Spelling suggestions: "subject:"5project life"" "subject:"3kproject life""
31 |
Modelování a řízení projektového portfolia / Modelling and Management of Project PortfolioSkalníková, Zuzana January 2018 (has links)
This thesis is dedicated to modeling and management of project portfolio. In the first part, project is specified, along with methods for its managing. Next part describes the project portfolio, its managing and aspects that affect it. Thesis continues with analysis and design of software prototype capable of managing project portfolios. Most suitable methods are selected for project analysis. Designed prototype is then implemented and solution is described in the thesis. Last part of the work is user testing, which pointed out the functionality and usability of created prototype.
|
32 |
Variantní řešení investičního projektu / Alternative Solution of Investment ProjectHavlínová, Andrea Unknown Date (has links)
The aim of the diploma thesis „Alternative solution of investment project“ is to describe the investment project, its life stages and to determine its possible variant solution in terms of tradability with it. Based on the processed analysis and calculations, the work takes place on the difference between investment projects and determines the risks that could invest arise. The diploma thesis is divided into theoretical and practical part. The theoretical part characterizes the concepts of housing construction, housing, real estate market, real estate valuation, construction project management and economic efficiency of the project. The selected investment project in the given locality is chosen for the diploma thesis. The practical part of this work identifies the location, determines the list of categories of housing units according to the investment project, determines the total cost of the investment project, prepares an analysis of the profitability of the investment project, calculates the economic efficiency of the investment project and finally evaluates the differences.
|
33 |
Návrh optimalizace administrativy přijatých faktur / Proposal of Optimalization of Received Invoices AdministrationPoláchová, Jana January 2011 (has links)
Thesis aims to propose increasing the competitiveness of consulting firm that offers accounting, tax and management consulting through extending the range of products offered by the administration of incoming invoices of their clients. The aim of this study also suggest a system of administration of invoices received consultancy clients in order to minimize strain on the client's employees and authorized persons while enabling continuous work with these documents. The proposed solution can be applied for all types of organizations and structures.
|
34 |
Jištění rizik stavebního díla v předinvestiční fázi / Risk Protection of a Construction in the Pre-Investment PhaseDusilová, Kamila January 2014 (has links)
The thesis points out all posiible risk that are subsequently secured in a project of family house in Velký Osek. The theoretical part summerizes the detail sof teh project and risks evident especially dutiny the pre-investigation phase of the construction project and wals of solving the possible risks. The practical part deals with the indentification on the particular project, includes listing of the risks and concludes with thein prevention.
|
35 |
Studie proveditelnosti výstavby garážových objektů v městě Břeclav / Feasibility Study of Garages Construction in BřeclavKůrková, Dana January 2015 (has links)
The Master’s thesis deals with the evaluation of an investment project for the construction of terraced garages in Breclav. The aim is to prepare a feasibility study and to appraise the feasibility of the said building project. The structure of the study is tailored to the meaning and objectives of this dissertation, which is focused on marketing research and estimation of demand. Part of the feasibility study are also chapters that describe the essence of the project and its different phases, project management, the impact of construction on the environment, financial plan, evaluation of economic efficiency, schedule and risk analysis. The result of the study is to evaluate the feasibility of the investment project under specified conditions.
|
36 |
Långvariga relationer : En studie som undersöker långvariga relationers betydelse för samarbetsformerna i evenemangsprojekt / Long-lasting relationships : A study examining long-lasting relationships significance to the forms of collaboration in event projectsUrbain Sanz, Sara, Rezayi, Mostafa, Wikner, Elin January 2020 (has links)
Den här studien har undersökt vilken betydelse långvariga relationer har för samarbetsformerna mellan eventföretag och leverantörer i evenemangsprojekt. Studien utförde semistrukturerade intervjuer med eventföretag för att få en djupare förståelse. Sex framgångsrika eventföretag intervjuades, företagen hade antingen blivit nominerade eller vunnit branschtävlingen Gyllene Hjulet. För att skaffa sig en förståelse av vilken betydelse långvariga relationer har för samarbetsformerna har teorier om samarbete utgjort grunden för den teoretiska referensramen. Samarbetsformerna undersöktes med de fem samarbetsvariablerna: avsikt, symmetri av fördelar, interaktion, engagemang och förtroende. Teorier om projektlivscykeln och långvariga relationer förekommer också i den teoretiska referensramen. De fem samarbetsvariablerna undersöktes i projektlivscykelns faser; förstudie, planering och avslut för att undersöka samarbetet innan och efter genomförandefasen i evenemangsprojekt. Teorierna om långvariga relationer är i huvudsak till för att redogöra längden och fördelarna med att ha en långvarig relation. Studien kom slutligen fram till att de långvariga relationerna påverkar samarbetsformerna genom att arbetsprocessen blir effektiviserad och kvalitén på leveransen blir högre. Resultatet innebär att långvariga relationer har en positiv påverkan på samarbetsformerna och det gynnar både eventföretagen och leverantörerna. / This study has examined what significance a long-lasting relationship has for the forms of collaboration between Swedish event companies and suppliers in event projects. This study executed semi-structured interviews with event companies to accomplish a deeper understanding. Six successful event companies were interviewed, the companies had either been nominated or won the industry competition called Gyllene Hjulet. To acquire an understanding of the significance of a long-lasting relationship for the form of collaboration, theories about collaboration were included as the foundation for the theoretical frame of reference. The form of collaboration was analysed with the five collaboration variables: intention, symmetry of benefits, interaction, engagement, and trust. Theories about the project life cycle and long-lasting relationships are also included in the study’s theoretical frame of reference. The five collaboration variables are investigated through the phases in the project life cycle: initiation, planning and closure with the intention to study collaboration before and after the execution phase of the event projects. Theories about long-lasting relationships are mainly applied to define the length of the relationship, as well as what are its benefits. The study finally concluded that the long-lasting relationships affect the forms of collaboration by making the work process more efficient and the quality of the delivery higher. The result investigates that long-lasting relationships have a positive impact on the forms of collaboration, and it benefits both the event companies and the suppliers. Disclaimer this study is written in Swedish.
