Impacts of the Interim Federal Health Program on healthcare access and provision for refugees and refugee claimants in Canada: A stakeholder analysisAntonipillai, Valentina 11 1900 (has links)
Background: Refugees and refugee claimants experience health needs upon arrival in Canada. Retrenchments to the Interim Federal Health program (IFHP) in 2012 greatly reduced healthcare access for refugee claimants, generating concerns among healthcare providers and other stakeholders affected by the reforms. In 2014 a new IFH program temporarily reinstated access to some health services however, little is known about the reforms and more information is needed to map its impact on key stakeholders. This study aims to examine the perception of key stakeholders regarding the impact of the 2014 reforms on the policy’s intermediary goals: access and provision of healthcare.
Methodology: Data was collected using semi-structured key informant interviews with refugee health policy stakeholders (n=23), refugees and refugee claimants (n=6), policy makers and government officials (n=5), civil society organizations (n=6) and professionals and practitioners (n=6). Data was analysed using a constant comparative approach with NVivo 10 (QSR International). A stakeholder analysis was used to map out key stakeholder perceptions, interests and influences in refugee health policy and a content analysis was further employed to abstract themes associated with barriers and facilitators to access and provision of healthcare in the current situation.
Results: The findings provide information for management of stakeholder engagement revealing the perceptions of key stakeholders on the 2014 reforms: eight were opposed to the reforms, eight held mixed positions, four supported the reforms and one did not comment. Five facilitators to accessing healthcare were identified. Eighteen themes emerged under four health care access and provision barrier categories: cognitive, socio-political, structural and financial. There were four common themes perceived among all stakeholder groups: lack of communication and awareness of refugee and provider, lack of care provider training leading to unfamiliarity with IFHP, lack of continuity and comprehensive care and the political discourse leading to refugee and claimant social exclusion. Other common barrier themes included healthcare affordability for refugees and the healthcare system, fear of the healthcare system, and interaction with the Ontario Temporary Health Program.
Conclusion: The study highlights that reforms to the IFHP in 2014 have transferred refugee health responsibility to provincial authorities and healthcare institutions resulting in bureaucratic strains, inefficiencies, overburdened administration and increased health outcome disparities as refugees and claimants choose to delay seeking healthcare due to existing barriers. There are some benefits to the reforms, but the lack of support and mixed opinions among the majority of stakeholders emphasize the need for reformulation of policy with stakeholder engagement. This study recommends future refugee health reform strategies incorporate stakeholder leadership, cooperation and perspectives, as revealed in this research, to successfully move healthcare policy from theory to practice. / Thesis / Master of Science (MSc)
|
12 |
Governance of sustainable event-led regeneration : the case of London 2012 OlympicsEdizel, Hayriye Özlem January 2014 (has links)
This study aims to understand the interface between the governance of event-led regeneration and sustainable development by taking the London 2012 Olympic Games/Lower Lee Valley area regeneration process as a case study. Since the early 1990s, there is a widespread trend towards the use of mega-events to promote a city, stimulate the local economy and regenerate rundown post-industrial areas and communities. The importance of mega-events in destination development has gained increasing attention and they are also considered as a catalyst for city regeneration. The emphasis in the aims of event-led regeneration has changed over the time and the sustainability in terms of economic, physical, social and governance dimensions has gained significant attention from both organisers and researchers. In the context of sustainable event-led regeneration, multiple stakeholder perspectives are essential and it is important to know how different actors are involved and interact in an event-led regeneration. London used 2012 Olympics to regenerate East London, one of the most deprived parts of the city. It is taken as an opportunity to explore new frontiers of interaction and cooperation between the local, regional and national stakeholders. This research adopts an integrative approach, which evaluates the changes in the built environment, social structure and stakeholder organisation together to evaluate the sustainability of the event-led regeneration governance. Data collection methods include interviews with stakeholders of London 2012 planning and organization, focus group meetings with residents living in and around the fringe of the London 2012 Olympic Park, secondary data analysis and document analysis. The research provides a sound base from which the planning of more sustainable mega-events can be undertaken by using the epistemological framework for sustainable event-led regeneration and the evaluation of their impact more fully measured across a wider stakeholder community. The conclusion emphasises the importance of the collaborative approach for the governance and resilience as critical for sustainable event-led regeneration.
