Spelling suggestions: "subject:"planejamento e controle"" "subject:"planejamento e 1controle""
91 |
Protocolo de auditoria do uso de práticas da construção enxutaEtges, Bernardo Martim Beck da Silva January 2012 (has links)
A Construção Enxuta (CE) tem sido introduzida, gradativamente, na construção civil através de práticas como controle de perdas, gestão da qualidade e planejamento e controle da produção. Tendo em vista a disseminação da CE na indústria da construção, há a necessidade de medir o nível do seu uso nas empresas, o que permite identificar melhores práticas e oportunidades de melhoria. Desta forma, o presente trabalho tem por objetivo desenvolver um protocolo de auditoria do uso de práticas da CE. Esse método foi desenvolvido ao longo de quatro etapas: (a) uma revisão da literatura para identificar categorias de práticas da CE, tendo como base o material publicado nos anais dos eventos do International Group for Lean Construction (IGLC) entre 1993 e 2010; (b) definição de fontes de evidência para avaliar o uso de cada categoria de prática; (c) definição de pesos referentes à importância de cada prática, com base nas opiniões de sete especialistas em CE; e (d) aplicação do protocolo a um empreendimento da construção civil. O protocolo foi inicialmente aplicado como um estudo piloto em um canteiro de obras o que possibilitou melhorias no documento. A versão revisada do protocolo foi então aplicada no mesmo empreendimento em que ocorreu a aplicação piloto, gerando dados que possibilitaram a avaliação do protocolo segundo sua utilidade. / The Lean Construction (LC) hás been introduced gradually in construction through practices such as loss control, quality management, and production and planning control. Given the spread of the LC in the construction industry, there is a need to measure the level of use of LC in the companies, which allows us to identify best practices and improvement opportunities. Thus, this study aims todevelop a protocol for the use of audit LC practices. This method was developed over four stages: (a) a literature review to identify LC categories of practice, based on the papers published in the Annual IGLC Conferences between 1993 and 2010, (b) sources of evidences definition to evaluate the use of each category of practice, (c) definition of weights referring to the importance of each practice, based on the opinions of seven LC experts; and (d) the protocol aplication in na construction site. The protocol was initially implemented as a pilot study on a construction site which led to improvements in the audit document. The revised protocol was then applied in the same project that occurred in the pilot application, generating data that enabled the evaluation of the protocol according to its usefulness.
|
92 |
Programação de tarefas em linhas de produção customizadas baseada em curvas de aprendizado e fatores ergonômicos / Scheduling jobs in mass customized assembly lines based on learning curves and ergonomic factorsSantos, Luana Serafini dos January 2013 (has links)
A presente dissertação propõe heurísticas de programação da produção balizadas por curvas de aprendizado e fatores humanos com vistas à alocação de tarefas a equipes de trabalhadores. O objetivo é apresentar propostas de sequenciamento que integrem aspectos ergonômicos impactantes no desempenho do trabalhador, sem prejudicar as exigências produtivas do processo. Parte-se de uma revisão da bibliografia sobre técnicas de sequenciamento, curvas de aprendizado e fatores ergonômicos que influenciam no desempenho do trabalhador a fim de entender seu funcionamento e identificar formas de integração das mesmas. Desse modo, são propostos dois métodos de sequenciamento alinhados a curvas de aprendizado e fatores ergonômicos, aplicados em um processo da indústria calçadista. O primeiro método propõe uma adaptação da heurística de minimização da soma do atraso e adiantamento proposta por Pinedo (2008) em relação a uma data comum de entrega. O segundo método, denominado ATCE (Apparent Tardiness Cost with Ergonomic Factors), consiste na adaptação da regra ATC (Apparent Tardiness Cost) na minimização do atraso do processamento de lotes com distintas datas de entrega. Este último é então avaliado através de experimento de simulação de cenários do processo produtivo e comparado à regra ATC. Os resultados obtidos evidenciam a robustez do método ATCE, atendendo as necessidades produtivas e reduzindo a alocação sucessiva de tarefas de mesma complexidade a uma mesma equipe. / This dissertation presents new scheduling heuristics integrated with learning curves and human factors aimed at job scheduling in unrelated parallel workers teams. The objective is to modify heuristics available in the literature to integrate ergonomic aspects that have a profound impact on human performance, without harming demands of the productive process. Two methods that combine learning curves, heuristics for scheduling and ergonomic factors are proposed and applied in the shoe manufacturing industry. The first method aims to optimized the objective function of minimizing the total weighted earliness and tardiness with a common due date for all jobs. The second method propose the ATCE rule (Apparent Tardiness Cost with Ergonomic Factors) which reduces the total weighted tardiness with different due date. The ATCE rule is then evaluated through simulation scenarios of production process and compared to the original rule (ATC), where the results shows the robustness of the method, attending the production needs with a significant improvement in the ergonomic point of view.
