• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 399
  • 11
  • 3
  • Tagged with
  • 416
  • 242
  • 106
  • 76
  • 71
  • 70
  • 69
  • 66
  • 53
  • 52
  • 50
  • 50
  • 49
  • 48
  • 44
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
111

Metodologia para classificação e tratamento de eventos especiais / Methodology for classification and treatment of special events

Veiga, Francisco Diuner 21 August 2015 (has links)
The electric utilities seek alternatives to permanently improve the contents of continuity of electricity, employing efforts for increasingly sophisticated alternatives and applying new methodologies in this area. The need for improved delivery systems reflects an increase in the reliability of these systems, allowing greater comfort for the consumers and also enabling the expansion of commercial and industrial activity since interruptions compromise their production. In this sense the electric utilities have sought to invest increasingly in electrical studies planning of the operation, seeking to meet a seasonally market clients that need for a certain period, a high quality score and reliability of the utility systems. At this market demand call special events, ie, are situations that require the full attention of the concessionaire, because in the event of interruption of electricity supply may reflect in huge losses to customers and the company's image. However, this study aims to identify which events will be treated as special and estimate levels of priority, thus enabling through treatment and classification methodology, plan the operation during these events, adopting operational actions that can come from meeting the expectations of customers ensuring the quality and reliability of electricity supply. / As concessionárias de energia elétrica buscam permanentemente alternativas para melhorar os índices de continuidade de energia elétrica, empregando esforços em alternativas cada vez mais sofisticadas e aplicando novas metodologias nesta área. A necessidade de melhoria dos sistemas de distribuição reflete um aumento da confiabilidade destes sistemas, permitindo um maior conforto para os consumidores e também possibilitando a expansão das atividades comerciais e industriais, uma vez que as interrupções comprometem sua produção. Nesse sentido, as concessionárias de energia elétrica têm buscado investir cada vez mais nos estudos elétricos de planejamento da operação, buscando atender um mercado sazonal de clientes que necessitam por um determinado período, um elevado índice de qualidade e confiabilidade dos sistemas da concessionária. A esta demanda de mercado chamamos de eventos especiais, ou seja, são situações que necessitam da máxima atenção da concessionária, pois na ocorrência da interrupção do fornecimento de energia elétrica, pode refletir em prejuízos enormes a seus clientes e na imagem da empresa. Contudo este trabalho tem por objetivo identificar quais os eventos serão tratados como especiais e estimar níveis de prioridades, possibilitando-se assim, através da metodologia de tratamento e classificação, planejar a operação durante estes eventos, adotando ações operativas que possam vir de encontro as expectativa dos clientes, garantindo a qualidade e a confiabilidade do fornecimento de energia elétrica.
112

Estratégia de operações: estudos de caso em revendas de gás LP em cidades do nordeste do Brasil

Muniz, Luiz Fabiano de Oliveira 26 September 2014 (has links)
Made available in DSpace on 2016-06-02T19:52:09Z (GMT). No. of bitstreams: 1 6536.pdf: 5744234 bytes, checksum: 3254e778ef288a6a42f50e87dc293065 (MD5) Previous issue date: 2014-09-26 / One of the key factors for a successful resale of gas has, besides the relevant issues to any type of business it is maintaining a strategy aligned operations in which the Company Distributor maintains trade relations. Besides helping in the success of business strategies Distributor, resale becomes an agent of accomplishment and execution of the sale, despite its absolutely independent management. The goal of any organization, regardless of what it proposes to accomplish is to survive. But to enable such condition is very critical to have clearly defined what your positioning, as well as necessary for its operation presents a position to deliver the requirements sought by their customers attributes. In other words, this means that for an organization to be successful, it must, among other factors, the establishment of a goal to be achieved, the identification and understanding of the characteristics of competitors, differential required for operation and development of capabilities and new differential. This work aimed to study how dealers three gas companies, in northeastern Brazil, faithful to the same distributor develop their strategies and operations which the results obtained by them. To achieve this goal, first a literature able to support the development of a theoretical framework in order to develop a thorough knowledge of the subject studied and to establish a conceptual framework focused on field research, which was composed of studies was conducted case of exploratory and qualitative performed in each of the companies analyzed. After the description of the individual case studies, a cross was made of the results obtained, which were compared to identify similar characteristics and differences between companies. It was found that among the retailers studied, those with the highest level of integration with the distributor have trained to generate the expected results for its owners operating their function. In addition, issues such as defining strategic priorities, better level of service, investments and consistent development of decision areas become more favorable than that which does not share the same degree of integration. / Um dos fatores fundamentais para que uma revenda de gás tenha sucesso, além das questões pertinentes a qualquer tipo de negócio, é ela manter uma estratégia de operações alinhada à Companhia Distribuidora na qual mantem relações comerciais. Além de auxiliar no êxito das estratégias de negócio da Distribuidora, a revenda se torna um agente de realização e execução da venda, apesar de ter sua gestão absolutamente independente. O objetivo de qualquer organização, independente daquilo que se proponha realizar, é sobreviver. Porém, para que possa garantir essa condição, é fundamental ter muito claramente definido qual seu posicionamento, assim como os atributos necessários para que sua operação apresente condições de entregar os requisitos buscados por seus clientes. Em outras palavras, isso quer dizer que, para que uma organização seja bem sucedida é necessário, entre outros fatores, do estabelecimento de um objetivo a ser alcançado, da identificação e da compreensão das características dos concorrentes, dos diferenciais necessários para a operação e do desenvolvimento de capacitações e novos diferenciais. Este trabalho propôs-se a estudar o modo como três empresas revendedoras de gás, da região Nordeste do Brasil, fiéis ao mesmo distribuidor desenvolvem suas estratégias de operações e quais os resultados obtidos por meio delas. Para alcançar esse objetivo, primeiramente foi realizada uma pesquisa bibliográfica capaz de fundamentar a elaboração de um referencial teórico, com o intuito de desenvolver um conhecimento aprofundado sobre o tema estudado e de estabelecer uma estrutura conceitual voltada à pesquisa de campo, a qual foi composta por estudos de caso de caráter exploratório e qualitativo realizados em cada uma das empresas analisadas. Após a descrição dos estudos de caso individuais, foi feito um cruzamento dos resultados obtidos, os quais foram comparados a fim de identificar características similares e diferenças entre as empresas. Constatou-se que, entre as revendas estudadas, aquelas com o maior nível de integração com a distribuidora apresentam sua função operação capacitadas para gerar os resultados esperados por seus proprietários. Além disso, questões como definição das prioridades estratégicas, melhor nível de prestação de serviço, investimentos e desenvolvimento consistente de áreas de decisão se tornam mais favoráveis do que àquela que não compartilha do mesmo grau de integração.
113

