• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 197
  • 3
  • Tagged with
  • 201
  • 201
  • 201
  • 90
  • 89
  • 85
  • 72
  • 67
  • 40
  • 37
  • 29
  • 25
  • 25
  • 21
  • 19
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
151

Comparação de modelos MLP/RNA e modelos Box-Jenkins em séries temporais não lineares

Flores, João Henrique Ferreira January 2009 (has links)
A capacidade de prever resultados futuros, ao se analisar uma série de dados, é uma importante ferramenta para o planejamento de qualquer empresa ou indústria. Porém, a literatura oferece muitas opções de ferramentas e modelos estatísticos que permitem obter estas previsões. Cada qual com suas características e recomendações. Dentre estes modelos, destacam-se os modelos de Box e Jenkins, e os modelos de Redes Neurais Artificiais (RNA) - com destaque aos modelos de perceptron de múltiplas camadas (MLP). Estas duas diferentes abordagens são comparadas nesta dissertação com relação a sua capacidade de obter previsões acuradas em séries de dados não lineares quanto a sua média. As abordagens foram comparadas utilizando-se a série mensal do índice de produção física industrial do Estado do Rio Grande do Sul. Bem como a série anual de manchas solares, sendo a segunda utilizada como caso-controle para as comparações, devido ao fato de que as suas propriedades já foram amplamente estudadas. No estudo da série do índice de produção física mensal, os modelos de Box e Jenkins obtiveram melhor rendimento. Na série das manchas solares foram os modelos MLP que se destacaram. Desta forma, não é possível afirmar se alguma das abordagens é superior - tratando-se de séries de dados não lineares quanto a sua média. / The capacity to preview future outcomes on the time series analysis is an important tool for any business and industry planning. However, the literature offers many options on statistical tools and models which allow to obtain these forecasts. Each one with their features and recommendations. 1n these models, the Box and Jenkins and Artificial Neural Networks (ANN) models, with the multilayer perceptron (MLP) highlighted, stand out. These two different approaches are compared in this thesis related to the capacity to obtain accurate forecasts in mean related non-linear time series analysis. These approaches were compared using the monthly physical production index of Rio Grande do Sul time series and the sunspot series, being the second one used as a case-control to the comparisons, due the fact of its properties are already widely studied. 1n the monthly physical production index series study, t,he Box and Jenkins models obtained better efficiency. 1n the sunspot series, the MLP models were highlighted. So, it isn't possible to affirm if any of the approaches is superior, in the case of mean related non-linear time series.
152

Integrated production planning and control model for engineer-to-order prefabricated building systems