|
93 |
Uso do planejamento e programação da produção para maximização do resultado econômico em empresas de manufatura / Use of planning and scheduling for maximizing the economic operational profit in manufacturing companiesRomanzini, Fernanda January 2013 (has links)
O planejamento de produção é um elemento essencial para as empresas, pois permite definir os volumes a serem produzidos, conforme a estimativa de demanda e a capacidade produtiva disponível. Este trabalho contribui para o planejamento da produção, integrando variáveis e parâmetros que podem ajudar na maximização do resultado econômico das organizações. Esta dissertação apresenta três objetivos principais relacionados a esse tema: (i) identificar os problemas e as variáveis que precisam ser analisadas no desenvolvimento de métodos que se adéquam às necessidades das áreas envolvidas; (ii) desenvolver algoritmo para integrar as variáveis identificadas e os dados empresariais, de forma a viabilizar a aplicação do modelo, baseado em programação matemática e distribuições de probabilidade; (iii) aplicar os modelos propostos, a fim de avaliar sua utilidade e discutir os resultados obtidos. O estudo realizado revela a importância do uso de métodos formais de planejamento da produção integrados à definição do preço do produto. A definição de preços ou volumes de produção diferente dos valores ótimos pode afetar substancialmente o lucro global do sistema produtivo. / Production planning is an essential tool for companies, since it establishes the volumes to be produced, according to estimated demand and available production capacity. This work contributes with production planning field by integrating variables and parameters that impact the economic results of the organizations. This study presents three main objectives: (i) identification of issues and variables that need to be analyzed to develop methods suited to the needs of the areas involved, (ii) development of algorithms to integrate the identified variables and business data, in order to enable the application of the model, based on mathematical programming and probability distributions, (iii) application of the proposed models to evaluate their usefulness and discuss results. The study reveals the importance of using production planning formal methods that integrate products’ prices. The establishment of prices or production volumes different from optimum values may substantially affect production system global profit.
|
94 |
Método para projeto e planejamento de sistemas de produção na construção civil com uso da modelagem BIM 4D / Method for design and planning of production systems in construction using 4D BIM modelingBiotto, Clarissa Notariano January 2012 (has links)
As atividades de projeto e planejamento de sistemas de produção na indústria da construção civil tendem a ser mais complexas em relação à manufatura pelo fato de que o produto (edificação) é fixo no espaço enquanto os recursos transformadores movimentam-se. Além disso, à medida que o empreendimento vai sendo construído, o leiaute é alterado, contribuindo para aumentar a complexidade destas atividades. O presente trabalho propõe o uso de modelagem 4D para a visualização espacial e temporal de empreendimentos de construção, pela introdução de BIM (Building Information Modelling) no projeto e planejamento de sistemas de produção. Em geral, os estudos prévios sobre modelagem 4D com o uso de BIM tiveram como foco decisões de planejamento de forma isolada, limitadas a processos construtivos específicos. Entretanto, pouco tem sido investigado sobre a implementação de modelos BIM 4D no projeto e na gestão de sistemas de produção no contexto organizacional de empresas de construção. Desta forma, este trabalho teve como objetivo desenvolver um método para o projeto e planejamento de sistemas de produção em empreendimentos de construção, com uso da modelagem BIM 4D. Esta pesquisa enquadra-se no modo de produção de conhecimento denominado de pesquisa construtiva (constructive research), que consiste em produzir construções inovadoras, com intenção de resolver problemas encontrados no mundo real, assim como contribuir com avanços teóricos sobre o tema em estudo. A pesquisa foi divida em quatro etapas: revisão bibliográfica, fase exploratória, fase de desenvolvimento e fase de consolidação. As principais contribuições do trabalho são o próprio método proposto, uma