|
13 |
Náhrada škody jako nástroj pro řešení škod způsobených povodněmi / Compensation for damage as an instrument for solution of damages in case of floodsSztuková, Karolína January 2010 (has links)
Floods in The Czech Republic more often damage private property. Majority of such damages is caused by water stream itself. There are also situations, where damages are caused in case of dereliction, infringement or violation of statutory duty. The Czech legislature defines legal instrument - Compensation for Damage. This work examines how this instrument is used in cases of flood damages, where someone is guilty. We examine legal (court) processes for Compensation for Damage by an application of IAD Framework and Stakeholder Analysis. Results are as follows. The examined legal instrument is seldom used. In the conclusion there are discussed possible grounds of these research results and steps/provision for more frequent application of Compensation for Damage in consequence of floods.
|
14 |
Vägprojekt: nya E4:an, delsträckan mellan Uppsala och Läby : Så gick besluts- och samrådsprocessen tillLarsson, Malin January 2007 (has links)
<p>A Road project’s frame is built up of a decision- and consultation process, where the results of the preparatory studies are being discussed. The aim with a consultation process is that all the</p><p>opinions and knowledge from the operators' will be taken into count in the basis of information, that is needed in order to the different involved operators' to take a decision.</p><p>The aim of the essay was to investigate how the decision- and consultation process for a road project, the E4 section between Uppsala Läby, turned out. The aim is also to bring up how the</p><p>process could have been done more correctly. The study was carried out through a qualitative method with an analysis of materials from the National Road Administration's archives, the associated Environmental Impact Assessment (EIA) and through interviews of the different operators.</p><p>My theoretical basis has been a Stakeholder Analysis and its principles, and theory about different executions of social planning.</p><p>The result showed that the decision- and consultation process has been bursting in democracy and consideration taking of the different operators' opinions, has been poor from the developer’s, in this case the National Road Administration's, side. The National Road Administration has implemented the project on the basis of its own preferences and has not more or less given some compromises to the other operators. The public felt displeased and disappointed, as there were many people affected by the road. The municipalities and the county board got the feeling of that there has been an informal process at the National Road Administration that has been vital important for the final decision about the road's draw.</p> / <p>Ett vägprojekts stomme byggs upp av besluts- och samrådsprocesser, där resultaten av förstudierna diskuteras. Syftet med en samrådsprocess är att alla aktörers åsikter och kunskaper ska tas med i det underlag av information, som behövs för att de olika inblandade</p><p>parterna ska kunna fatta ett beslut.</p><p>Uppsatsens syfte var att undersöka hur besluts- och samrådsprocessen för ett vägprojekt, E4:ans delsträcka mellan Uppsala-Läby, gick till och att föra fram vad som kunde ha gjorts bättre. Studien utfördes genom en kvalitativ metod med en analys av material från Vägverkets</p><p>arkiv, den tillhörande Miljökonsekvensbeskrivningen och genom intervjuer av de olika aktörerna.</p><p>Min teoretiska utgångspunkt har varit aktörsanalyser och dess principer, samt teori om olika utföranden av samhällsplanering.</p><p>Resultatet visade att besluts- och samrådsprocessen har varit bristande i demokrati och hänsynstagande av de olika aktörernas åsikter, har varit dåligt från projektörens, i det här fallet Vägverkets, sida. Vägverket har genomfört projektet utifrån dess egna preferenser och har i stort sett inte givit några kompromisser till de andra aktörerna. Allmänheten känner sig missnöjda och besvikna, det var många som drabbades hårt av vägens sträckning.</p><p>Kommunerna och Länsstyrelsen fick känslan av att det har pågått en informell process hos Vägverket som har varit avgörande för det tagna beslutet om vägens dragning.</p>
|
15 |
Who Matters?! : External stakeholder analysis in projectsBothén, Niklas, Brantås, Erik, Stening, Carl Johan January 2010 (has links)