Simulação da operação de sistemas hidroelétricos de potência a usinas individualizadas com regras otimizadas / not available

Makoto Kadowaki 04 August 1995 (has links)
As regras de operação adotadas para cada reservatório de um sistema hidroelétrico composto por várias usinas em cascata podem alterar de forma significativa a quantidade total de energia produzida. A regra de operação de reservatórios (ROR) mais adotada atualmente é a da operação em paralelo, segundo a qual os reservatórios mantêm o mesmo percentual em volume de armazenamento. Esta regra é reconhecidamente inconveniente, não refletindo a realidade operativa das usinas. No sistema brasileiro adota-se também a regra de operação em paralelo por faixas, onde agora os reservatórios são divididos em faixas e dentro destas opera-se em paralelo. Este método gera o problema de se determinar faixas convenientes para as usinas, de acordo com suas posições na cascata, o que ainda não foi feito de forma eficiente. A determinação das ROR para usinas hidroelétricas em cascata tem uma grande importância para o planejamento da operação energética de sistemas hidrotérmicos de potência. Ela é necessária no procedimento de agregação para obtenção do reservatório equivalente de energia assim como para estabelecer políticas de defluência utilizadas nos modelos de simulação, tendo um papel importante na metodologia de operação do Sistema Brasileiro. Neste trabalho, faz-se uma análise do comportamento ótimo dos reservatórios em cascata através de um modelo determinístico de otimização não-linear a usinas individualizadas. A seguir propõe-se um método para a obtenção de regras de operação otimizadas de reservatórios que estabelece uma relação entre o estado individual de armazenamento dos reservatórios e o estado agregado de armazenagem do sistema. Estas regras são representadas por curvas ou equações que procuram refletir, em média, as condições de operação ótima do sistema, reproduzindo desta forma uma operação mais próxima da real. Finalmente, faz-se uma comparação das ROR\'s assim obtidas e a regra de operação em paralelo, através da simulação da operação de um subsistema do Sistema Sudeste Brasileiro, e também pela montagem de reservatórios equivalentes de energia com as duas regras, mostrando-se em ambos os casos a melhor adequação das novas regras. / The operation rules adopted for each reservoir of a hydroelectric system, compound by several power plants in cascade, can modify, in a significant way, the total quantity of produced energy. The parallel operation is nowadays the most used reservoir operation rule (ROR). By this all the reservoirs maintain the same percentage of the total volume. This is a recognized improper rule that does not represent the operation reality of the power plants. The determination of the ROR\'s for cascade hydroelectric power plants is of great importance for the energetic operation planning of the hydroelectric power systems. The ROR\'s are necessary in the aggregation process for obtaining the composite representation of a multireservoir hydroelectric system ad also to give the flow down decision in the simulation models. Therefore, these rules are very important in the Brazilian System operation methodology. In this work the optimal behavior of cascade reservoirs is analyzed through a deterministic non-linear optimization model with individual representation of the power plant. Then, a method for this acquisition of optimized ROR\'s is proposed. In these rules a relationship between the reservoirs\' storage individual state and the system storage aggregate state is found. These rules are represented by curves or equations that aim to reflect, in average, the conditions of the system optimal operation, in this way representing an operation closer to reality. Finally, using a subsystem of the Brazilian Southeast System, a comparison of the obtained ROR\'s and parallel rule is made. Also, a composite representation is made with the two rules. In both cases the better behavior of the new rules is demonstrated.
114