discussão sobre os possíveis papéis da modelagem BIM 4D na tomada de decisão do projeto e planejamento de sistemas produção, e a identificação das principais dificuldades para a sua implementação. / The activities of designing and planning production systems in construction tend to be more complex than in manufacturing due to the fact that the product (building) is stationary, while the transforming resources move around. Moreover, as the project is being built, the site layout changes over time, contributing to increase the complexity of those activities. This research work proposes the use of 4D models for spatial and temporal visualization of construction projects, by introducing BIM (Building Information Modeling) in the design and planning of production systems. In general, previous studies on the use of BIM for 4D modeling in construction have focused on isolated planning decisions, limited to specific construction processes. However, not much research has been made on the implementation of BIM 4D models in the design and planning of production systems in the organizational context of construction companies. Therefore, the aim of this research study is to devise a method for designing and planning production systems in construction projects, with the use of BIM 4D modeling. This research fits into the mode of knowledge production named constructive research which consists of producing innovative constructions, intended to solve problems found in the real world, as well as to contribute to theoretical developments in the theme being investigated. The study was divided into four stages: literature review, exploratory phase, development phase, and consolidation phase. The main contributions of the investigation are the proposed method, a discussion on the possible roles of BIM 4D in the decision making process involved in the design and planning of production systems, and the identification of the main difficulties in terms of implementation.
|
95 |
Custos de produção e previsão da demanda : uma abordagem voltada ao planejamento e controle da capacidade produtivaAlmeida, Rodrigo Pessotto January 2014 (has links)
Diante do elevado nível de competição presente no cenário atual, torna-se indispensável a adoção de medidas de gestão capazes de priorizar e dirigir esforços na busca pela excelência no desempenho operacional das empresas. Assim, o objetivo deste trabalho é propor uma abordagem baseada em custos de produção e previsão de demanda voltada ao planejamento e controle da capacidade produtiva. Inicialmente, realizou-se o mapeamento dos artigos publicados em dezenove periódicos no período de 2002 a 2013, visando identificar abordagens relacionadas ao tema custos de produção e o processo de previsão de demanda. Com a finalidade de otimizar o planejamento da capacidade produtiva disponível, uma modelagem matemática, que utiliza o algoritmo generalized reduced gradient (GRG) não linear, é proposta. Por fim, é apresentado um modelo para o controle do desempenho operacional do sistema produtivo, fundamentado na avaliação de custos e no planejamento da capacidade de produção. Para avaliar a eficácia do modelo proposto, este foi aplicado em uma empresa de manufatura de materiais plásticos para a construção civil, em um sistema com múltiplos produtos e múltiplas máquinas. / Given the high level of competition present in the current environment, it is essential to adopt management measures in order to prioritize and direct efforts in the search for excellence in the company operational performance. Therefore, the objective of this study is to propose an approach based on production costs and demand forecasting focused on production capacity planning and control. A mapping of the articles published in nineteen journals, during the period of 2002 to 2013, was conducted to identify the different approaches related to production costs and demand forecasting. A mathematical modeling is proposed with the objective of optimizing the capacity planning using the nonlinear algorithm generalized reduced gradient (GRG). This study presented a model for controlling operational performance of the production system based on the evaluation of production costs and capacity planning. To evaluate the efficacy the model was applied to a manufacturing company of plastic materials for the construction, in a system with multi-products and multi-machines.
