• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3
  • 2
  • Tagged with
  • 5
  • 5
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Leerpotensiaal as keuringskriterium vir die opleiding van tellers

Van Schalkwyk, Lourens 01 1900 (has links)
Text in Afrikaans, abstract in Afrikaans and English / Wanneer psigometriese toetsing op groepe uit verskillende sosio-ekonomiese agtergronde toegepas word, presteer individue uit agtergeblewe omgewings swakker as bulle ewekniee uit meer ontwikkelde omgewings. Hierdie individue se toegang tot hoofstroom loopbaangeleenthede word dikwels bemoeilik as gevolg van die beperking. Die leerpotensiaal benadering word aangebied as belowende alternatief om die probleem, wat 'n sosio-ekonomiese oorsprong het, te oorbrug. Die resultate van die studie bewys die stelling gedeeltelik waar, maar met buitengewone inspanning. In die finale ontleding van die resultate is dit duidelik dat die verbeterde voorspelling eerder toegeskryf kan word aan die optimale vlak van ontwikkeling wat die individu bereik net voor die toetsing, en nie soseer sy/haar leerpotensiaal nie. / Applying psychometric tests to groups from different socio-economical backgrounds, inevitably result in the individuals from deprived backgrounds performing noteably poorer than their counterparts from more developed backgrounds. These individuals also find enterance to the mainstream careers difficult because of this restriction. The learning potential approach to assessment is presented as a promising alternative to overcome the problem that is related to the socio-economic background of the individual. The results of this study partly confirm the value of the learning potential approach, but only with extra-ordinary effort. In the final analysis of the results it is clear that the improved predictive accuracy was rather due to the optimal level of development the individuals reached just before the testing, and not so much their learning potential. / Psychology / M. Sc. (Sielkunde)
2

Estratégia de contratação ótima de geradores hidroelétricos considerando os impactos dos procedimentos operativos de curto prazo. / Optimal level of energy contracting strategy of the hydroelectric generators considering the influence of short term operating procedures.

Almeida, Rafael Ribeiro de 21 August 2012 (has links)
O trabalho apresenta uma discussão sobre o nível de contratação ótima dos geradores hidroelétricos participantes do Mecanismo de Realocação de Energia (MRE), considerando a influência dos Procedimentos Operativos de Curto Prazo (POCP). O assim denominado POCP é um conjunto de procedimentos realizados pelo Operador Nacional do Sistema (ONS) para proporcionar mais segurança no atendimento à carga do Sistema Interligado, sendo realizado no período de abril a novembro, durante o Programa Mensal de Operação (PMO). O gerador hidráulico, em função do despacho centralizado e normativo adotado no Brasil, dependendo da quantidade de água que aflui aos reservatórios e do consequente despacho das usinas determinado pelo ONS, fica sujeito às exposições no mercado de curto prazo, decorrentes da diferença entre os contratos de venda do gerador e o montante de garantia física (GF) alocada mensalmente após a realização do MRE. Como o POCP não está incorporado nos modelos de despacho das usinas do setor elétrico, uma alternativa de simulação foi construída e, a partir dos seus resultados, pode-se perceber a interferência do mecanismo em tela nas exposições no mercado de curto prazo e no patamar de risco incorrido. A aplicação do POCP traz um efeito líquido de redução da geração hidrelétrica, pois se diminui a possibilidade de utilizar a capacidade de regularização dos reservatórios, evitando riscos de eventual não recuperação dos reservatórios no período chuvoso. Por outro lado, o procedimento conservador hoje utilizado pode gerar um volume muito maior de vertimentos durante o período úmido, limitando a chance de recuperação financeira dos geradores hidrelétricos que tiveram sua geração reduzida no período seco devido ao despacho antecipado de termelétricas, fatalmente com rebatimentos traduzidos por exposições ao PLD. Por conta de todos os fatores de risco citados, os agentes geradores precisam ajustar sua estratégia ótima de contratação, mantendo a função objetivo de maximizar a receita, condicionado a critérios de risco, que ponderem os fatores citados. Nessa perspectiva, foi analisada a aplicação do POCP no ano de 2010 e seus impactos, além de simular a receita esperada e o risco futuro com e sem a aplicação deste mecanismo. Os resultados mostram o quanto o POCP interfere na receita esperada dos agentes, agregando maiores riscos e alterando-se o nível de contratação ótima. Sendo assim, dependendo do risco que cada agente gerador está disposto a assumir, uma revisão de seu nível de contratação torna-se imperiosa. / This work presents a discussion about the optimal level of energy contracting of the Hydroelectric Generators participants of the Energy Reallocation Mechanism, (MRE - Mecanismo de Realocação de Energia), considering the influence of Short Term Operating Procedures (POCP - Procedimentos Operativos de Curto Prazo). The POCP is a set of procedures performed by the National System Operator (ONS - Operador Nacional do Sistema) to provide more security in the Interconnected System, being carried out from April to November, during the Monthly Programme Operation (PMO - Programa Mensal de Operação). Hydro plants are subject to exposure in short-term market due to the centralized dispatch adopted in Brazil, which depends on the amount of water that flows to the reservoir and on the subsequent dispatch of plants determined by the ONS. The exposure in short-term market, arises from the difference between the Generator sales contracts and the amount of assured energy (GF - Garantia Física) monthly allocated after the MRE. As the POCP is not incorporated into the dispatch models of the electricity sector, an alternative simulation was built and, from its results, we can notice the interference of the mechanism displayed in the short-term market and in the incurred risk level. The application of the POCP brings a net reduction in hydropower generation, because it decreases the possibility of using the regularization capacity of the reservoirs, avoiding any risk of non recovery of the reservoirs during the rainy season. On the other hand, the conservative procedure used today can generate a much larger volume of spilling water during the wet season, limiting the chance of financial recovery of hydroelectric dams that had their generation reduced in the dry season due to the anticipated dispatch of thermoelectric plants, inevitably with repercussions represented by exposure to the PLD (SPOT). Considering all risk factors mentioned, the generating agents have to adjust their optimal strategy for contract level, retaining the objective function to maximize revenue, conditional to risk criteria, which consider the factors mentioned. From this perspective, we analyzed the application of the POCP in 2010 and its impacts, as well as simulated the expected revenue and the future risk with and without the application of this procedure. The results show how the POCP interferes in the expected revenue of the agents, adding greater risks and changing the optimal level of energy contracting. Thus, depending on the risk that each generating agent is willing to take, a review of their contracting level becomes imperative.
3