Análise de risco em operações de \'offloading\' - um modelo de avaliação probabilística dinâmica para a tomada de decisão. / Risk analysis of offloading operations - probabilistic evaluation model for dynamic decision making.

Carmen Elena Patiño Rodriguez 16 February 2012 (has links)
Para explorar campos de petróleo offshore em águas profundas, o uso de plataformas offshore (FPSO - do inglês Floating Production Storage and Offloading) e navios aliviadores, nas últimas décadas, tornou-se uma alternativa economicamente e tecnicamente viável. A FPSO é um tipo de navio petroleiro transformado para a exploração, e armazenamento petróleo. O escoamento da produção é usualmente realizado por um navio tanque aliviador, conectado em tandem, ou por dutos. Porém o transporte marítimo realizado pelos navios petroleiros está sendo cada vez mais aceito, chegando a ser o principal meio para escoar a produção em águas profundas. Entretanto, como contrapartida desta viabilidade técnica, passou-se a executar operações de transbordo entre unidades flutuantes em ambientes mais agressivos, causando um aumento do risco associado com estas operações. Este trabalho, visando garantir a segurança das operações de transferência em alto mar, apresenta a aplicação de técnicas de análise de risco para a avaliação de operações de offloading entre unidades de produção tipo FPSO e navios aliviadores. É aplicado um método indutivo para a identificação de riscos baseado no princípio de que os acidentes acontecem como consequência do desenvolvimento de um evento de perigo durante a operação, que pode durar cerca de 24 horas. No contexto deste trabalho de pesquisa, a análise de risco é entendida como quatro processos sequenciais: (i) identificação dos cenários de perigos, (ii) estimação da probabilidade de ocorrência de falhas para cada cenário, (iii) avaliação das consequências, e, (iv) tomada de decisão. Para melhorar a avaliação da probabilidade é proposto o uso de técnicas bayesianas. Para fazer uma análise mais abrangente das consequências de falha é proposto utilizar o processo markoviano para modelar a probabilidade de mudanças do sistema FPSO-navio aliviador durante a operação de offloading que podem causar mudanças no perfil de risco. A tomada de decisão é usada para avaliar a possibilidade de desconexão de emergência durante a operação. O método é aplicado para avaliar o risco de uma operação de offloading na Bacia de Campos (Brasil), entre uma plataforma tipo FPSO e um navio aliviador tipo Suezmax. Verifica-se que as condições ambientais e a forma de realização da amarração exercem significativa influencia no perfil de risco. / To explore offshore oil fields in deep water the use of a Floating Production Storage and Offloading (FPSO) unit coupled to a shuttle tanker is economically and technically feasible. The FPSO unit normally consists of a ship shaped hull, with an internal or external turret, and production equipment on the deck. The unit is also equipped for crude oil storage. Oil transportation systems required for supporting this infrastructure are pipelines or shuttle tankers. Shuttle tankers are increasingly being accepted as a preferred transportation method for remote and deepwater offshore developments. The offloading operation is considered one of the most risky operations in offshore environments. This dissertation presents a risk-based analysis method aiming at defining the risk profile associated with an offloading operation. For offloading operations the risk profile is usually evaluated considering that the environmental condition could suffer changes during offloading that has an approximate duration of 24 hours. The method follows four basic steps: identification of hazard (using PHA technique), definition of failure scenarios and their probability of occurrence (using cause-consequence diagram and FTA) and evaluation of failure consequences. To improve the evaluation of failure consequences a more comprehensive analysis is proposed aiming at using the Markovian process to model the probability of changes during offloading operation that could cause changes in the risk profile developed in step two. The decision method is used to evaluate the possibility of emergency disconnection during the operation. The method is applied to evaluate the risk profile of an offloading operation in Campos Basin, Brazil, considering o FPSO. The analysis shows that the environmental conditions and the way that the tanker is moored have great influence on the risk profile.
115

Síntese de doutrina de segurança para projeto e operação de submarinos nucleares. / Synthesis of safety doctrine for nuclear submarine design and operation.