|
96 |
Gestão integrada entre segurança e produção : aperfeiçoamentos em um modelo de planejamento e controleCambraia, Fabrício Borges January 2004 (has links)
O planejamento e controle da segurança (PCS) apresenta-se, freqüentemente, como um dos principais requisitos de normas regulamentadoras e sistemas de gestão da segurança. Contudo, algumas limitações em termos de concepção e implementação têm sido identificadas nestes planos. Na medida em que o PCS e o planejamento e controle da produção (PCP) são entendidos como processos de mesma natureza, integrar o processo de PCS ao processo de PCP pode contribuir para aumentar a eficácia e eficiência de ambos os processos. A partir deste pressuposto, foi desenvolvido um modelo de PCS integrado ao processo de PCP, por meio de estudos empíricos em obras industriais, nas quais existem exigências rigorosas do cliente final quanto à segurança. Em que pese os resultados satisfatórios alcançados inicialmente, identificou-se a necessidade de aperfeiçoamentos em seus elementos através da implementação em novos contextos de construção. Assim, este estudo propõe aperfeiçoamentos nas práticas e ferramentas do modelo de PCS, como também visa a melhor compreensão de seus princípios, através da realização de um estudo empírico em um novo contexto de construção. Para isto, foram desenvolvidos dois estudos seqüenciais em um empreendimento, cuja característica principal foi o pequeno grau de exigência em relação a segurança por parte do cliente final. No primeiro, foi realizado um estudo de caso exploratório, que teve um caráter de preparação para o segundo, no qual se adotou como estratégia de pesquisa a pesquisa-ação. Com o primeiro estudo, pode-se identificar o nível de utilização dos elementos do modelo na empresa estudada. Na etapa de pesquisa-ação implementou-se o modelo no novo contexto e novas práticas e ferramentas foram testadas. Uma vez que o planejamento da segurança ocorre segundo três níveis hierárquicos, os principais resultados dizem respeito a uma melhor compreensão das decisões tomadas em cada nível e, em particular, no desenvolvimento de uma sistemática para a realização de planos diários de segurança e definição de diretrizes para a realização de estudos formais do método de execução de processos considerados de alto risco. Os indicadores de avaliação de desempenho da segurança propostos pelo modelo foram aperfeiçoados, principalmente por intermédio de um maior envolvimentos dos trabalhadores no processo de coleta. Além disto, foi desenvolvida uma sistemática pró-ativa para avaliação de subempreiteiros com a participação dos mesmos durante as avaliações. / Safety planning and control (SPC) is frequently presented as one of the main requirements in regulatory norms and safety management systems. However, some of the limitations in terms of conception and implementation have been identified in these plans. When SPC and production planning and control (PPC) are understood as processes of the same nature, integrating SPC to PPC can contribute to enhancing the effectiveness and efficiency of both processes. From this supposition, a SPC model integrated to PPC was designed from empirical studies developed in industrial construction sites, in which the final client had strict safety demands. In spite of the satisfactory results obtained initially, the need for refinement in the model’s elements, through its implementation in new construction contexts, was identified. Therefore, this study proposes refinements in the SPC model’s practices and tools, as well as a better understanding of its principles, through the development of empirical studies in a new construction context. In this sense, two sequential studies were developed in a project, where the main characteristic was the final client’s small level of demand related to safety. In the first investigation, an exploratory case study was carried out and was a preparation for the second study, which adopted action research as its research strategy. With the first study, the level of use of the model’s elements in the investigated company was identified. In the action research phase, the model was implemented in a new context and new practices and tools were tested. Since safety planning is done in three hierarchical levels, the main results regard a better comprehension of the decisions made in each level and, specifically, in the development of a system for the fulfillment of daily safety plans and the definition of directives for the development of formal studies for carrying out processes considered of high risk. The safety performance evaluation indicators proposed by the model were refined, mainly through a more intense involvement of the workers in the data collection process. Moreover, a pro-active system was developed for the evaluation of subcontractors with their participation during the evaluation.
