• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3
  • Tagged with
  • 3
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Lagerstyrningssystem för ökad flexibilitet / Inventory control system for increased flexibility

Altsäter, Erik January 2009 (has links)
Detta examensarbete har ägt rum vid Produktionsverkstad 1 (PV1) på Wexiödisk AB där diskmaskiner av huvtyp tillverkas. Syftet med detta examensarbete har varit att undersöka vilka lagerstyrningsmodeller som är lämpliga för att styra avdelningens materialflöden med. Arbetet har genomförts i två steg. Först behandlades artiklar unika för produkterna vid PV1, därefter artiklar gemensamma med andra produkter. Enligt modeller ur relevant litteratur utformades förslag på hur dessa kunde appliceras praktiskt. Förslagen presenterades och diskuterades med berörd personal som valde Tvåbingesystem 2. Ett test gjordes enligt principen ”den japanska sjön” vilket innebar lägre lagernivåer i lastbärarna. De problem som uppstod noterades. Resultatet blev att antalet artiklar som plockades i veckosatser minskades vilket skapat underlag för att minska administrationen av tillhörande plocklistor. Plockvagnen har kunnat tas bort vilket frigjort yta vid monteringsavdelningen. Förutsättningar finns att slå samman två plocklistor till en och därmed förenkla arbetet för förrådspersonalen. / This degree project has been performed at Production unit 1 (PV1) at Wexiödisk AB, where hood type washing machines is manufactured. The purpose of this project has been to investigate which inventory control models that could be suitable to control the section’s material supplies. The work has been accomplished in two steps. At first, items unique to products manufactured at PV1 were treated, followed by items common with other products. According models in relevant literature, suggestions were made to how the models could be applied practically. The suggestions was presented to and discussed with the parties concerned who chose Two-bin system 2. A trial was carried out according to the principle of “the Japanese river” which implied lowered inventory levels. The problems that occurred were noted. The result was that the number of items that was weekly picked and distributed was reduced which has created a basis to also reduce the administration of the systems picking lists. The item wagon has been removed which has cleared floor space at the assembly section. Conditions have been created to merge two picking lists into one and thereby simplify the work for the inventory staff.
2

Lagerstyrningssystem för ökad flexibilitet / Inventory control system for increased flexibility

Altsäter, Erik January 2009 (has links)
<p>Detta examensarbete har ägt rum vid Produktionsverkstad 1 (PV1) på Wexiödisk AB där diskmaskiner av huvtyp tillverkas. Syftet med detta examensarbete har varit att undersöka vilka lagerstyrningsmodeller som är lämpliga för att styra avdelningens materialflöden med. Arbetet har genomförts i två steg. Först behandlades artiklar unika för produkterna vid PV1, därefter artiklar gemensamma med andra produkter. Enligt modeller ur relevant litteratur utformades förslag på hur dessa kunde appliceras praktiskt. Förslagen presenterades och diskuterades med berörd personal som valde Tvåbingesystem 2. Ett test gjordes enligt principen ”den japanska sjön” vilket innebar lägre lagernivåer i lastbärarna. De problem som uppstod noterades. Resultatet blev att antalet artiklar som plockades i veckosatser minskades vilket skapat underlag för att minska administrationen av tillhörande plocklistor. Plockvagnen har kunnat tas bort vilket frigjort yta vid monteringsavdelningen. Förutsättningar finns att slå samman två plocklistor till en och därmed förenkla arbetet för förrådspersonalen.</p> / <p>This degree project has been performed at Production unit 1 (PV1) at Wexiödisk AB, where hood type washing machines is manufactured. The purpose of this project has been to investigate which inventory control models that could be suitable to control the section’s material supplies. The work has been accomplished in two steps. At first, items unique to products manufactured at PV1 were treated, followed by items common with other products. According models in relevant literature, suggestions were made to how the models could be applied practically. The suggestions was presented to and discussed with the parties concerned who chose Two-bin system 2. A trial was carried out according to the principle of “the Japanese river” which implied lowered inventory levels. The problems that occurred were noted. The result was that the number of items that was weekly picked and distributed was reduced which has created a basis to also reduce the administration of the systems picking lists. The item wagon has been removed which has cleared floor space at the assembly section. Conditions have been created to merge two picking lists into one and thereby simplify the work for the inventory staff.</p>
3

Analys av intern förädlingskedja : En flödesstudie i processindustrin / Analysis of internal processing chain : A flow study in the process industry

Patriksson, Ola, Piscoran, Alin January 2019 (has links)
Utgångspunkten i examensarbetet är flödesmässiga förbättringar. Vid kontakt med fallföretaget presenterades en för företaget viktig produkt. Värdeflödeskedjan för denna produkt går genom flera värdeadderande processer, samt flera icke värdeadderande aktiviteter, vilka företaget önskar kartlägga. Dessa aktiviteter utgörs både av icke värdeskapande, men nödvändiga, aktiviteter, likväl som rena slöserier. Därmed är studiens syfte: Att kartlägga det interna flöde produkten följer, i syfte att identifiera och minimera icke värdeskapande aktiviteter, för att slutligen utifrån teorin utforma förslag på flödesmässig effektivisering och förbättring För att besvara syftet har två frågeställningar formulerats: ”Hur ser värdeflödet för aktuell produkt ut i nuläget, samt vilka slöserier kan identifieras?” samt, baserat på den första: ”Vilka aktiviteter kan uteslutas utan att kundens förväntningar påverkas negativt samt vilka förslag kan ges utifrån teorin för att effektivisera och förbättra flödet?” Frågeställningarna har besvarats genom analys av empiriskt material insamlat genom dokumentstudier, intervjuer samt observationer. Studiens resultat går i linje med de centrala teorierna inom konceptet Lean, vilket anammats och praktiseras av verksamheter av vitt skilda karaktärer. Utifrån den genomförda värdeflödesanalysen för aktuell produkt identifierades slöserier i det logistiska flödet, vilka analyseras och avhandlas. Utifrån den genomförda värdeflödesanalysen har förslag på önskat framtida läge formulerats och illustrerats med grund i befintlig processgruppering och - indelning, i vilken slöserierna minimerats. Utifrån studiens empiriska material och resultat skönjas ett utbildningsbehov i organisationen. Genom att öka den teoretiska och praktiska förståelsen för centrala delar, begrepp och verktyg inom konceptet Lean kan förbättringar inom företagets internlogistik uppnås, och i förlängningen, enligt teorin, för hela företaget. Arbetets flödesövergripande perspektiv medför vissa begränsningar. De ingående värdeadderande processerna har inte analyserats djupare än till deras flödesmässiga påverkan i form av takt och cykeltid, då detta är av processteknisk karaktär.

Page generated in 0.046 seconds