Leonam dos Santos Guimarães 18 August 1999 (has links)
Considerando tanto os aspectos nucleares quanto os navais, esta tese propõe-se a organizar e sistematizar uma Doutrina de Segurança Global aplicável a futuros Submarinos Nucleares de Ataque (SNA) nacionais. Esta doutrina tem a forma de um conjunto de princípios básicos, critérios gerais, requisitos específicos e procedimentos de verificação do projeto e de inspeção da construção e operação, que garantam um alto padrão de segurança a esta classe de navio de guerra. Com ela, pretende-se constituir uma base consistente e coerente sobre a qual a Autoridade de Segurança Nuclear, considerando os Objetivos de Segurança propostos, possa avaliar a aceitabilidade dos riscos associados ao Ciclo de Vida do SNA, tomando assim suas competentes decisões quanto ao licenciamento do submarino. Entendendo-se segurança como percepção social de riscos, são discutidos o detalhamento, as interpretações, as derivações e as aplicações tecnológicas deste conceito básico em três contextos específicos: a disciplina de Segurança de Funcionamento de Sistemas Industriais (Reliability-Availability-Maintanabilit-Safety), de aplicação geral; a Segurança de Instalações Nucleares “Estacionárias”, em especial de reatores de potência eletronucleares; a Segurança Naval, que engloba tanto a Segurança Marítima (segurança da navegação, salvaguarda da vida humana no mar), típica de condições normais de paz, como a Capacidade de Sobrevivência (Survivability), típica das condições de guerra ou conflito. É feita, então, uma primeira abordagem global à Segurança da Propulsão Nuclear, que sintetiza as aplicações do conceito básico nestes três contextos e ressalta sua fundamentação na otimização do conjugado disponibilidade x seguridade. Os Princípios Básicos de Segurança são, a partir desta abordagem global, adaptados às particularidades da propulsão nuclear de SNA. Como “Princípios Básicos” entende-se os Objetivos Gerais de Segurança e uma série de diretrizes qualitativas que orientam como estes objetivos podem ser alcançados. A seguir são propostos Critérios Gerais de Segurança para o projeto da Instalação Propulsora Nuclear (IPN) e de suas interfaces com a plataforma-navio do SNA. Como “Critérios Gerais” entende-se os Objetivos Detalhados de Segurança e uma série de diretrizes quantitativas que orientam o desenvolvimento do projeto integrado do conjunto de sistemas que compõem o SNA. São usados para garantir a adequação da segurança aos Princípios Básicos qualitativos. Os requisitos específicos de segurança aplicáveis ao projeto de estruturas, componentes e sistemas da IPN e da plataforma-navio do SNA derivados dos Critérios Gerais são então desenvolvidos. Estes “Requisitos Específicos” são entendidos como regras quantitativas que determinam o projeto individual das partes integrantes do SNA. São usados para assegurar que os sistemas individuais do submarino, quando integrados, atendam aos Critérios Gerais. São finalmente propostas diretrizes para o estabelecimento de uma regulamentação do processo de licenciamento dos SNA pela Autoridade de Segurança Nuclear e dos procedimentos de verificação da segurança do projeto e de fiscalização da operação associados. São ainda discutidos o conteúdo e a organização do Relatório de Análise de Segurança (RAS), documento básico deste processo, concluindo-se assim a estrutura da Doutrina de Segurança proposta. / Considering both nuclear and naval aspects, this thesis intends to organize and to systematize a Global Safety Doctrine applicable to future national Nuclear Attack Submarines (SSN). This doctrine has the form of a set of basic principles, general criteria, specific requirements, design verification process and procedures for construction and operation inspection, aiming the assurance of a high level of safety pattern to these warships. Consequently, the doctrine would form a consistent and coherent basis for Nuclear Safety Authority (NSA) evaluate the social acceptability of SSN life cycle risks, considering the proposed Safety Objectives, in order to contribute to its competent decisions on submarine licensing. Understanding safety as social perception of risks, detailing, interpretations, derivations and technological applications of this basic concept are discussed in three specific contexts: the Reliability-Availability-Maintainability-Safety (RAMS) discipline, of general application; the Safety of “Stationary” Nuclear Installations, specially power reactors; the Naval Safety, that includes both Marine Safety (navigation safety, safety of life in the sea), typical of normal conditions of peace, and Survivability, typical of the war or conflict conditions. A first global approach to the Safety of the Nuclear Propulsion, synthesizing the applications of the basic concept in these three contexts, and highlighting its foundation on a trade-off between availability and safety, is then developed. Starting from this global approach, Safety Basic Principles are then adapted to the particularities of the SSN nuclear propulsion. As “Basic Principles” it is understood the Safety General Objectives and an associated series of qualitative guidelines for reaching these objectives. Following, General Safety Criteria are proposed for the design of the Nuclear Propulsion Plant (NPP) and for its interfaces with SSN ship’s platform. As “General Criteria” it is understood the Safety Detailed Objectives and an associated series of quantitative guidelines to the development of the integrated design of SNA systems. They are considered to assure the SSN safety compliance to the qualitative Basic Principles. Specific safety requirements applicable to NPP and ship’s platform structures, components and systems design, derived from General Criteria, are then developed. These “Specific Requirements” are understood as quantitative rules that determine the individual design of SNA main parts. They are used to assure that the individual systems of the submarine, when integrated, comply to the General Criteria. Finally, they are proposed guidelines for the establishment of a regulatory process for SSN licensing by the Nuclear Safety Authority and for associated design safety verification procedures and operation safety enforcement. It is still discussed the Safety Analysis Report (SAR) content and organization, which constitutes the basic document for this process, concluding the structure of the Safety Doctrine proposal.
116