|
97 |
Beneficiamento de pedras preciosas no Vale do Taquari : diagnóstico e modelo para análise e redução de perdas nos processo produtivosCosta, Manfred January 2007 (has links)
O beneficiamento de pedras preciosas representa um importante potencial empresarial e de negócios para o Brasil, em especial para regiões como a do Vale do Taquari, no estado do Rio Grande do Sul. No entanto, as empresas deste setor, em sua maioria pequenas, carecem de uma abordagem capaz de melhorar seus processos produtivos, diminuindo suas perdas. Este estudo buscou levantar dados do setor na região, diagnosticar questões relativas aos processos produtivos, em especial sobre perdas nos processos, e propor um modelo para análise dos processos e redução das perdas nestes. O modelo foi gerado considerando dados gerais e históricos do setor, as análises dos questionários aplicados e os mapeamentos realizados. Este modelo está dividido em duas etapas: a de análise e a do conjunto de ações para a redução das perdas. Assim, o modelo propõe uma série de técnicas e ferramentas, geralmente ligadas ao Sistema Toyota de Produção, as quais têm colaborado com diferentes setores. A implementação do modelo proposto deve possibilitar um aumento no potencial de desenvolvimento, tanto no setor de beneficiamento como em toda a cadeia produtiva das pedras preciosas. / The processing of precious stones represents an important potential business in Brazil, especially for regions such as the Taquari Valley, in the state of Rio Grande do Sul. However, the companies in this sector, mostly small, lack an approach aimed at improving their production processes, reducing their losses. This study aimed at surveying data about the sector in that region, examining issues relating to production processes, in particular on losses in processes, as well as proposing a model for analysing these processes and reducing losses. The model was developed considering general and historical data in the precious stones sector, the analysis of the interviews and the mappings carried out. The model is divided into two steps: the first one is the analysis and the second one is the set of actions for reducing losses. Thus, the model proposes a series of techniques and tools, usually related to the Toyota Production System, which have cooperated with different sectors. The implementation of the proposed model shall enable an increase in the potential for development, both in the processing sector, as well as throughout the whole production chain of precious stones.
|
98 |
Contribuições para a coleta e a análise de indicadores de planejamento e controle da produção na construção civil / Contributions for data colection and analysis of indicators of production planning and control in constructionBortolazza, Rodrigo Cremonesi January 2006 (has links)
Nos últimos anos, muitas empresas de construção civil têm buscado melhorar seus sistemas de Planejamento e Controle da Produção (PCP) como uma das formas de melhorar o desempenho de empreendimentos em termos de prazo e custo, além dos constantes objetivos de aumentar a qualidade e a produtividade. Um marco importante no desenvolvimento de sistemas de PCP para esse setor foi a introdução do sistema Last Planner de controle da produção, concebido com base em modelos e teorias desenvolvidos para a Engenharia Industrial, a partir de meados da década de 90. Esse sistema tem sido refinado em diversos estudos ao redor do mundo, grande parte deles baseados em uma análise qualitativa dos dados gerados. De fato, as pesquisas relacionadas à implementação de sistemas de PCP desenvolvidas no Programa de Pós-graduação em Engenharia Civil da UFRGS nos últimos anos também foram fortemente baseadas no Last Planner. O objetivo geral dessa dissertação consiste em propor contribuições para a coleta e a análise de dados que permitam avaliar o impacto de sistemas de PCP no desempenho de empreendimentos de construção civil, assim como identificar algumas dificuldades de implementação. Foi criada uma base de dados com as medidas de desempenho coletadas em empresas, em pesquisas anteriores, e também com dados inseridos em um sistema de indicadores para benchmarking de empresas do setor. Foram realizadas diversas análises, principalmente dos indicadores PPC e causas do não cumprimento das tarefas, utilizando a análise de regressão múltipla. Entre as principais conclusões, o estudo apontou formas de melhorar a coleta de dados, incluindo a utilização de mecanismos pró-ativos para evitar o acúmulo de valores faltantes e dados espúrios. Além disso, sugeriu-se a formação de um banco de dados único para cada empresa para possibilitar o melhor aproveitamento dos dados, uma vez que algumas medidas são coletadas e acabam descartadas sem uma análise aprofundada. Quanto às dificuldades de implementação do PCP, destacaram-se as falhas na análise das causas do não cumprimento dos pacotes de trabalho na etapa de curto prazo e a implementação parcial do planejamento de médio prazo, devido à desconsideração da análise sistemática de restrições. / In recent years, several construction companies have attempted to improve their production planning and control systems in order to improve project performance in terms of time and costs, besides increasing quality and productivity. An important reference in the development of production planning and control systems in this sector has been the introduction of the Last Planner System, conceived from models and theories developed in industrial engineering, since the mid Nineties. This system has been refined in several research studies around the world, most of them based on a qualitative data