Viana, Daniela Dietz January 2015 (has links)
A industrialização da construção civil é uma das possíveis estratégias adotadas para melhorar a qualidade e produtividade da produção neste ambiente altamente competitivo. Entretanto para uma melhoria na eficiência da produção, a simples implantação de uma tecnologia industrializada não é o suficiente. Existe a necessidade de melhorar os sistemas de gestão como um todo. O sucesso da implementação de sistemas de planejamento como o Last Planner, desenvolvidos especialmente para a construção civil, instiga o desenvolvimento de estudos em diferentes processos produtivos. Em relação à implementação de princípios da produção enxuta, o sistema é apontado como um ponto de partida para uma empresa atingir uma estabilidade básica. Este estudo foca-se em um tipo específico de sistema de produção industrializadas chamado engineer-to-order (ETO), quando a requisição de produto pelo cliente é realizada na fase de projeto. Neste tipo de sistema construtivo há uma necessidade de integrar a fabricação das peças conforme as necessidades do canteiro de obras. Esta pesquisa visa a desenvolver um modelo integrado de planejamento e controle da produção de sistemas ETO pré-fabricados para construção civil, integrando o projeto, manufatura e montagem em obra. A pesquisa faz parte de uma parceria da Universidade Federal do Rio Grande do Sul com uma empresa de fabricação e montagem de estrutura (Empresa A) metálica interessada em melhorar seus processos de planejamento e controle da produção. O método de pesquisa é baseado na pesquisa construtiva, ou design science, em que há um esforço do pesquisador em produzir um artefato como resultado da pesquisa, que neste caso, é um modelo de planejamento e controle da produção. O processo de implementação de mudanças da empresa adotou a estratégia da pesquisa-ação, de forma que as soluções eram coletivamente acordadas com as pessoas responsáveis pela sua utilização, para garantir que a mesma se efetivasse nos procedimentos da empresa. Neste tipo de estratégia procura-se estabelecer ciclos de aprendizagem ao longo da pesquisa, em que as soluções são continuamente avaliadas e adaptadas para melhoria dos processos em análise. Os resultados da empresa A foram divididos em quatro fases de implementação. Na primeira fase houve um esforço em consolidar uma integração nos planos de curto prazo. Na segunda fase o foco foi no sistema como um todo, promovendo mecanismos para coletar informações sobre o andamento das obras para retroalimentar a fábrica. As barreiras enfrentadas para garantir esta retroalimentação demonstraram a necessidade da utilização de outros métodos. Por isso, a terceira fase se concentrou no desenvolvimento de ferramentas de gestão visual para melhorar os processos analisados nas fases anteriores. A quarta fase do estudo foi baseada no estudo dos processos logísticos da empresa, visto que representam a interface entre fábrica e obra. Terminado o estudo na empresa A dois estudos foram conduzidos no exterior para compreender contextos distintos de sistemas de produção ETO. O primeiro (empresa B) responsável pelo sistema de climatização da edificação. A empresa realiza o projeto, fabricação e instalação dos sistemas de dutos em metal laminado, assim como o maquinário necessário para as trocas de ar. O estudo foi baseado no fornecimento do sistema para uma obra específica. Neste estudo foram desenvolvidas ferramentas de planejamento para facilitar a sincronização entre fabricação e instalação do material em obra. O segundo estudo (empresa C) foi realizado em uma empresa de estrutura metálica que desenvolveu uma conexão inovadora, facilitando seus processos produtivos. Este estudo teve caráter descritivo, analisando como a sua tecnologia facilitou o sistema de planejamento e controle da produção. A partir dos resultados obtidos nos estudos foi possível desenvolver o modelo final de planejamento e controle da produção para sistemas ETO de pré-fabricados. A maioria dos processos propostos neste modelo foi testada na empresa A. Embora a empresa estudada ainda necessite implantar algumas melhorias no seu sistema de planejamento e controle para se adequar ao modelo proposto, as mudanças realizadas trouxeram benefícios na comunicação e sistematização das informações entre os diferentes níveis de planejamento e controle. As contribuições teóricas do trabalho foram um modelo conceitual para compreender a complexidade neste tipo de sistema de produção; a identificação dos principais requisitos para desenvolver sistemas de planejamento e controle da produção para este ambiente; e a adaptação do conceito de WIP utilizando o status dos produtos. / The industrialization of construction work is one of the ways it is possible to achieve better quality and productivity in this competitive environment. However, in order to improve efficiency using industrialized technologies is not enough. There is a need to improve planning and control systems. Although the Last Planner System has been developed for the construction environment, since it was devised the successful results promoted its implementation in different production environments. Regarding lean production implementations, the system has been pointed out as a starting point for a company to achieve the basic stability. This study is focused in one type of industrialized production system: the engineer-to-order. By industrialized, it is the prefabrication that has been addressed. In these kinds of production systems, there is a need to integrate the prefabrication plant with the construction site needs. This research project aims to develop an integrated planning and control production planning and control model for ETO prefabricated systems, integrating design, manufacturing and site assembly. The research is part of a partnership with a steel fabricator company (Company A) that was interested in improving its production planning system. The research method is grounded in the design science research, in which there is an effort from the researcher to develop an artefact as an output of the research process, in this case, a planning and control model. The implementation adopted some strategies from the action-research, so some solutions needed to be collectively constructed between the researcher and the practitioners, in order to have an effective use in the organization. Following this strategy, it is possible to have same learning cycles during the implementation of the solutions, which are continually assessed and adapted in order to improve the processes analysed. The results are divided into four phases of implementation. In the first step the main effort was in consolidating an integrated planning and control process for the short-term in the production units. In the second step the focus was the overall system, mainly providing mechanisms to collect the status of all construction sites for the plant. The barriers to improve this feedback process brought to light the need for using visual management tools. This development concerned the third step of implementation, further improving the changes made in the previous phases. The fourth step was based on the analysis of the logistics processes, as the interface between the plant and site assembly. After the main empirical study on Company A, two studies were carried out abroad in order to understand a different context of ETO production systems. The first concerns a mechanical contractor situated in a high complex project. In this study, it was possible to develop some planning tools to facilitate the analysis between the fabrication and site installation of the products. The second concerns a steel fabricator focused on the structural system. This was a descriptive study that analysed the differentiation of the products provided by this company and the impact of it in the planning and control system. Based on the results obtained in the implementation process, the integrated planning and control model for ETO building systems was devised. Most of the processes proposed in the model were assessed in Company A. Although there is still a need to improve the production planning and control system of that company, the implementation enhanced the communication between the operational and tactics level and also promoted a systematic way to collect information for each level of the production planning and control system. The theoretical contributions of the research were the development of a framework to understand the complexity of this kind of production system; the identification of the main requirements for developing a planning and control system for this environment; and the adaptation of the concept of WIP using the status of the product.
153

Diretrizes para integração dos fornecedores estratégicos ao sistema de PCP de empresas construtoras / Guidelines for integrating strategic supply chain members in production planning and control