Maximização de receita de concessionária de transmissão de energia elétrica através da otimização da manutenção. / Increase of the revenue of transmission company through the otimization of the maintenance.

João Emanuel Lós Reis Fidalgo 11 June 2007 (has links)
Este trabalho apresenta as principais características a serem consideradas por gestores das concessionárias de serviço público de transmissão de energia elétrica, no tocante à importância da adoção efetiva de práticas conscientes de uma Política de Manutenção dos ativos destas empresas, no sentido de promover a maximização da margem proveniente da remuneração pelo uso desses ativos. A Política de Manutenção a ser definida deve considerar os efeitos advindos das indisponibilidades tanto programadas como forçadas, que levem em consideração os diversos aspectos em termos de confiabilidade visando o máximo retorno em termos econômicos da remuneração oferecida, ou seja, a melhor relação de custo benefício entre gastos e programação com desligamentos e receita final auferida. O Plano de Manutenção, além de ser avaliado através dos custos intrínsecos de suas principais atividades, deve ser visto como o conjunto de intervenções que: reduzam as indisponibilidades provocadas por causas intempestivas; resultem em manutenções programadas que minimizem as perdas de receitas e eliminem as interrupções imputáveis a causas evitáveis, através de uma modelagem estatística de taxas de falhas de equipamentos e módulos de equipamentos que realizem em conjunto funções remuneradas nos termos do Contrato de Prestação de Serviço de Transmissão, gerando dessa maneira aumento das receitas auferidas pelas Transmissoras através de otimização das ações de manutenção. / This work presents a modeling for simulation of different Maintenance alternatives and its corresponding results in terms of expected revenue, considering: Risks of installation, imperfections and its associated interruptions; Periods resulting from nonavailability by programmed maintenance; Prevented interruptions resultant of specific actions of maintenance. Useful life of all installations, determined by the commitment between the cost of maintenance x investment in new installations. For this reason, the Maintenance Plan, besides presenting an intrinsic cost of its main activities seems like a set of interventions in the system that: reduces non-availability provoked by intempestive causes; results in programmed interruptions that reduces losses of revenues. Eliminates interruptions imputable to avoidable causes (as the cleanness absence in the right of way). By usage of types of equipment, failure rates, times of historical repairs the developed model allows a simulation of expected revenue increases through the optimization of maintenance costs.
117

Recife-mercadoria e direito à cidade: a operação urbana consorciada Joana Bezerra