analysis. In fact, the research studies concerned with production planning and control carried out at the Postgraduate Program in Civil Engineering at UFRGS is recent years have been strongly based on the Last Planner System. The main objective of this dissertation is to make contributions for data collection and analysis for assessing the impact of production planning and control systems in the performance of construction projects, as well as identify some implementation difficulties. A database was built with some measures collected in construction projects in previous research studies, as well as with data from a performance measurement system for benchmarking in this sector. Several analyses were carried out in this data base, mostly based on two measures, the percentage of plan completed (PPC) and the causes for the non completion of work packages, using multivariate regression analysis. Among the main conclusions, this study pointed out ways of improving data collection, including the use of pro-active mechanisms for avoiding the growth of missing values and outliers. Furthermore, it suggests the construction of a single database in each company, enabling the proper use of the data available, since some of the measures are collected but are further discarded without an in-depth analysis. Regarding the difficulties in the implementation of production planning and control, some failures during the analysis of the causes for the non-completion of work packages in short term planning and the incomplete implementation of look-ahead planning, due to the ineffectiveness of constraints analysis, were pointed out.
|
99 |
Avaliação do impacto do Sistema Last Planner no desempenho de empreendimentos da construção civilMoura, Camile Borges January 2008 (has links)
Diversos esforços têm sido dirigidos à melhoria do setor da construção civil no mundo inteiro, podendo ser destacado como um dos principais focos o processo de planejamento e controle da produção (PCP). Este processo tem grande impacto no desempenho dos empreendimentos de construção, em relação aos seus custos, prazos, qualidade e segurança. Uma das principais iniciativas realizadas para a melhoria do PCP foi o desenvolvimento e disseminação do Sistema Last Planner de Controle da Produção (LPS). Esse sistema vem sendo aplicado em diversos países desde meados da década de 1990. O principal indicador do LPS é o Percentual de Planos Concluídos (PPC), que mede a eficácia do planejamento. Contrastando com o elevado número de estudos qualitativos realizados sobre a implementação do LPS, poucas análises quantitativas foram realizadas sobre o impacto de sua implementação e os fatores que afetam a sua eficácia. A partir da construção de uma grande base de dados de empreendimentos, o presente trabalho buscou avaliar o impacto da eficácia de sistemas de PCP, baseados no LPS, no desempenho de empreendimentos da construção civil quanto ao custo e ao prazo. Buscou avaliar também influência de práticas de gestão da produção na construção civil na eficácia destes sistemas de PCP. A base de dados utilizada contém indicadores de PPC, desvio de custo, desvio de prazo, boas práticas de PCP e boas práticas de canteiros de obras. Através da técnica de regressão múltipla foram realizadas diversas análises. Como principais conclusões apontam-se algumas evidências sobre a forma como o PCP influencia o desempenho dos empreendimentos e a importância das boas práticas de PCP e de canteiros de obras na eficácia do planejamento. Apesar de as análises apresentarem níveis de correlação relativamente baixos, devido a algumas limitações dos dados disponíveis, observou-se uma forte consistência nos modelos de regressão desenvolvidos. / Several efforts for improving the construction sector have been made worldwide, and one of the main focus has been the production planning and control process This process has a large impact on the performance of construction projects, in terms of cost, time, quality and safety. One of the main initiatives for improving the planning and control process has been the development and dissemination of the Last Planner System of Production Control (LPS). This system has been used in many different countries since the mid Nineties. The main performance indicator of the LPS is the Percentage of Plans Completed (PPC), which measures planning effectiveness. In contrast with the large number of qualitative studies on the implementation of LPS, very few quantitative analyses have been undertaken on the impact of its implementation and on the factors that affect its effectiveness. Based on the construction of a large project database, this research study aims to assess the impact of LPS based production planning and control systems on the performance of construction projects in terms of cost and time. This investigation has also analysed the impact of a set of production management practices on the effectiveness of those planning systems. The database contains the following indicators: PPC, cost deviation, time deviation, good production planning and control practices, and good site management practices. Several analyses were carried out using regression analysis techniques. As main conclusions, the study provided some evidences on the way production planning and control influences project performance, and the importance of good production planning and control practices, and site management practices on the effectiveness of planning and control. Despite the fact that some of the analyses indicated a fairly low correlation index, due to some limitations on the data available, the regression models produced were very consistent.