Sterzi, Marcus Pereira January 2006 (has links)
Nos últimos anos, vários estudos têm sido realizados para aprimorar o gerenciamento das cadeias de suprimentos na construção civil. Estes estudos revelaram que o gerenciamento e integração dos agentes da cadeia possibilitam reduzir riscos individuais e o aumentar a eficiência no processo de produção, eliminando desperdícios e esforços desnecessários por parte destes agentes. Desta forma, a excelência no gerenciamento destas cadeias representa um caminho para obter vantagem competitiva neste mercado. Entretanto, a indústria da construção civil move-se lentamente na aplicação dos conceitos de Gestão da Cadeia de Suprimentos (GCS), particularmente, devido às peculiaridades desta indústria. Em muitos empreendimentos de construção é observada a falta de integração dos processos e operações entre os agentes da cadeia, sendo uma das principais causas da baixa produtividade. Pesquisas anteriores também indicam o potencial do sistema Last Planner na função de integração das empresas envolvidas no empreendimento de construção e no gerenciamento de suas interfaces. Portanto, este trabalho de pesquisa propõe um conjunto de diretrizes para integrar os fornecedores estratégicos ao sistema de Planejamento e Controle da Produção (PCP), baseado no sistema Last Planner, assim como compreender os principais problemas relacionados a falta de integração entre a empresa construtora e estes agentes. Este estudo incorpora a aplicação de conceitos da GCS, utilizados para o gerenciamento e integração da cadeia, e a aplicação de um sistema de PCP baseado no sistema Last Planner. Foram realizados três estudos de caso em empreendimentos de construção visando a explorar mecanismos de integração e propor critérios para avaliar o nível de integração dos agentes. Este trabalho sugere uma sistemática para identificar os fornecedores estratégicos de um empreendimento, gerenciar suas atividades através do sistema de PCP e avaliar o nível de integração dos mesmos, utilizando um conjunto de práticas específicas relacionadas ao sistema de gestão da produção da empresa. / In recent years, there have been several research efforts on how to improve the management of construction supply chains. The management of those supply chains and the integration among participants can potentially reduce individual risks and improve the efficiency of the production process as a whole, eliminating waste and unnecessary efforts. Achieving excellence in the management of construction supply chains represents a way of increasing competitive advantage in the market. However, the construction sector has moved slowly towards the application of Supply Chain Management (SCM), partly due to the peculiarities of this industrial context. In many construction projects, there is a lack of integration of the construction company and its suppliers. Previous research indicates that the Last Planner System can play a key role in the integration of construction companies and their suppliers in the management of construction projects. This research proposes that this should be achieved by involving some strategic suppliers in the implementation of the lean principles and techniques that are encrypted in the Last Planner system. This research study aims to devise a set of guidelines to integrate supply chain management functions through the production planning and control system as well as using it for understanding the main problems related to the lack of integration of construction supply chains. This strategy incorporates the application of a conceptual framework for SCM for inter-firm integration and management, and the application of a production planning and control model that is based on the Last Planner System for production control. Three case studies were carried out in construction projects aiming to explore mechanisms to support integration efforts, and propose criteria for assessing the level of integration between supply chain members. This research work suggests procedures to identify strategic project supply chain members, manage them using the Last Planner System, and assess their degree of integration by using a set of practices related to the production management system of the construction company.
154

Diretrizes para o planejamento e controle da produção em obras de sistemas construtivos metálicos

Fabro, Fabiana January 2012 (has links)
No setor da construção civil, tem ocorrido um aumento na utilização de sistemas industrializados, dentre eles sistemas construtivos metálicos, visto que o uso desses sistemas contribui para o aumento da velocidade de execução dos empreendimentos e para a redução de desperdícios. Esta mudança tem criado oportunidades para a aplicação de conceitos e métodos de gestão da produção, desenvolvidos em outras indústrias, tais como a Filosofia da Produção Enxuta, que tem trazido muitos benefícios ao setor da construção, tais como redução de desperdícios, aumento da produtividade e da confiabilidade nos prazos de entrega. Entretanto, há poucas pesquisas sobre a utilização de conceitos da produção enxuta no processo de PCP de obras de empresas que fornecem sistemas construtivos metálicos. O presente trabalho tem como objetivo geral propor diretrizes para a concepção e implementação de sistemas de Planejamento e Controle de Produção em obras de empresas que projetam, fabricam e montam sistemas construtivos metálicos. São também propostas adaptações no Sistema Last Planner ao contexto de montagem deste tipo de sistema. A estratégia de pesquisa adotada foi a pesquisa-ação, sendo desenvolvidos cinco estudos empíricos em obras de uma empresa líder neste setor. O trabalho iniciou pela realização de um diagnóstico relativo aos fluxos de materiais e informações entre os principais setores da empresa, assim como análise do processo de planejamento e controle existente no processo de montagem. Na sequência, foram definidas e implementadas melhorias no processo de PCP em três obras da empresa. Os principais resultados obtidos pela pesquisa estão relacionados à necessidade de ampliação do escopo do projeto do sistema de produção, à adaptação dos níveis de planejamento de médio e curto prazo do Sistema Last Planner para este contexto, assim como à necessidade de integração do planejamento e controle do processo de montagem a outros processos à montante da obra. São também propostos diferentes tipos de sistemas de planejamento e controle da produção, em função da complexidade e do tamanho da obra. / In the construction sector, there has been an increase on the use of industrialized building systems, including steel construction systems, due to the contribution of those systems in terms of reducing the duration of projects, and reduction of waste. This change has created opportunities for the application of production management concepts and methods that have been originated in other industries, such as the Lean Production Philosophy, which has brought several benefits for the construction sector, such as waste reduction, increase in productivity and reliability in delivery time. However, there have been only a few research studies on the application of Lean Production concepts on the production planning and control process of companies involved in the delivery of steel construction systems. The aim of this research work is to propose guidelines for the conception and implementation of production planning and control systems for projects delivered by companies that design, manufacture and assemble steel construction systems. Moreover, some adaptations in the Last Planner Systems are proposed for the context of assembling this type of system. Action research was the research strategy adopted in this investigation, which involved the development of five empirical studies in projects carried out by a Brazilian leading company. This investigation started by carrying out an analysis of the material and information flows among the main departments of the company, as well as by assessing the existing planning and control process for site assembly. Then, a set of improvements in that process were devised and implemented in three construction sites of the company. The main results of this research work are concerned with extending the scope of production system design, adapting the medium and short-term planning levels of the Last Planner System to this context, and integrating the planning and control process for site assembly with upstream processes. Moreover, different types of planning and control systems were proposed for different types of projects, according to their complexity and size.
155