Leerpotensiaal as keuringskriterium vir die opleiding van tellers

Van Schalkwyk, Lourens 01 1900 (has links)
Text in Afrikaans, abstract in Afrikaans and English / Wanneer psigometriese toetsing op groepe uit verskillende sosio-ekonomiese agtergronde toegepas word, presteer individue uit agtergeblewe omgewings swakker as bulle ewekniee uit meer ontwikkelde omgewings. Hierdie individue se toegang tot hoofstroom loopbaangeleenthede word dikwels bemoeilik as gevolg van die beperking. Die leerpotensiaal benadering word aangebied as belowende alternatief om die probleem, wat 'n sosio-ekonomiese oorsprong het, te oorbrug. Die resultate van die studie bewys die stelling gedeeltelik waar, maar met buitengewone inspanning. In die finale ontleding van die resultate is dit duidelik dat die verbeterde voorspelling eerder toegeskryf kan word aan die optimale vlak van ontwikkeling wat die individu bereik net voor die toetsing, en nie soseer sy/haar leerpotensiaal nie. / Applying psychometric tests to groups from different socio-economical backgrounds, inevitably result in the individuals from deprived backgrounds performing noteably poorer than their counterparts from more developed backgrounds. These individuals also find enterance to the mainstream careers difficult because of this restriction. The learning potential approach to assessment is presented as a promising alternative to overcome the problem that is related to the socio-economic background of the individual. The results of this study partly confirm the value of the learning potential approach, but only with extra-ordinary effort. In the final analysis of the results it is clear that the improved predictive accuracy was rather due to the optimal level of development the individuals reached just before the testing, and not so much their learning potential. / Psychology / M. Sc. (Sielkunde)
4

Estratégia de contratação ótima de geradores hidroelétricos considerando os impactos dos procedimentos operativos de curto prazo. / Optimal level of energy contracting strategy of the hydroelectric generators considering the influence of short term operating procedures.

