• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 20
  • 6
  • 4
  • 1
  • 1
  • Tagged with
  • 34
  • 34
  • 20
  • 19
  • 19
  • 17
  • 17
  • 17
  • 17
  • 16
  • 15
  • 15
  • 14
  • 13
  • 13
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Vybrané časti stavebne technologického projektu bytového domu Eden v Poprade / Selected Parts of the Construction Technology Project of the Eden Apartment Building in Poprad

Macho, Andrej January 2022 (has links)
The subject of this final thesis is to process selected parts of the construction technological project for the apartment house Eden in Poprad. The thesis deals with the implementation of the rough construction of the building. The content of this thesis is a engineering report, site plan with estate road layout, time schedule and financial plan for the whole object, feasibility study of the main technological stages of the building, construction site equipment project with drawings of three main technological stages, design of major construction machinery and mechanisms, time schedule of the rough construction of the main building, balance of workers and main machines, item budget, technological regulation for the realization of monolithic floor slab, control and test plan for the realization of monolithic reinforced concrete structures. As another assignment, I process selected points of LEED certification, noise study and health and safety plan.
12

A Critical Review of the Procedure to Develop the State Highway Safety Plan

Ackerman, Kathryn R. 24 March 2021 (has links)
No description available.
13

Torkklimat under byggproduktion : En kvantitativ studie baserad på klimatdata och litteraturstudier / Drying climate during construction condition : A quantitative study based on climate date and literature studies

Sidenqvist, Daniel, Ternstedt, Viktor January 2014 (has links)
En utmaning under produktionen är uttorkning av byggfukt i byggnadens betongbjälklag. Om uttorkningen försenas kan golvbeläggningar inte appliceras i rätt tid, men att arbetet forceras är inte ett alternativ, då risken finns att fuktskador uppkommer under driftsskedet. Avgörande för att uttorkningen skall fortskrida enligt plan är att torkklimatet i byggnaden är gynnsamt för uttorkningsprocessen. För att kontrollera torkklimatet genomför företaget ett omfattande arbete genom att mäta klimatet, där dataloggar på olika platser i byggnaden registrerar luftens temperatur och relativa fuktighet. Tillsammans med trendmätningar i betong är tanken att insamlad data skall ge en bild av hur uttorkningen fortskrider. Svårigheten med torkklimat är att ämnesområdet i många avseenden är abstrakt och teoretiskt, just därför att parametrarna som beskriver torkklimatet ständigt varierar. För att insamlad data skall addera värde för produktionen måste datamängderna analyseras och visualiseras på ett tydligt sätt, som medför att produktionsledningen kan agera utifrån informationen utan att nödvändigtvis besitta spetskompetens inom ämnesområdet. Examensarbetet syftar till att bistå företaget med ökade kunskaper om torkklimat under byggproduktion, kopplat till uttorkning av byggfukt. Under arbetet har förutsättningarna för en effektiv uttorkning studerats, med avseende på torkklimatets variation. Under arbetet har också en undersökning gjorts för att ta reda på när företaget i ett generellt fall bör komplettera torkklimatet med ökad ventilation och/eller avfuktning för att hålla ett jämnt torkklimat i byggnaden året om. Som bakgrund till ämnesområdet redovisas en beskrivning av de styrande faktorerna för torkklimatet, teoretiskt och projektspecifikt. Resultatet av studien visar att förutsättningarna för en effektiv uttorkning har funnits på de platser i byggnaden som studerats, i det avseendet att en majoritet av klimattrenderna följer uppsatta kriterier i projektets fuktsäkerhetsplan.  Studien visar också att en komplettering med ökad ventilation och/eller avfuktning bör starta under perioden mars till april och under oktober till november kan uttorkningsstrategin återgå till att enbart värma inomhusluften. / A challenge during construction is drying of construction moisture in the building's concrete slab. If the drying is delayed, the flooring can’t be applied at the right time, but forcing the process is not an option, because of the risk of moisture damage during the operating phase. Crucial to the planed drying is that the climate in the building is favorable for the drying process. In order to control the drying climate the company is conducting an extensive work by measuring, where data logs at different locations in the building records air temperature and relative humidity. Along with the trend measurements of moisture levels in the concrete slab, the idea is that the data series should provide a picture of how the drying progresses. The difficulty with drying climates is that the subject in many respects is abstract and theoretical, because the parameters that describe the drying climate are continuously changing. If the collected data should add value to the construction site, the amount of data needs to be analyzed and visualized in a clear way, which means that the company's construction management services can act based on the information without necessarily possessing expertise in the subject area. This bachelor degree project aims to assist the company with knowledge of drying climate during construction condition, linked to the drying of construction moisture. During the work, the conditions for effective drying of construction moisture have been studied with respect to variations in drying climate.  Another study also conducted, was to find out when the company in a general case may complement drying climate with increased ventilation and/or dehumidification to keep the drying climate at a steady level in the building year round. As background to the subject, a description of the factors controlling the drying climate is presented in the report, theoretical and specifically for the project. The results of the study show that the conditions for effective drying of construction moisture have been the case of the building sites that has been sampled, in the sense that a majority of climate trends follow the established criteria in the project's moisture safety plan. The study also shows that increased ventilation and/or dehumidification may be applied as a supplement in the period from March/April until October/November at which time the dehydration strategy can revert back to warming indoor air only.
14