Comparação de modelos MLP/RNA e modelos Box-Jenkins em séries temporais não lineares

Flores, João Henrique Ferreira January 2009 (has links)
A capacidade de prever resultados futuros, ao se analisar uma série de dados, é uma importante ferramenta para o planejamento de qualquer empresa ou indústria. Porém, a literatura oferece muitas opções de ferramentas e modelos estatísticos que permitem obter estas previsões. Cada qual com suas características e recomendações. Dentre estes modelos, destacam-se os modelos de Box e Jenkins, e os modelos de Redes Neurais Artificiais (RNA) - com destaque aos modelos de perceptron de múltiplas camadas (MLP). Estas duas diferentes abordagens são comparadas nesta dissertação com relação a sua capacidade de obter previsões acuradas em séries de dados não lineares quanto a sua média. As abordagens foram comparadas utilizando-se a série mensal do índice de produção física industrial do Estado do Rio Grande do Sul. Bem como a série anual de manchas solares, sendo a segunda utilizada como caso-controle para as comparações, devido ao fato de que as suas propriedades já foram amplamente estudadas. No estudo da série do índice de produção física mensal, os modelos de Box e Jenkins obtiveram melhor rendimento. Na série das manchas solares foram os modelos MLP que se destacaram. Desta forma, não é possível afirmar se alguma das abordagens é superior - tratando-se de séries de dados não lineares quanto a sua média. / The capacity to preview future outcomes on the time series analysis is an important tool for any business and industry planning. However, the literature offers many options on statistical tools and models which allow to obtain these forecasts. Each one with their features and recommendations. 1n these models, the Box and Jenkins and Artificial Neural Networks (ANN) models, with the multilayer perceptron (MLP) highlighted, stand out. These two different approaches are compared in this thesis related to the capacity to obtain accurate forecasts in mean related non-linear time series analysis. These approaches were compared using the monthly physical production index of Rio Grande do Sul time series and the sunspot series, being the second one used as a case-control to the comparisons, due the fact of its properties are already widely studied. 1n the monthly physical production index series study, t,he Box and Jenkins models obtained better efficiency. 1n the sunspot series, the MLP models were highlighted. So, it isn't possible to affirm if any of the approaches is superior, in the case of mean related non-linear time series.
156

Um avaliador de cenários simulados para reseqüenciamento da produção em sistemas automatizados de manufatura usando lógica nebulosa.