<p>Stakeholder management is a topic that has received increased attention in later years. Researchers have tried to answer the question of which stakeholders that really matters to organizations and developed ways for identifying and prioritizing among stakeholders. This thesis fills a void in academia by looking exclusively on external stakeholders in large and complex projects such as the construction of power plants. The thesis investigates the approach towards external stakeholders as well as the process of identifying and prioritizing external stakeholders in this specific setting. By using attributes identified in earlier research, a theoretical framework was created that was used to investigate two of Sweden’s largest companies through a qualitative case study. The thesis describe how stakeholder identification and prioritization occurs in the different case companies and ultimately contribute with a new model that can be used by managers to prioritize among external stakeholder in organizational projects.</p>
|
16 |
Who Matters?! : External stakeholder analysis in projectsBothén, Niklas, Brantås, Erik, Stening, Carl Johan January 2010 (has links)
Stakeholder management is a topic that has received increased attention in later years. Researchers have tried to answer the question of which stakeholders that really matters to organizations and developed ways for identifying and prioritizing among stakeholders. This thesis fills a void in academia by looking exclusively on external stakeholders in large and complex projects such as the construction of power plants. The thesis investigates the approach towards external stakeholders as well as the process of identifying and prioritizing external stakeholders in this specific setting. By using attributes identified in earlier research, a theoretical framework was created that was used to investigate two of Sweden’s largest companies through a qualitative case study. The thesis describe how stakeholder identification and prioritization occurs in the different case companies and ultimately contribute with a new model that can be used by managers to prioritize among external stakeholder in organizational projects.
|
17 |
Vägprojekt: nya E4:an, delsträckan mellan Uppsala och Läby : Så gick besluts- och samrådsprocessen tillLarsson, Malin January 2007 (has links)
A Road project’s frame is built up of a decision- and consultation process, where the results of the preparatory studies are being discussed. The aim with a consultation process is that all the opinions and knowledge from the operators' will be taken into count in the basis of information, that is needed in order to the different involved operators' to take a decision. The aim of the essay was to investigate how the decision- and consultation process for a road project, the E4 section between Uppsala Läby, turned out. The aim is also to bring up how the process could have been done more correctly. The study was carried out through a qualitative method with an analysis of materials from the National Road Administration's archives, the associated Environmental Impact Assessment (EIA) and through interviews of the different operators. My theoretical basis has been a Stakeholder Analysis and its principles, and theory about different executions of social planning. The result showed that the decision- and consultation process has been bursting in democracy and consideration taking of the different operators' opinions, has been poor from the developer’s, in this case the National Road Administration's, side. The National Road Administration has implemented the project on the basis of its own preferences and has not more or less given some compromises to the other operators. The public felt displeased and disappointed, as there were many people affected by the road. The municipalities and the county board got the feeling of that there has been an informal process at the National Road Administration that has been vital important for the final decision about the road's draw. / Ett vägprojekts stomme byggs upp av besluts- och samrådsprocesser, där resultaten av förstudierna diskuteras. Syftet med en samrådsprocess är att alla aktörers åsikter och kunskaper ska tas med i det underlag av information, som behövs för att de olika inblandade parterna ska kunna fatta ett beslut. Uppsatsens syfte var att undersöka hur besluts- och samrådsprocessen för ett vägprojekt, E4:ans delsträcka mellan Uppsala-Läby, gick till och att föra fram vad som kunde ha gjorts bättre. Studien utfördes genom en kvalitativ metod med en analys av material från Vägverkets arkiv, den tillhörande Miljökonsekvensbeskrivningen och genom intervjuer av de olika aktörerna. Min teoretiska utgångspunkt har varit aktörsanalyser och dess principer, samt teori om olika utföranden av samhällsplanering. Resultatet visade att besluts- och samrådsprocessen har varit bristande i demokrati och hänsynstagande av de olika aktörernas åsikter, har varit dåligt från projektörens, i det här fallet Vägverkets, sida. Vägverket har genomfört projektet utifrån dess egna preferenser och har i stort sett inte givit några kompromisser till de andra aktörerna. Allmänheten känner sig missnöjda och besvikna, det var många som drabbades hårt av vägens sträckning. Kommunerna och Länsstyrelsen fick känslan av att det har pågått en informell process hos Vägverket som har varit avgörande för det tagna beslutet om vägens dragning.