|
100 |
Projeto de sistemas de produção na construção civil utilizando simulação computacional como ferramenta de apoio à tomada de decisãoSchramm, Fábio Kellermann January 2009 (has links)
Embora comum na indústria, o Projeto do Sistema de Produção (PSP) ainda é pouco realizado na construção civil. Estudos anteriores apontaram para a necessidade de empregar ferramentas capazes de modelar e avaliar os efeitos da interdependência, da complexidade e da variabilidade no desempenho dos sistemas de produção na construção, como a simulação computacional, ainda é pouco usada na construção civil. Desta forma, este trabalho teve como objetivo geral propor um modelo para a elaboração do Projeto do Sistema de Produção de empreendimentos da construção civil a partir da utilização da simulação computacional como ferramenta de apoio à tomada de decisão, tendo como ponto de partida o modelo anteriormente desenvolvido. Como estratégia de pesquisa optou-se pela pesquisa construtiva, caracterizada pela implementação de construções inovadoras para a solução de um problema com relevância prática, através do aprendizado baseado na experimentação e na reflexão teórica. A partir de uma revisão de literatura, este trabalho foi dividido em três fases. A fase exploratória consistiu da análise e seleção do software de simulação e de um estudo exploratório. A fase de desenvolvimento consistiu na realização de quatro estudos de caso nos quais avaliou-se o emprego da simulação no PSP. Na fase de análise e reflexão, discutiu-se quatro funções básicas do PSP: promover discussões e questionamentos; incentivar a adoção de uma visão sistêmica; sistematizar, formalizar e registrar decisões; e estabelecer um estado futuro a ser alcançado. Quanto à simulação, seu emprego permitiu o teste de diferentes cenários relacionados a mudanças na estratégia de ataque do empreendimento, ao dimensionamento da capacidade dos recursos de produção entre outros. Propôs-se, ainda, a estratégia de reutilização de modelos como forma de reduzir o tempo de desenvolvimento dos estudos. O modelo proposto, que tem seu escopo limitado a decisões de caráter operacional, divide o PSP em duas fases que não são estanques, devendo sobrepor-se: a fase estática, baseada no modelo anterior de elaboração do PSP; e a fase dinâmica, na qual são desenvolvidos os modelos de simulação e testados cenários para apoiar a tomada de decisão. / Though common in industry, the Production System Design (PSD) is still seldom used by the construction sector. Previous studies have pointed to the need to use tools to model and evaluate the effects of interdependence, complexity and variability in production system performance, such as computer simulation. Thus, this study aimed to propose a model for designing production systems of construction projects based on the use of simulation as a tool to support decision-making, whose starting point is a previously developed model. The constructive research approach is characterized by implementing innovative constructions to solve a specific and practically relevant problem through learning based on experimentation and theoretical reflection. Based on literature review, this study was divided into three phases. The exploratory phase consisted of the analysis and selection of simulation software and an exploratory study. The development phase consisted of four case studies in which the use of simulation in the PSD was evaluated. At the analysis and reflection phase four basic functions of the PSD were discussed: promoting discussion and questions; encouraging the adoption of a systemic view; formalizing and recording decisions; and establishing a state to be reached. The use of simulation allowed the testing of different scenarios related to project installment strategy changes and in the capacity planning of production resource planning capacity among others. A strategy for reusing models was also proposed in order to reduce the development time of the studies. The proposed PSD model, which has its scope limited to decisions of operational nature, is made up of two overlapping phases: the stochastic phase, based on the previously proposed PSD model, and the dynamic phase, in which simulation models are developed and scenarios are tested to support decision-making.
|
Page generated in 0.1044 seconds