|
37 |
Studie proveditelnosti rekonstrukce stavebního objektu / Feasibility Study of the Reconstruction of the Building ConstructionSvobodová, Zuzana January 2012 (has links)
The aim of this work is the explanation of the issue of passive houses and renovation of existing buildings to passive energy standard. Another task of the work is a feasibility study of building renovation of the "Tuzex" for the needs of Center of sustainable construction in Brno. Part of this study is to create a marketing analysis, design of organizational project management, a description of technical solution, impact assessment project on the environment and in particular evaluating the economic efficiency of investment. The result of this work is to evaluate the feasibility of the project under current conditions.
|
38 |
Řízení projektů pomocí specializovaných softwarů / Management of Projects with Specialized SoftwareŠvehla, Michal January 2012 (has links)
This diploma thesis deals with management of projects with specialized software. It contains principles of project management in general and in construction projects. For this purpose, it’s primarily devoted to MS Project (general), BUILDpower and CONTEC (construction projects). Thesis also offers a look at the possibilities of combining the advantages of both approaches. For practical examples, there is representative construction project in pre-investment phase. This project or its parts is elaborated in mentioned software.
|
39 |
Posouzení ekonomické efektivnosti a rizik developerského projektu / Evaluation of Economic Efficiency and Risks of Developer ProjectPospíšil, Přemek Unknown Date (has links)
The subject of the diploma thesis is economic evaluation and risk assessment of investment projects. The theoretical part deals with the life cycles of the construction, the characteristics of the development project, its investor and the risks associated with the implementation of the project. The output of the diploma thesis is the elaboration of economic evaluation and risk assessment on a selected development project.
|
40 |
Identifying success factors in a public sector project : an empirical study of the Malaysian School Computer Laboratory ProjectJohari, Mohamad Farazi January 2010 (has links)
The public sector project is particularly a demanding undertaking, with the requirement to meet diverse demands. Despite huge investment, public sector projects tend to complete behind schedule, indicating shortfall in various project factors. This research was grounded on an empirical study of the Malaysian School Computer Laboratory Programme (SCLP) to examine the project success factors throughout the project life span. The extensive SCLP was divided into six zones, spanning urban and remote environment throughout Malaysia. Its implementation was staggered into several phases, two of which covered in this study, namely phase-1 and phase-2. This research aimed to fulfil three research objectives: i) to discover the project management’s success factors; ii) to determine the product’s success factors that encompass various stakeholders; and iii) to identify project characteristics that influenced the project success. A comprehensive review of literature suggested 20 relevant project success factors to be investigated. Those factors were examined using a newly constructed framework, whereby the project life span was clustered into two segments – project process and project product. The study adopted a qualitative paradigm; nevertheless it utilised both qualitative and quantitative approaches of data collection, which were triangulated to provide a wider scope of interpretation. The quantitative data for a total sample of 357 projects were sourced from Likert-type questionnaire and secondary resources, while qualitative data were sourced from combination of semi-structured interviews with 38 respondents representing 10 groups of project stakeholders and secondary data from various documents. The results demonstrated that the project management of the SCLP was improperly administered. Out of five success factors investigated to verify the project conceptualization, only two namely project goal and project scope, were reasonably defined. One factor, stakeholder participation, was inadequately defined, while the other two factors, resources assessment and risk management, were not even taken into consideration by the project decision-making committee. There were also some deficiencies in the project planning. From six success factors tested, two were acceptably planned, i.e. project design and project costing. The other four, namely distribution of authority and responsibility, contractor selection, project scheduling, and project documentation, were insufficiently planned. The inadequacies in the project definition and project planning were reflected in the project execution as only two out of six factors, i.e. administrator effectiveness and communication, contributed to the project success. The other four, known as supervising team efficiency, contractor competence, integrity and external influences were negatively affected the project. Despite some deficiencies in the project management, the outcome or product of the project was found to be successful particularly in the judgement of the target group, the users; they were satisfied with the SCLP deliverables. They also appreciated the benefit from the utilisation of the products, which greatly changed the approaches of teaching and learning. However, the SCLP completion time was not as successful as planned, believed to be a result of unrealistic scheduling during the planning stage. Nonetheless, there were cases of genuine delays due to various factors in the earlier stages. The results also suggested that some of the project success factors were particularly influenced by project characteristics explored in this studied. The influences of these two characteristics, geographical zone and the project award method, could be seen in both the project management process and the project’s product. Overall, this thesis contributed to extant body of knowledge in various ways. A newly constructed research framework, with the concept of duality of project process and product, added depth to the longstanding idea of project success and expanded premises of the existing theory. This framework offered a better platform to identify when particular factors take place and affect the project along the project life span. This study also added a new insight to the Malaysian public sector projects management strategies in particular and to the other countries with the similar situations in general. A new paradigm in project decision-making by adopting a bottom-up concept rather than traditionally top-down alone during the project conceptualisation and a more realistic resource-based approach during the project planning, is suggested. In addition, this research proposed an ideal way to deal with various critical success factors in a huge programme.
|
Page generated in 0.0602 seconds