Rafael Ribeiro de Almeida 21 August 2012 (has links)
O trabalho apresenta uma discussão sobre o nível de contratação ótima dos geradores hidroelétricos participantes do Mecanismo de Realocação de Energia (MRE), considerando a influência dos Procedimentos Operativos de Curto Prazo (POCP). O assim denominado POCP é um conjunto de procedimentos realizados pelo Operador Nacional do Sistema (ONS) para proporcionar mais segurança no atendimento à carga do Sistema Interligado, sendo realizado no período de abril a novembro, durante o Programa Mensal de Operação (PMO). O gerador hidráulico, em função do despacho centralizado e normativo adotado no Brasil, dependendo da quantidade de água que aflui aos reservatórios e do consequente despacho das usinas determinado pelo ONS, fica sujeito às exposições no mercado de curto prazo, decorrentes da diferença entre os contratos de venda do gerador e o montante de garantia física (GF) alocada mensalmente após a realização do MRE. Como o POCP não está incorporado nos modelos de despacho das usinas do setor elétrico, uma alternativa de simulação foi construída e, a partir dos seus resultados, pode-se perceber a interferência do mecanismo em tela nas exposições no mercado de curto prazo e no patamar de risco incorrido. A aplicação do POCP traz um efeito líquido de redução da geração hidrelétrica, pois se diminui a possibilidade de utilizar a capacidade de regularização dos reservatórios, evitando riscos de eventual não recuperação dos reservatórios no período chuvoso. Por outro lado, o procedimento conservador hoje utilizado pode gerar um volume muito maior de vertimentos durante o período úmido, limitando a chance de recuperação financeira dos geradores hidrelétricos que tiveram sua geração reduzida no período seco devido ao despacho antecipado de termelétricas, fatalmente com rebatimentos traduzidos por exposições ao PLD. Por conta de todos os fatores de risco citados, os agentes geradores precisam ajustar sua estratégia ótima de contratação, mantendo a função objetivo de maximizar a receita, condicionado a critérios de risco, que ponderem os fatores citados. Nessa perspectiva, foi analisada a aplicação do POCP no ano de 2010 e seus impactos, além de simular a receita esperada e o risco futuro com e sem a aplicação deste mecanismo. Os resultados mostram o quanto o POCP interfere na receita esperada dos agentes, agregando maiores riscos e alterando-se o nível de contratação ótima. Sendo assim, dependendo do risco que cada agente gerador está disposto a assumir, uma revisão de seu nível de contratação torna-se imperiosa. / This work presents a discussion about the optimal level of energy contracting of the Hydroelectric Generators participants of the Energy Reallocation Mechanism, (MRE - Mecanismo de Realocação de Energia), considering the influence of Short Term Operating Procedures (POCP - Procedimentos Operativos de Curto Prazo). The POCP is a set of procedures performed by the National System Operator (ONS - Operador Nacional do Sistema) to provide more security in the Interconnected System, being carried out from April to November, during the Monthly Programme Operation (PMO - Programa Mensal de Operação). Hydro plants are subject to exposure in short-term market due to the centralized dispatch adopted in Brazil, which depends on the amount of water that flows to the reservoir and on the subsequent dispatch of plants determined by the ONS. The exposure in short-term market, arises from the difference between the Generator sales contracts and the amount of assured energy (GF - Garantia Física) monthly allocated after the MRE. As the POCP is not incorporated into the dispatch models of the electricity sector, an alternative simulation was built and, from its results, we can notice the interference of the mechanism displayed in the short-term market and in the incurred risk level. The application of the POCP brings a net reduction in hydropower generation, because it decreases the possibility of using the regularization capacity of the reservoirs, avoiding any risk of non recovery of the reservoirs during the rainy season. On the other hand, the conservative procedure used today can generate a much larger volume of spilling water during the wet season, limiting the chance of financial recovery of hydroelectric dams that had their generation reduced in the dry season due to the anticipated dispatch of thermoelectric plants, inevitably with repercussions represented by exposure to the PLD (SPOT). Considering all risk factors mentioned, the generating agents have to adjust their optimal strategy for contract level, retaining the objective function to maximize revenue, conditional to risk criteria, which consider the factors mentioned. From this perspective, we analyzed the application of the POCP in 2010 and its impacts, as well as simulated the expected revenue and the future risk with and without the application of this procedure. The results show how the POCP interferes in the expected revenue of the agents, adding greater risks and changing the optimal level of energy contracting. Thus, depending on the risk that each generating agent is willing to take, a review of their contracting level becomes imperative.
5

[en] THE DETERMINANT FACTORS OF THE OPEN CAPITAL BRAZILIAN COMPANIESNULL CAPITAL STRUCTURE: A DATA PANEL ANALYSIS / [pt] FATORES DETERMINANTES DA ESTRUTURA DE CAPITAL DAS EMPRESAS DE CAPITAL ABERTO NO BRASIL: UMA ANÁLISE EM PAINEL

FABIO LUIZ BIAGINI 13 January 2004 (has links)
[pt] Considerando a importância da estrutura de capital para as finanças empresariais, e apesar de não ainda existir consenso sobre a existência de uma estrutura ótima de capital, buscamos neste trabalho investigar à luz da Teoria da Hierarquização das Fontes de Financiamento, desenvolvida por Myers (1984), como a estrutura de capital das empresas brasileiras de capital aberto, no período de 1998 a 2002, estaria associada a uma dada hierarquia de preferência por fontes de financiamento, dentro da lógica proposta pelo autor, onde as empresas utilizariam primeiramente o autofinanciamento, em seguida recorreriam ao uso de dívidas, e como última opção optariam por emitir ações. Desta forma, este trabalho não visa discutir a problemática da existência ou não de uma estrutura ótima de capitais, mas sim analisar empiricamente a importância e validade dos diversos fatores apontados na literatura como determinantes da Estrutura de Capital das Empresas: Dimensão ou Tamanho, Oportunidades de Crescimento, Composição do Ativo, Lucratividade, Risco, propondo e verificando, inclusive, a significância de novas variáveis independentes como o Controle Acionário, Impacto Cambial, da Inflação e da Taxa de Juros. / [en] In view of the importance of the capital structure to corporate finance, and inspite of not existing consensus about the existence of the optimal capital structure yet, we seek in this work to research how the Capital Structure of Open Capital Brazilian Companies, from 1998 untill 2002, would be associated to a specific Pecking Order, inside the logical proposed by Myers (1984). In this way, this work does not try to discuss the existence or not of one optimal capital structure, but analyses empirically the importance and the validity of the many factors pointed in the literature as determinants of the Companies Capital Structure: Dimension, Growth Oportunity, Asset Composition, Profitability, Risk, also proposing and verifying the significance of new independent variables like the type of capital control, the impact of currency devaluation, inflation and the interest levels.

Page generated in 0.0391 seconds