|
18 |
Mega Events As A Place Marketing Strategy In Entrepreneurial Cities: Stakeholder Analysis Of Izmir Expo 2015 CandidacyEdizel, Hayriye Ozlem 01 June 2009 (has links) (PDF)
Starting with the 1970s, cities have found themselves in a trouble which is caused by economic changes, technological improvements and local-global power shifts. Under the impact of these changes, cities have started to act as independent units and try to get a higher their position in the hierarchical system of the globalised world. Therefore, competition started between cities other than states and entreprenurial strategies are developed by local governments and actors for sustaing local economic development. One of the most popular place marketing strategies, mega-events such as EXPO, Olympic Games are considered as a valuable instrument to promote a region as a tourist destination, business location, and an attractive place to live and work. This study investigates an understanding of how to use a mega event as a tool in the place marketing strategy and building up entrepreneurial governance by examining the stakeholder organization of Izmir EXPO 2015 candidacy period. The research analyzes the approaches of different stakeholders of Izmir to EXPO opportunity and the impact of bidding on the stakeholder organization of Izmir. The most important conclusion of the study is that collaborative study of stakeholders can help to build up the entrprenurial city even if the city does not host a mega event.
|
19 |
An Application of Systems Engineering to Analyze the Interagency Coordination Aspect of Counter Trafficking and TerrorismAbeto, Benjamin 06 1900 (has links)
This thesis utilizes principles of the systems engineering process discussed by Dennis Buede in â The Engineering Design of Systems: Models and Methods (2nd ed.)â (2009). The systems engineering process is used to create a functional architecture to analyze interagency coordination in support of counterterrorism efforts in the United States European Command area of operation. The resulting functional architecture serve as tools for policymakers as they determine the best ways to create a synchronous whole of government approach to defend United States interests.
|
20 |
Material Flow and Stakeholder Analysis for a Transfer & Recycling Station in Gaborone, BotswanaAndersson, Emil January 2014 (has links)
Landfilling waste material is still one of the most common methods to take care of waste in a big part of the world. Gaborone, the capital of Botswana located in the southern part of Africa is no different in this way. The major part of all waste is landfilled in Gaborone and there is only a minor part of all collected material that is recycled. One solution that earlier studies suggest is to build a transfer and recycling station in the city of Gaborone that can contribute to a more sustainable waste management. This study aims to identify the major waste streams of recyclable waste and also the major stakeholders that are active in this area through an exploratory study involving interviews, a workshop and a survey. The result of this thesis can hopefully assist in the preparations for such a transfer station. The conclusions of this study are many and contains of both hard facts and also loose ends that can contribute to pursue further studies. The first important result is that all the waste collection companies transports everything they collects to a landfill and it is only recycling organizations that are working with collection and recycling in Gaborone. These recycling organizations are a few but smaller compared to the waste collection companies in collected amounts of material. Besides these collection organizations, Gaborone City Council, the local municipality works with collection of household waste and the collaboration between these three groups that operates in the same environment is very poor. All the interviewed stakeholders showed a positive interest in the transfer and recycling station but there is only a small part of the commercial business in Gaborone that believes in a more serious waste management than landfilling. Despite that one major shopping mall actually sort out recyclables and saves 30% in waste management costs thanks to that. Another issue is the prevailing cultural contradictions that is obvious among the organizations in Gaborone. The last two bigger issues is the tremendously dull political bureaucracy that is appearing in Botswana and also that voices are raised that corruption is great beneath the surface.
|