Fernandes, Marcelo Climaites 20 August 2004 (has links)
Made available in DSpace on 2016-06-02T19:05:33Z (GMT). No. of bitstreams: 1 DissMCF.pdf: 2219656 bytes, checksum: f83a921d0c03343b903f3ee4976cb75e (MD5) Previous issue date: 2004-08-20 / In the search for competitive advantages, companies of the manufacture industry segment have been investing in the production flexibility and processes automation, looking for assisting a variety of types of products, following a demand for products and with few manual interventions. In this context, tasks like manufacture integration and production planning and management become more complex. The search for solutions in these tasks should always take into account the desired performance of the productive system, in relation to a series of factors like the attendance of delivery dates. Among the planning tasks, the present proposal is to help the production sequencing. This sequencing can be accomplished in several ways as, for instance, using priority rules. Discrete event systems simulation can be used to test different acceptable sequences of production evaluating the conditions or scenarios. However the simulation typically takes long time, not only to run the models but also for the analysis of the obtained data. To deal with the sequencing task due to situations that happen in moments not determined, the time to analyze or define a new arrangement is a very important factor and needs to be short. This proposal presents a system using fuzzy logic, for the evaluation of data obtained from the simulation of scenarios, considering shop floor conditions, to the production sequencing, in order to take a lower time for the evaluation task. / Na busca por vantagens competitivas, empresas do setor de manufatura têm investido na flexibilidade de produção e automação de processos, procurando atender a uma variedade de tipos de produtos, seguindo a demanda por produtos e com baixa intervenção manual. Neste ambiente, tarefas de integração da manufatura, planejamento e gerenciamento da produção, entre outras, tornam-se cada vez mais complexas. A busca por soluções nestas tarefas deve sempre levar em consideração o desempenho desejado do sistema produtivo, em relação a uma série de fatores como, por exemplo, o atendimento de prazos de entrega. Dentre as tarefas de planejamento, a presente proposta atua no seqüenciamento da produção. Este seqüenciamento pode ser realizado de diversas maneiras como, por exemplo, pelo uso de regras de prioridade, visando uma expectativa de resultados. Fazendo-se o uso de simulação de sistemas de eventos discretos, é possível testar diferentes seqüências admissíveis de produção, avaliando-se o desempenho para cada condição ou cenário. Entretanto o uso de simulação tipicamente necessita um tempo relativamente alto, não somente para as chamadas corridas de simulação mas também pelo tempo necessário para análise dos dados obtidos. Para tratar o seqüenciamento diante de situações que ocorrem em momentos não prédeterminados, o tempo de resposta na análise ou de definição de um novo arranjo é um fator muito importante e necessita ser relativamente baixo. Esta proposta apresenta um sistema computacional usando lógica nebulosa, para avaliação de dados obtidos na simulação de cenários representativos de condições de chão de fábrica, para o re-seqüenciamento da produção, buscando reduzir o tempo de avaliação.
157

Evolução e avaliação da utilização do sistema kanban e de suas adaptações : survey e estudos de caso.

Lage Junior, Muris 03 July 2007 (has links)
Made available in DSpace on 2016-06-02T19:51:30Z (GMT). No. of bitstreams: 1 DissMLJ.pdf: 1546763 bytes, checksum: 9aec795f18b91e098dac23f0bed8512b (MD5) Previous issue date: 2007-07-03 / Financiadora de Estudos e Projetos / This work departed from the finding that the changes occurred in the industrial competitive scenario are in conformity with the unfavorable conditions recognized for the use of the kanban system and that, due to this, the use of this well-known Systems for Coordination of Purchase and Production Orders (SCO) needs to be reviewed. Following, this research aims to evaluate the evolution of the utilization of the kanban system and study the adaptations made in its logic work to adjust it in face to the new conditions, and to evaluate the advantages and disadvantages of these adaptations. First of all, literature reviews regarding kanban system were made, and thirty three different adaptations were studied, classified and analyzed. It was found that, among other topics, the development of the adapted systems, in general, is in an initial stage, once the majority of the proposals are theoretical and might be considered to generate more appropriated practical forms. Afterwards, field research was realized, by means of a survey and case researches. In the survey, it was selected a non-probabilistic sample of thirty companies from São Paulo State that were implementing the kanban system in the beginning of the 90 s. It were identified 18 adaptations in practice in São Paulo State, however only 5 were analysed in the case studies. Among the 18 adaptations, 7 follow the logic of the original system and 11 do not. Thereby, it was proposed a procedure to evaluate the use of the kanban system in that industrial companies by means of the original work characteristics, production environment conditions and advantages of the system. The five adaptations analysed in the case studies have, as the main change, the utilization of only one type of signal or card. It was also concluded, by the use of the procedure, that the companies that use adaptations of the kanban system miss (in larger or smaller degree, depending on the adaptation) the following advantages: efficient production control; facility of problem causes identification; decrease of work in process; decrease of the lead-times; decrease of the waste; empowerment; simplicity of the administration mechanisms and efficient information control. / Este trabalho partiu da averiguação de que as mudanças recentes ocorridas no cenário competitivo industrial correspondem às condições reconhecidamente desfavoráveis ao uso do sistema kanban e que, devido a isso, o uso deste conhecido Sistema de Coordenação de Ordens de Produção e Compra (SCO) precisa ser revisto. Com isso, este trabalho tem como principais objetivos avaliar a evolução da utilização do sistema kanban e estudar as adaptações efetuadas em sua lógica de funcionamento para a adequação deste sistema frente às novas condições competitivas, bem como avaliar as vantagens e as desvantagens dessas adaptações. Inicialmente foram realizadas revisões bibliográficas sobre o sistema kanban, onde trinta e três adaptações diferentes foram identificadas, classificadas e analisadas. Constatou-se, dentre outros pontos, que o desenvolvimento dos sistemas adaptados no geral encontra-se numa fase inicial, uma vez que a maioria das propostas são apenas proposições teóricas que devem ser levadas em consideração para a geração de formas mais apropriadas à prática. Após isso, foram realizadas as pesquisas de campo, por meio de um survey e de estudos de caso. No survey utilizou-se uma amostra não-probabilística de trinta empresas do estado de São Paulo que estavam implantando o sistema kanban no início da década de noventa. Foram identificadas 18 adaptações na prática sendo utilizadas por empresas industriais no Estado de São Paulo, porém somente 5 foram analisadas à fundo nos estudos de caso. Das 18 adaptações 7 seguem a lógica de funcionamento do sistema kanban original e 11 não seguem. Em função dos resultados encontrados no survey que demonstraram a existência dessas adaptações, foi proposto um procedimento para avaliação da utilização do sistema kanban em empresas industriais por meio do relacionamento entre características de funcionamento original, condições do ambiente produtivo e vantagens do sistema. As cinco adaptações estudadas nos estudos de caso possuem como principal alteração a utilização de apenas um sinalizador. Foi concluído também, por meio da aplicação do procedimento, que as empresas que utilizam adaptações do sistema kanban deixam de usufruir (em maior ou menor grau, dependendo da adaptação) das seguintes vantagens: controle eficiente dos estágios produtivos; facilita a identificação da raiz de problemas produtivos; redução dos níveis de estoque; redução dos lead-times; redução de refugos e retrabalhos; atribuição de empowerment aos operadores; simplificação dos mecanismos de administração; e controle eficiente de informações.
158

