos de abstração (metamodelos) de modelos de maturidade de processo de software para apoiar uma metodologia de avaliação/melhoria de processo de software com o objetivo de certificação; e (ii) permite avaliar os processos de uma organização em comparação com um modelo de maturidade por meio de transformações desses metamodelos. A abordagem é instanciada por meio de um estudo de caso utilizando os modelos MPS.Br e CMMI para exemplificar sua aplicação. Como resultado, é apresentado um comparativo entre as limitações encontradas nas metodologias encontradas na literatura e como a abordagem sugere superá-las. / Software process improvement (SPI) is a software engineering practice motivated by the need to increase the quality and productivity in software development. A fact widely recognized is that the quality of the software product can be largely determined by the quality of the process used to develop and maintain it. The assessment of software process helps software organizations to improve themselves, identifying their critical problems to establish priorities for improvement. This assessment can take place by comparing the state of the organization on their software processes to a reference model that shows stages of improvement in scales. An assessment is usually based on a software process model that provides a roadmap for improvement. This work aims to establish an approach that: (i) defines a set of abstraction models (metamodels) of software process maturity models to support an assessment/improvement methodology aiming software process certification; and (ii) evaluates the organization processes in comparison with the maturity models through transformations of those metamodels. The approach is instantiated through a case study using the MPS.Br and CMMI models to illustrate its application. As a result, a comparison between the limitations found in the methodologies identified in the literature and how the approach suggested overcome them is presented.

Page generated in 0.1043 seconds