BERNARDINO, Raquel Ludermir 26 August 2015 (has links)
Submitted by Haroudo Xavier Filho (haroudo.xavierfo@ufpe.br) on 2016-01-12T19:03:50Z No. of bitstreams: 1 Dissertacao Raquel Bernardino - final - OK.pdf: 9003023 bytes, checksum: fcd18aa0ad8c1f525af290a64148897d (MD5) / Made available in DSpace on 2016-01-12T19:03:50Z (GMT). No. of bitstreams: 1 Dissertacao Raquel Bernardino - final - OK.pdf: 9003023 bytes, checksum: fcd18aa0ad8c1f525af290a64148897d (MD5) Previous issue date: 2015-08-26 / CNPq / 17 de setembro de 2010. Foi sancionada a primeira lei específica do Recife que aprova um plano de Operação Urbana Consorciada (OUC), denominada OUC Joana Bezerra (OUC-JB – Lei Municipal nº 17.645). A Operação visa a transformações urbanísticas, sociais e ambientais em uma área pública – predominantemente ocupada pela Zona Especial de Interesse Social (ZEIS) Coque – para a qual propõe a criação de um Polo Jurídico, empreendimento voltado à Prestação Jurisdicional do Estado. Mostra-se, a princípio, como um caso atípico frente a algumas OUCs em outros municípios brasileiros, haja visto que, no contexto recifense, os usuários permanentes são ora entes federativos, ora famílias de baixa renda, estando o interesse e a participação de parceiros privados ainda pouco explícitos. A dissertação analisou o Plano da OUC-JB em relação a dois paradigmas de planejamento que vêm polarizando a recente política urbana brasileira: um, conhecido como Planejamento Estratégico, por vezes associado à produção de “cidades-mercadoria” aptas para competir por negócios e investimentos privados; o outro, regido pelo marco legal estabelecido a partir do Estatuto da Cidade, que deveria ser associado à garantia do direito à cidade. Sendo essa uma operação “adormecida” – nem implementada, nem revogada – a análise do caso se baseou em dados secundários, como leis, projetos de lei, estudos de massa e demais informações oficiais, incluindo as acessadas por meio de portais da transparência. O trabalho evidenciou que a viabilidade da OUC-JB dependeria majoritariamente de recursos públicos e que o Plano propõe benefícios sociais questionáveis, que revestem expressivos interesses privados, além de abrir temerosos precedentes para intervenções em ZEIS. O plano desrespeita a diretriz do Estatuto da Cidade que prevê a justa distribuição dos benefícios e ônus do processo de urbanização e guarda semelhanças com a lógica de produção de “cidades-empresa” e “cidades-mercadoria”. Além disso, a formulação e a aprovação do Plano se deram por meio de processos opacos e inacessíveis à população, em desrespeito à gestão democrática participativa e em semelhança a processos de construção de consenso – condição social da cidade enquanto “pátria” – contribuindo para validar um “interesse único da cidade”, em detrimento de interesses sociais anteriormente legitimados. Apesar de pressupor a potencial ambivalência do instrumento OUC em relação aos paradigmas de planejamento estudados, a dissertação conclui que o Plano da OUC-JB se afasta das diretrizes do Estatuto da Cidade e se aproxima da lógica do Planejamento Estratégico, da lógica de produção de um “Recife-mercadoria”. / Since the Brazilian Statute of the City (SofC) was approved in 2001, there has been a decreasing excitement regarding some of its instruments, due to the negative impact unfolded through local implementation processes, remarkably associated with private interests in the production of urban space. The focus, here, is on the SofC instrument called Urban Operation Consortium (OUC) that consists in a public-private partnership based on exceptions of urban legislation afforded by the municipality in exchange for private resources to carry out urban transformation, through a specific process that should include public participation. In September 2010, the city of Recife approved its first intervention of the kind, entitled OUC Joana Bezerra (OUC-JB – Municipal Law nº 17.645): it proposes the creation of a State Judicial Hub in a public area predominantly occupied by low-income families, currently protected by the instrument Special Zones of Social Interest (ZEIS), aiming at urban, social and environmental transformation. The OUC-JB seems atypical in relation to what has been observed in other cities since its explicit beneficiaries are the state judicial system and the lowincome families of the ZEIS, while the private interest in the operation is still less clear. This dissertation discusses the Plan of the OUC-JB (1) in relation to the neoliberal agenda for cities to compete for private resources, synthesized through three analogies (“commodity-”, “enterprise-” and “homeland-cities”) and (2) in relation to the planning paradigm that should lead to the guarantee of the right to the city, which is highly associated with the guidelines of the Statute of the City. Since this operation is “on hold” – neither implemented nor revoked – the analysis was based on secondary data, such as laws, bills, mass studies and further official information accessed through government bodies and their transparency portals. As conclusion, it became clear that the OUC-JB depends mainly on public resources and that the Plan proposes questionable social benefits which covers expressive private interests, besides opening fearful precedents for intervention in ZEIS. The Plan violates the SofC guideline which provides for the fair distribution of benefits and burdens of urbanization processes, while bearing similarities with the logics of “commodity-cities” and “enterprisecities”. In addition, the formulation and approval of the Plan occurred through a remarkably opaque process, completely inaccessible to public participation, disregarding the mandatory democratic management of the city, as established in the SofC guidelines, while resembling consensus building processes typical of “homeland-cities” – which contributes to validate a “sole interest of the city” in detriment of a social interest previously legitimized (housing for low income families in public land). Overall, the Plan of the OUC-JB departs from the guidelines of the SofC and approaches the logics of strategic planning, that tends to produce the new face of a “Recife-commodity”.
118

Impacto da estratégia internacional de operação na estrutura da Cadeia de Suprimento Global de Commodity : o caso de Subsidiárias Petroquímicas no Estado de Pernambuco