Adaptação, implantação e avaliação de uma proposta de manufatura responsiva para a indústria de calçados: pesquisa-ação. / Adaptation, implementation, and evaluation of a proposal for responsive manufacturing in the footwear industry: an action research case.

Gracia, Eduardo 21 December 2005 (has links)
Made available in DSpace on 2016-06-02T19:52:13Z (GMT). No. of bitstreams: 1 DissEG.pdf: 974280 bytes, checksum: 8b68b7cd22a8e556ec3824797faa6614 (MD5) Previous issue date: 2005-12-21 / Nowadays enterprises are structuring themselves to become competitive in the world market. In the footwear business the search for competitiveness is even greater as this sector is highly dependent on labour and its products follow international fashion trends which make internal organisation and production and planning control (PPC) extremely difficult. A lot of research has been carried out to contribute to the improvement of this sector and this work is going to complement this body of research, helping the national footwear industry enterprises to become more competitive. The aim of this study is to adapt, implement and evaluate a model proposed in a doctorate thesis concerning a new approach of Responsive Manufacturing through action-research in a footwear factory. The object of study was a children s footwear factory in the city of Birigui in São Paulo state, whose workers had a strong influence on the research, thus characterising it as action-research. Considering these facts, it was possible to achieve the study s aim and to initiate the implementation of the Responsive Manufacturing paradigm in the footwear industry. Among the results obtained, we can highlight the following: reduction of production and labour costs; an increase in the amount of orders supplied within the deadlines; and the decrease of rework level. All these results also contribute to reducing the existing gap between theory and practice in Production Engineering studies and open up opportunities for new research in the footwear industry sector. / As empresas estão cada dia se estruturando para serem competitivas no mercado mundial. No ramo de calçados a busca por competitividade é ainda maior por ser um setor altamente dependente de mão-de-obra e seus produtos acompanharem a tendência da moda internacional, o que dificulta muito a organização interna, o planejamento e o controle da produção (PCP). Várias pesquisas vêm sendo feitas com objetivo de contribuírem para melhoria do setor e este trabalho vem complementar essas pesquisas e ajudar fabricantes de calçados nacionais a serem mais competitivos. O objetivo deste estudo é adaptar, implantar e avaliar o modelo, proposto em tese de doutorado, de nova abordagem para Manufatura Responsiva por meio de pesquisa-ação em fábrica de calçados. O objeto de estudo foi uma fábrica de calçados infantis localizada na cidade de Birigui Estado de São Paulo. Seus trabalhadores tiveram forte influência na pesquisa, caracterizando-a como pesquisaação. Diante disto foi possível atingir o objetivo do trabalho e dar início à implantação do paradigma Manufatura Responsiva na indústria de calçados. Dentre os resultados obtidos, destacam-se: reduções de custos produtivos e mão de obra, aumento nas quantidades de pedidos atendidos dentro dos prazos e diminuição dos índices de retrabalho. Todos resultados também contribuem para diminuir a lacuna existente entre a teoria e a prática da Engenharia de Produção e criam oportunidades de novas pesquisas para o segmento de calçados.
159

Diretrizes para o planejamento e controle da produção em obras de sistemas construtivos metálicos

