• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Avaliação do impacto da utilização de parceria público-privada para construção e operação de unidades municipais de educação infantil em Belo Horizonte

Rodrigues, Bruno da Costa Lucas 16 December 2015 (has links)
Submitted by Bruno da Costa Lucas Rodrigues (brunor270@gmail.com) on 2016-01-18T08:25:33Z No. of bitstreams: 1 Dissertação Bruno Versão Final.pdf: 5963363 bytes, checksum: 8b1e0b7a0e8f5ae54f6183d793e06876 (MD5) / Approved for entry into archive by ÁUREA CORRÊA DA FONSECA CORRÊA DA FONSECA (aurea.fonseca@fgv.br) on 2016-02-01T19:28:30Z (GMT) No. of bitstreams: 1 Dissertação Bruno Versão Final.pdf: 5963363 bytes, checksum: 8b1e0b7a0e8f5ae54f6183d793e06876 (MD5) / Approved for entry into archive by Marcia Bacha (marcia.bacha@fgv.br) on 2016-02-11T13:08:07Z (GMT) No. of bitstreams: 1 Dissertação Bruno Versão Final.pdf: 5963363 bytes, checksum: 8b1e0b7a0e8f5ae54f6183d793e06876 (MD5) / Made available in DSpace on 2016-02-11T13:08:21Z (GMT). No. of bitstreams: 1 Dissertação Bruno Versão Final.pdf: 5963363 bytes, checksum: 8b1e0b7a0e8f5ae54f6183d793e06876 (MD5) Previous issue date: 2015-12-16 / School Infrastructure Public-Private Partnerships (PPPs) are being increasingly used over the globe. However, the literature that analyzes the role and impact of PPP models in education is still incipient. The present study aims to contribute to the literature investigating the impact of a school infrastructure PPP contract used in municipal schools in Belo Horizonte. The methodology was based in the comparison of 46 schools under two models, being 27 schools under a PPP model and 19 schools built and operated under traditional public procurement model. The results show that the time to build schools under the PPP Model is 45% shorter and that 79% of the schools under traditional model were delivered out of the contracted term of 13 months, while all PPP units were delivered below this time. In the same vain, the satisfaction level regarding maintenance services is substantially higher under PPP than under traditional model. Specifically in relation to IT services it was not observed positive results for PPPs. Finally, principals in PPP schools have 25% more time to focus on pedagogical activities, as they spend less time with the management of non- pedagogical services. One limitation of this study is not to provide a comparative analysis between the two models in terms of costs. This study aims to contribute to the improvement of PPP regulatory models used in the education and to the discussion of the role that could be played by PPPs in the reduction of school infrastructure deficit. / As Parcerias Público-Privadas (PPP) de infraestrutura escolar são cada vez mais utilizadas no mundo, entretanto as avaliações de impacto desse modelo ainda são escassas. O presente estudo contribui para essa área do conhecimento ao avaliar o impacto da utilização de PPP tanto na construção como na operação das Unidades Municipais de Educação Infantil (UMEIs) de Belo Horizonte (BH). A metodologia de pesquisa foi baseada na comparação de 46 UMEIs, sendo 27 unidades de PPP e 19 unidades construídas e operadas no modelo tradicional de contratação pública. Em relação ao impacto na construção, os principais resultados são que o tempo de obra das unidades de PPP foi 45% menor e que 79% das unidades tradicionais foram entregues fora do prazo contratado de 13 meses, enquanto que nenhuma PPP foi entregue acima deste prazo. Além disso, a PPP permitiu aumentar a escala na construção das UMEIs, superando as limitações do modelo tradicional. Dentre as principais evidências encontradas quanto ao impacto na operação, pode-se citar que os diretores de unidades de PPP afirmam ter 25% mais tempo para focar nas atividades pedagógicas, pois gastam menos tempo na gestão dos serviços não pedagógicos, e que o grau de satisfação com os serviços de manutenção das instalações físicas é substancialmente maior nessas unidades. Os resultados positivos para PPP só não apareceram em relação aos serviços de manutenção de TI. Uma limitação deste trabalho foi não conseguir realizar a comparação de custos das duas modalidades. O estudo pretende contribuir para o aprimoramento dos modelos regulatórios de PPPs em educação e para a discussão sobre o papel que pode ser desempenhado pelas PPPs na redução do déficit de infraestrutura escolar.

Page generated in 0.0562 seconds