MOSER, Daniela Didier Nunes 31 January 2009 (has links)
Made available in DSpace on 2014-06-12T15:08:12Z (GMT). No. of bitstreams: 2 arquivo2702_1.pdf: 1600404 bytes, checksum: 314bb2828f9f59ee3aca1fb0105d8af3 (MD5) license.txt: 1748 bytes, checksum: 8a4605be74aa9ea9d79846c1fba20a33 (MD5) Previous issue date: 2009 / Esta dissertação analisa como a estratégia internacional de operação de acordo com as categorias estabelecidas por Prahalad e Doz (1987): configuração, coordenação e responsividade local - definidas pela matriz afetam a estrutura da cadeia de suprimento de commodity de uma subsidiária petroquímica localizada no Estado de Pernambuco. A cadeia de suprimento global de commodity enfatiza a necessidade de não olhar apenas para o âmbito geográfico da dispersão dos arranjos produtivos, mas também para o seu escopo organizacional, buscando analisar e compreender seus vários agentes. A pesquisa é qualitativa e exploratória. É um estudo de múltiplos casos onde a unidade de analise é a subsidiária petroquímica instalada em Pernambuco - Lanxess (antiga Petroflex), empresa Alemã, e a M&G Polímeros, empresa Italiana. A coleta de dados baseou-se em entrevistas semi-estruturadas e pesquisa documental. Os principais resultados indicam que a forma como a matriz configura e coordena a estratégia internacional de operação de sua subsidiária, bem como a sua política de responsividade local implica em diferentes formas de estruturação da cadeia de suprimento global de commodity em subsidiária petroquímica
119

Amplificadores ópticos autônomos: desenvolvimento e análise de técnicas

BARBOZA, Erick de Andrade 20 July 2017 (has links)
Submitted by Fernanda Rodrigues de Lima (fernanda.rlima@ufpe.br) on 2018-08-29T19:39:30Z No. of bitstreams: 2 license_rdf: 811 bytes, checksum: e39d27027a6cc9cb039ad269a5db8e34 (MD5) TESE Erick de Andrade Barbosa.pdf: 14348736 bytes, checksum: 3deda52b9c99ae058b17979cabdd2ad2 (MD5) / Approved for entry into archive by Alice Araujo (alice.caraujo@ufpe.br) on 2018-09-05T18:54:30Z (GMT) No. of bitstreams: 2 license_rdf: 811 bytes, checksum: e39d27027a6cc9cb039ad269a5db8e34 (MD5) TESE Erick de Andrade Barbosa.pdf: 14348736 bytes, checksum: 3deda52b9c99ae058b17979cabdd2ad2 (MD5) / Made available in DSpace on 2018-09-05T18:54:30Z (GMT). No. of bitstreams: 2 license_rdf: 811 bytes, checksum: e39d27027a6cc9cb039ad269a5db8e34 (MD5) TESE Erick de Andrade Barbosa.pdf: 14348736 bytes, checksum: 3deda52b9c99ae058b17979cabdd2ad2 (MD5) Previous issue date: 2017-07-20 / FACEPE / Redes ópticas dinâmicas estão desa ando os dispositivos a se tornarem autoadaptativos. Por ser um dispositivo crucial para as redes ópticas, é necessário que o amplificador óptico tenha a capacidade de alterar seu ponto de operação de acordo com as necessidades da rede. O problema do controle adaptativo do ponto de operação dos amplificadores ópticos (Adaptive Control Operation Point - ACOP) é recente e poucas técnicas foram propostas para resolvê-lo. O objetivo desta tese é propor técnicas para resolver o ACOP, o que permitirá que os amplificadores em uma cascata de amplificadores adaptem seu ponto de operação de forma a aumentar, ou ao menos manter, a qualidade da transmissão do enlace. Serão consideradas técnicas que realizam esta adaptação de forma local e global, para que se possa avaliar os prós e contras relativos a qualidade das suas soluções e seus tempos computacionais. As técnicas também deverão respeitar restrição na potência de saída da cascata para que seja possível existirem enlaces com e sem técnicas ACOP em uma mesma rede. As técnicas propostas serão avaliadas em comparação com outras técnicas encontradas na literatura considerando-se um cenário realístico, inclusive com efeitos não-lineares. Também será avaliado se o controle de outros dispositivos, além do amplificador óptico, é capaz de melhorar as soluções das técnicas ACOP. Além disso, os benefícios das redes definidas por software (SDN) serão utilizados para implementar as técnicas como aplicativos de um plano de controle SDN em um ambiente de rede real. Os resultados alcançados mostram que a definição correta do ponto de operação dos amplificadores ópticos pode melhorar o desempenho da cascata de amplificadores, principalmente, por conta da redução do ruído inserido no sinal óptico e melhora da planicidade do sinal, em comparação ao método tradicional que define os ganhos dos amplificadores para compensar as perdas do enlace. / Dynamic optical networks are challenging the network devices to become self-adaptive. Since the optical amplifier is a crucial device in optical networks, it is necessary to add in this device the capability to change its operating point according to the network conditions. The problem of adaptive control of optical ampli er operating point (ACOP) is recent and few approaches have been proposed to solve it. The aim of this thesis is to propose approaches to solve the ACOP problem, which will enable optical ampli ers to adapt their operating points in order to increase, or at least maintain, the quality of the transmission in the link. It is considered approaches that perform this adaptation locally and globally, to evaluate the pros and cons related to the quality of their solutions and their computational time. The approaches will also respect a restriction in the cascade output power in order to enable the coexistence of links with and without ACOP approaches in the same network. The proposed approaches will be evaluated in comparison with other approaches proposed in the literature in realistic scenarios that consider nonlinear noise as a physical impairment. It is also evaluated if the control of other devices, besides the optical amplifier, can enhance the results of the ACOP approaches. Moreover, the benefits of software de ned networking (SDN) will be used to implement the approaches as an application that runs above a SDN control plane in a real network testbed. The achieved results show that the correct definition of the optical ampli ers operating points can enhance the transmission performance by reducing the inserted noise, and improving the gain flatness, when compared with the traditional method that de nes theamplifier gains to compensate the link losses.
120