Fabro, Fabiana January 2012 (has links)
No setor da construção civil, tem ocorrido um aumento na utilização de sistemas industrializados, dentre eles sistemas construtivos metálicos, visto que o uso desses sistemas contribui para o aumento da velocidade de execução dos empreendimentos e para a redução de desperdícios. Esta mudança tem criado oportunidades para a aplicação de conceitos e métodos de gestão da produção, desenvolvidos em outras indústrias, tais como a Filosofia da Produção Enxuta, que tem trazido muitos benefícios ao setor da construção, tais como redução de desperdícios, aumento da produtividade e da confiabilidade nos prazos de entrega. Entretanto, há poucas pesquisas sobre a utilização de conceitos da produção enxuta no processo de PCP de obras de empresas que fornecem sistemas construtivos metálicos. O presente trabalho tem como objetivo geral propor diretrizes para a concepção e implementação de sistemas de Planejamento e Controle de Produção em obras de empresas que projetam, fabricam e montam sistemas construtivos metálicos. São também propostas adaptações no Sistema Last Planner ao contexto de montagem deste tipo de sistema. A estratégia de pesquisa adotada foi a pesquisa-ação, sendo desenvolvidos cinco estudos empíricos em obras de uma empresa líder neste setor. O trabalho iniciou pela realização de um diagnóstico relativo aos fluxos de materiais e informações entre os principais setores da empresa, assim como análise do processo de planejamento e controle existente no processo de montagem. Na sequência, foram definidas e implementadas melhorias no processo de PCP em três obras da empresa. Os principais resultados obtidos pela pesquisa estão relacionados à necessidade de ampliação do escopo do projeto do sistema de produção, à adaptação dos níveis de planejamento de médio e curto prazo do Sistema Last Planner para este contexto, assim como à necessidade de integração do planejamento e controle do processo de montagem a outros processos à montante da obra. São também propostos diferentes tipos de sistemas de planejamento e controle da produção, em função da complexidade e do tamanho da obra. / In the construction sector, there has been an increase on the use of industrialized building systems, including steel construction systems, due to the contribution of those systems in terms of reducing the duration of projects, and reduction of waste. This change has created opportunities for the application of production management concepts and methods that have been originated in other industries, such as the Lean Production Philosophy, which has brought several benefits for the construction sector, such as waste reduction, increase in productivity and reliability in delivery time. However, there have been only a few research studies on the application of Lean Production concepts on the production planning and control process of companies involved in the delivery of steel construction systems. The aim of this research work is to propose guidelines for the conception and implementation of production planning and control systems for projects delivered by companies that design, manufacture and assemble steel construction systems. Moreover, some adaptations in the Last Planner Systems are proposed for the context of assembling this type of system. Action research was the research strategy adopted in this investigation, which involved the development of five empirical studies in projects carried out by a Brazilian leading company. This investigation started by carrying out an analysis of the material and information flows among the main departments of the company, as well as by assessing the existing planning and control process for site assembly. Then, a set of improvements in that process were devised and implemented in three construction sites of the company. The main results of this research work are concerned with extending the scope of production system design, adapting the medium and short-term planning levels of the Last Planner System to this context, and integrating the planning and control process for site assembly with upstream processes. Moreover, different types of planning and control systems were proposed for different types of projects, according to their complexity and size.
160

Integrated production planning and control model for engineer-to-order prefabricated building systems