Bytový dům Brno,Vídeňská- příprava a realizace stavby. / Apartment building Brno,Vídeňská - preparation and realization construction.

Hlušičková, Lenka January 2013 (has links)
This Master’s thesis deals with the technological project of the new building apartment house in Brno. This work includes technical reports, site equipment, wider transport relations,budget calculation, time planning, inspection and test plan, mechanical assembly, contract for work, safety plan and risks on the building.
15

Bytové domy Lípa v Hodoníně - stavebně technologická příprava výstavby / Apartment Buildings in Hodonín Lípa - the Building Technological Planning.

Gabčová, Kateřina January 2014 (has links)
The technological project for the realization of the Apartment buildings Lípa in Hodonín includes a technical report, the preparation and construction site equipment, the time schedule and financial plan, the project budget, the technological prescription, the control and test plan, the health and safety plan, the plan of risks and prevention.
16

Bezpečnost práce a pracovní úrazy ve stavebnictví / Work safety in the construction industry with a focus on accidents at work

Charvát, Jakub January 2014 (has links)
The aim of the thesis is to approach the issues of health and safety at work and work-related accidents in the construction industry. The theoretical part is devoted to the historical development of occupational health and safety in general, and consequently the development of inspection bodies operating in this area at present. Then there is also handled accident statistics for 2012. The practical part is a form of treatment for specific health and safety plan construction contract with a subsequent risk analysis.
17

Stavebně technologický projekt administrativního a skladovacího objektu / Constructional - Technological Project of Office and storage Building

Večeře, Tomáš January 2015 (has links)
This thesis focuses on constructional - technological project of realization Ace Trade corp. premises in Hylváty near Ústí nad Orlicí. Constructional – technological project consist mainly of time and financing plan, construction site design, machinery draft, detailed time plan and budget for the main building, technological manual for foundation, quality control plan for foundation and health and safety plan.
18

Stavebně technologický projekt výrobní haly v Litomyšli / Construction and technological project of the production hall in Litomyšl

Patrný, Jan January 2016 (has links)
This thesis consists of a technological project of the production hall realization in Litomyšl. The main part of the project is a building schedule and a financial plan of the construction itself. Moreover thesis consists of a building site equipment design, construction machinery needed for building and a workplace safety plan. The process of selected realization parts are described in the technological manual and the quality control and inspection plan.
19

Centrum polymerních systémů ve Zlíně - stavebně technologická příprava výstavby / Polymer Systems Centre in Zlín - the Construction Techological Planning

Foltánek, Jan January 2017 (has links)
The thesis deals with a technological project of Polymer System Centre in Zlín. It focuses on financial documentation and a time schedule of the construction. The technological project in detail focuses on implementation of a fabric of the Polymer System Centre. The thesis includes a technical report which suggests procedure of the construction. The technological documentation includes a plan of the construction site arrangement, a time schedule, a financial plan for the construction, a budget, a technological report suggesting partitions made of magnesium slabs, a control plan, a test plan and health and safety plan.
20

Management sociální práce v případě domácího násilí / Management of social work in the case of domestic violence

Dömeová, Tereza January 2017 (has links)
My work called Management of social work in problematics of domestic violence will cover management of social work and work of social workers in this problematics in chosen intervention, crisis, counseling centers and shelters in Prague and Central Bohemia. The goal of the work will be to chart how do social workers work in these different centers with victims of domestic violence and to give us a complete picture and summary of this problematics and management of social workers in it. Given the topic of this work, I will first focus on domestic violence. I will focus on basic characteristics, types, forms, causes and also on the high risk groups of people. Further of it will offer a look into the legislative framework in this area. Using surveys, which were given to individual social workers in these chosen centers, I will try to describe management of social workers in problematics of domestic violence.

Page generated in 0.0644 seconds