Sistema de previsão de enchentes: integração de modelos de previsão de chuva, simulação hidrológica e hidrodinâmica

ALVES, Fellipe Henrique Borba 24 February 2017 (has links)
Submitted by Pedro Barros (pedro.silvabarros@ufpe.br) on 2018-08-28T22:10:21Z No. of bitstreams: 2 license_rdf: 811 bytes, checksum: e39d27027a6cc9cb039ad269a5db8e34 (MD5) DISSERTAÇÃO Fellipe Henrique Borba Alves.pdf: 14338383 bytes, checksum: 8f642c7124b0b97eb6b6d04da6fc748b (MD5) / Approved for entry into archive by Alice Araujo (alice.caraujo@ufpe.br) on 2018-09-06T22:01:53Z (GMT) No. of bitstreams: 2 license_rdf: 811 bytes, checksum: e39d27027a6cc9cb039ad269a5db8e34 (MD5) DISSERTAÇÃO Fellipe Henrique Borba Alves.pdf: 14338383 bytes, checksum: 8f642c7124b0b97eb6b6d04da6fc748b (MD5) / Made available in DSpace on 2018-09-06T22:01:53Z (GMT). No. of bitstreams: 2 license_rdf: 811 bytes, checksum: e39d27027a6cc9cb039ad269a5db8e34 (MD5) DISSERTAÇÃO Fellipe Henrique Borba Alves.pdf: 14338383 bytes, checksum: 8f642c7124b0b97eb6b6d04da6fc748b (MD5) Previous issue date: 2017-02-24 / A Região Nordeste do Brasil é comumente associada às secas prolongadas. No entanto, áreas específicas estão susceptíveis à ocorrência de chuvas intensas, onde podem ser geradas enchentes catastróficas. Nesse contexto, para a bacia do rio Una, em Pernambuco, foi desenvolvido um modelo de previsão de enchentes, capaz de integrar informações de previsão de chuva, modelagem hidrológica e modelagem hidrodinâmica. Neste trabalho buscou-se analisar dados dos modelos de previsão de chuva ETA 40 Km e APAC 9 Km, avaliar a distribuição da vazão gerada através de modelo hidrológico HEC-HMS e testar novos coeficientes de calibração, simular no modelo hidrodinâmico HEC-RAS o efeito da construção de barragens nas cidades de Palmares, Água Preta e Barreiros para o maior evento de chuva já registrado, ocorrido em 2010. Os resultados encontrados indicaram relevante diferença quantitativa e posicional nos dados dos modelos de previsão. O modelo hidrológico HEC-HMS teve melhorias na distribuição de vazão ao longo da bacia e na estabilidade global das vazões geradas. O modelo hidrodinâmico demonstrou redução significativa na vazão de pico a montante das áreas urbanas de Palmares, Água Preta e Barreiros, respectivamente. No entanto, mesmo com redução expressiva de vazão, as inundações nesses municípios ainda podem ocorrer caso eventos semelhantes ao de 2010 venham a acontecer. / Northeast Brazil is commonly associated with prolonged drought effects. However, in specific areas are likely to occur from intense rainfall events, where such events generate catastrophic flooding. In this context, an Advanced Flood Forecasting Model was developed for an Una river basin in Pernambuco, capable of integrating information on rainfall forecasting, hydrological modeling and hydrodynamic modeling. The objective of this work is to analyze the data of the ETA 40 km and APAC 9 km rain forecast models, to evaluate a flow distribution generated through a HEC-HMS hydrological model and to test new calibration coefficients, to simulate in hydrodynamic model HEC-RAS the effect of flood control dams and generate a flood spot in the cities of Palmares, Água Preta and Barreiros, considering the largest rainfall event ever recorded in 2010. The results indicated the quantitative difference and the data of the forecast models, the HEC-HMS hydrological model had improvements in the flow distribution along the basin and in the overall stability of the flows generated, the hydrodynamic model demonstrated a reduction in the upstream peak flow of the urban areas of Palmares, Água Preta and Barreiros, respectively. However, even with expressive flow reduction, such as floods in municipalities can still occur if events similar to the year 2010 occur again.

Page generated in 0.0363 seconds