Viana, Daniela Dietz January 2015 (has links)
A industrialização da construção civil é uma das possíveis estratégias adotadas para melhorar a qualidade e produtividade da produção neste ambiente altamente competitivo. Entretanto para uma melhoria na eficiência da produção, a simples implantação de uma tecnologia industrializada não é o suficiente. Existe a necessidade de melhorar os sistemas de gestão como um todo. O sucesso da implementação de sistemas de planejamento como o Last Planner, desenvolvidos especialmente para a construção civil, instiga o desenvolvimento de estudos em diferentes processos produtivos. Em relação à implementação de princípios da produção enxuta, o sistema é apontado como um ponto de partida para uma empresa atingir uma estabilidade básica. Este estudo foca-se em um tipo específico de sistema de produção industrializadas chamado engineer-to-order (ETO), quando a requisição de produto pelo cliente é realizada na fase de projeto. Neste tipo de sistema construtivo há uma necessidade de integrar a fabricação das peças conforme as necessidades do canteiro de obras. Esta pesquisa visa a desenvolver um modelo integrado de planejamento e controle da produção de sistemas ETO pré-fabricados para construção civil, integrando o projeto, manufatura e montagem em obra. A pesquisa faz parte de uma parceria da Universidade Federal do Rio Grande do Sul com uma empresa de fabricação e montagem de estrutura (Empresa A) metálica interessada em melhorar seus processos de planejamento e controle da produção. O método de pesquisa é baseado na pesquisa construtiva, ou design science, em que há um esforço do pesquisador em produzir um artefato como resultado da pesquisa, que neste caso, é um modelo de planejamento e controle da produção. O processo de implementação de mudanças da empresa adotou a estratégia da pesquisa-ação, de forma que as soluções eram coletivamente acordadas com as pessoas responsáveis pela sua utilização, para garantir que a mesma se efetivasse nos procedimentos da empresa. Neste tipo de estratégia procura-se estabelecer ciclos de aprendizagem ao longo da pesquisa, em que as soluções são continuamente avaliadas e adaptadas para melhoria dos processos em análise. Os resultados da empresa A foram divididos em quatro fases de implementação. Na primeira fase houve um esforço em consolidar uma integração nos planos de curto prazo. Na segunda fase o foco foi no sistema como um todo, promovendo mecanismos para coletar informações sobre o andamento das obras para retroalimentar a fábrica. As barreiras enfrentadas para garantir esta retroalimentação demonstraram a necessidade da utilização de outros métodos. Por isso, a terceira fase se concentrou no desenvolvimento de ferramentas de gestão visual para melhorar os processos analisados nas fases anteriores. A quarta fase do estudo foi baseada no estudo dos processos logísticos da empresa, visto que representam a interface entre fábrica e obra. Terminado o estudo na empresa A dois estudos foram conduzidos no exterior para compreender contextos distintos de sistemas de produção ETO. O primeiro (empresa B) responsável pelo sistema de climatização da edificação. A empresa realiza o projeto, fabricação e instalação dos sistemas de dutos em metal laminado, assim como o maquinário necessário para as trocas de ar. O estudo foi baseado no fornecimento do sistema para uma obra específica. Neste estudo foram desenvolvidas ferramentas de planejamento para facilitar a sincronização entre fabricação e instalação do material em obra. O segundo estudo (empresa C) foi realizado em uma empresa de estrutura metálica que desenvolveu uma conexão inovadora, facilitando seus processos produtivos. Este estudo teve caráter descritivo, analisando como a sua tecnologia facilitou o sistema de planejamento e controle da produção. A partir dos resultados obtidos nos estudos foi possível desenvolver o modelo final de planejamento e controle da produção para sistemas ETO de pré-fabricados. A maioria dos processos propostos neste modelo foi testada na empresa A. Embora a empresa estudada ainda necessite implantar algumas melhorias no seu sistema de planejamento e controle para se adequar ao modelo proposto, as mudanças realizadas trouxeram benefícios na comunicação e sistematização das informações entre os diferentes níveis de planejamento e controle. As contribuições teóricas do trabalho foram um modelo conceitual para compreender a complexidade neste tipo de sistema de produção; a identificação dos principais requisitos para desenvolver sistemas de planejamento e controle da produção para este ambiente; e a adaptação do conceito de WIP utilizando o status dos produtos. / The industrialization of construction work is one of the ways it is possible to achieve better quality and productivity in this competitive environment. However, in order to improve efficiency using industrialized technologies is not enough. There is a need to improve planning and control systems. Although the Last Planner System has been developed for the construction environment, since it was devised the successful results promoted its implementation in different production environments. Regarding lean production implementations, the system has been pointed out as a starting point for a company to achieve the basic stability. This study is focused in one type of industrialized production system: the engineer-to-order. By industrialized, it is the prefabrication that has been addressed. In these kinds of production systems, there is a need to integrate the prefabrication plant with the construction site needs. This research project aims to develop an integrated planning and control production planning and control model for ETO prefabricated systems, integrating design, manufacturing and site assembly. The research is part of a partnership with a steel fabricator company (Company A) that was interested in improving its production planning system. The research method is grounded in the design science research, in which there is an effort from the researcher to develop an artefact as an output of the research process, in this case, a planning and control model. The implementation adopted some strategies from the action-research, so some solutions needed to be collectively constructed between the researcher and the practitioners, in order to have an effective use in the organization. Following this strategy, it is possible to have same learning cycles during the implementation of the solutions, which are continually assessed and adapted in order to improve the processes analysed. The results are divided into four phases of implementation. In the first step the main effort was in consolidating an integrated planning and control process for the short-term in the production units. In the second step the focus was the overall system, mainly providing mechanisms to collect the status of all construction sites for the plant. The barriers to improve this feedback process brought to light the need for using visual management tools. This development concerned the third step of implementation, further improving the changes made in the previous phases. The fourth step was based on the analysis of the logistics processes, as the interface between the plant and site assembly. After the main empirical study on Company A, two studies were carried out abroad in order to understand a different context of ETO production systems. The first concerns a mechanical contractor situated in a high complex project. In this study, it was possible to develop some planning tools to facilitate the analysis between the fabrication and site installation of the products. The second concerns a steel fabricator focused on the structural system. This was a descriptive study that analysed the differentiation of the products provided by this company and the impact of it in the planning and control system. Based on the results obtained in the implementation process, the integrated planning and control model for ETO building systems was devised. Most of the processes proposed in the model were assessed in Company A. Although there is still a need to improve the production planning and control system of that company, the implementation enhanced the communication between the operational and tactics level and also promoted a systematic way to collect information for each level of the production planning and control system. The theoretical contributions of the research were the development of a framework to understand the complexity of this kind of production system; the identification of the main requirements for developing a planning and control system for this environment; and the adaptation of the concept of WIP using the status of the product.

Page generated in 0.1525 seconds